NPP Projection Close 2/23



To do this evening/ was completed:

Presentation Issues: Rounds 2 and 3 in T1: Same ceiling light flickering during trailers. Same trick with the emergency ceiling lights breaker did the trick, but only after repeatedly turning it on and off.

Heat shield on 35mm P2 in T4 would not stay shut--if anyone complained about a loud slamming noise during Dreamcatcher, it was me trying to slam it shut. Eventually opted to tape the handle to the lamphouse to keep it shut. 

Also: Animatrix ran smoothly in Dolby Digital but when I switched over to reel one of Dreamcatcher the 500 switched to SR--decided to run the whole film in SR at 7.1 on both processors. I could not see the green light or any light inside of the penthouse readers (the one Alec pointed out to me).

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Dreamcatcher intro and screening went very smoothly. Print is rewound heads out ready for inspection.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian