NPP Projection 8/28 Admin Jack/Alec



To do this evening/ was completed: Scheduled the week in TMS and filled in all days of the cue sheets.

New preshow content (Class of 08 trailer and Action preshow for Oldboy) ingested and added to the listed playlists/packs.

Kung Fu Panda ingested to T2.

Tech'd Speed Racer with Desmond, during which two odd things occurred: first the image was showing an even shadow on top and bottom, basically a shadow letterbox. Right after I noticed that the projector (P2) was smoking near the lamphouse/dowser--killed the motor and lamp immediately and opened the port glass window. Switched over to the other projector to finish the tech, and then tried to replicate the issues on P2 afterward with Alec and both the letterbox and smoke had dissipated. So not sure what happened really. We should run a scope reel tomorrow during admin to see if the plate really needs filing.

Changed the battery in T6 IMB - Alec (Jack observed)

Ordered ethernet cables for the USB extender, will use this in T5 for the Captiview transmitter - Alec

Started converting the files for the Industrial Musicals screening 9/19. The second file in the program is converting now - Alec

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian