Friday 12/16/2022 CLOSE -Chris-



To do this evening/ was completed:

Presentation Issues: I think you guys may have weak speaker in T2, hard overdrive buzz heard during a typically bombastic scene in Avatar: WoW! in which the villain-type space cats are firing grenades at the hero-type space cats. This scene really shows off the issue as they're firing screen-left-to-right so when the grenade hits the 7.1 surround plays it mostly off the rear right corner of the room and the problem child is one of the units up there. Couldn't quite discern which it was from behind the last row. The scene in question is roughly contained within the 1hr 22min-26min marks in the feature should anyone want to give it a listen. Sorry for the wasted read if you're already aware of this.

Preshow Clips/Playlist: Modified the PG_122122 trailer pack to include a 4.5 vol cue for the Spiderverse trailer I saw the current SPLs were using. Don't know if you guys have tech'd the Barbie teaser yet but I have it currently set to switch back to the standard Vol 4.0 for Barb after Spiderverse's trailer.

-Alec mentioned he thought the volume cue for Avatar: WoW! was too low at 5.5 and that he'd manually taken the show currently playing when I arrived to 5.8, after listening to both I think he was correct and have set the feature volume cue for 5.8 across all 4 Avatar SPLs. I took the last round in T1 to 6.0  and thought it sounded great so you may want to set it even higher if y'all concur.

-Built A1_Pinocchio_122222 (and it's OCAP equivalent) according to the trailer list

-Did the same for Strange World. Would've built the R-rated SPLs but we lack the Skinamarink trailer.

-Built a bare-bones SPL for Puss In Boots 2 (that one looks... bad italicized), still needs preshow content and feature cues.

-Checked the PG13 122222 feature SPLs agains the trailer doc, looks good.

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers): A poster arrived for missing (1/20), I slotted it in with the one-sheets for Plane.

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): checked this week against the scheduler, looked good.

Marquee updated?:N/A

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: Thanks for having me! I've taken the spare key home with me to make a copy so I'll be ready to go should this situation arise again. Will return OG key to Alec via WB.

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24