NPP Projection Report 6/28 Close

To do this evening/ was completed: Kept an eye on theaters 1, 2, and 6 for manual starts and/or server pauses throughout the evening; one manual start in T2 was scheduled on the cue sheets + T6 did not start its final round as scheduled and was delayed a couple minutes while I manually loaded the playlist

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Set up karaoke at Trees Lounge around 7PM and got everything started on schedule; Eliel pointed out to me that the HDMI audio connection was wired behind the bench beneath the screen so we used that this evening to eliminate the extra cabling to the XLR splitter and 1/8" cable

The mixer in T4 needed to be set up before the Alien from L.A. screening began; I tested the spotlights and noticed the one to the left hand side (when facing the audience) was not working and will need its batteries changed -- there was no time to do so before the pre-show started -- and let Cristina know to use the one to her right only

Alien from L.A. screening went very smoothly (as did Cristina's intro) and the picture and sound were top quality throughout; I re-inspected the print and placed each reel back onto its shipping reel

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?: Rearranged the letters on middle row and added Indiana Jones and the Dial of Destiny

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes: Seat removed from T2 was put back following the end of the second round; checked the roof hatch in T2 and the lock/hatch are secured

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian