NPP Projection 9/11 Open



To do this evening/ was completed: Cleaned T1 35mm projectors before and after High Risk. Trailer reel has been re-inspected. I could not get the rewind to be totally smooth. I attempted four times to no avail. I think the reel will be fine in transit inside its can but just making note of it here.

Presentation Issues: Each changeover aside from reel two was out of frame. Adjusting framing took only a few seconds each time. Every reel was threaded with the countdown number centered in the frame plate. If it's something I missed during inspection I'd like to know. Maybe using the frame counter for each countdown would've helped identify the issue. Also, reel five went back out of frame half way through its run, then once more during the credits.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: High Risk intro and feature presentation went smoothly with one presentation note above.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24