To do this evening/ was completed: Re-inspected Dead Calm, nothing new to report. Didn't schedule a pickup yet--can be done tomorrow.

BCB_2023 trailer downloaded and ingested, added to all trailer packs.

Suzume playlists built.

Wired mics and mixers set in T1 for tonight.

Tech'd Passages (5.0 vol), Juice (5.0 vol) and Wedding Banquet with programming--all good to go.

Scheduled all first run content for the upcoming week in TMS sans OCAP screenings, those still need to be added.

Sundays on Fire preshow content re-ingested to TMS.

Fast X ingested to T1.

Tetsuo: The Iron Man is downloading to the desktop--we received a few other features from Elizabeth Purcell (seems like this was only sent to the KDM email). Looks like Smithereens will need to be downloaded from this link too. I unarchived this to the NPP hard drive. This is formatted for ingesting so we can locally ingest the feature from this drive.

Presentation Issues:

Preshow Clips/Playlist: Chenelle and I went over all the content and run of show for the NewFest event tonight. I was here to get things started and set-up in Trees. Went over everything with McKegg for the Q&A and end of show, which is very straightforward.

Trailer Updates:

Special Events/ AV set up: The breakers for the wash spotlights were off in Theater 1 (these were previously labeled as "Left" and "Center" Spotlights, but I relabeled them as Wash 1 & 2). These breakers can stay on, it's just the Moving Spots breaker that we should turn off when we're not using it,

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content): The 2001 print never got picked up. I scheduled a pickup for tomorrow.

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: I checked the 1.85 lenses/plates on both of the Theater 1 projectors, while neither is perfect projector 1 is definitely fine as it is--I ran both a loop and a reel of Cool World and they looked good. Projector 2 will need to be moved again slightly, John's going to help us out on Friday.

I reinstalled the 701 penthouse reader to projector 1 in Theater 4, since the reader itself wasn't the problem. Tested it out and it's working great. I will put the 702 back on projector 1 in Theater 6 so things are back as they were.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: