NPP Projection Close 7/17

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: NoBudge event in T2 ran smoothly (Wyatt stepped in to assist Desmond with breaking down the set up for the Q&A since I needed to start the print in T1) and returned the mics to the booth after the final round concluded in this auditorium

Twister screening went off without a hitch and the crowd seemed to really enjoy the show (there were a few minor issues to do with the luminance of the bulb in projector 2 and the aperture plates moving ever so slightly during the course of the show but these were largely imperceptible to the audience)

Ordering/Receiving (posters & trailers): Aporia one sheets were delivered and stored behind 3/7

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Twister print is tails out beneath the workbench in T1 and can be re-inspected tomorrow

Asset tracking doc updated/checked?:

Maintenance/cleaning: 

Cue sheets updated/checked (every shift): Yes

Marquee updated?: Removed Twister and added letters for Runaway

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian