NPP Projection Admin 9/12 Jack/Alec



To do this evening/ was completed: Started a new DCP for Pavement: Range Life last night in 4/6, it should finish transcoding tonight. Please ingest to Theater 1 once it finishes, we're teching this tomorrow for an event on Thursday at noon.

Swapped out the Marie Antoinette posters, put the old stuff back in. The MA posters are rolled up inside tubes residing in 3/7.

Reset all the dimmer panels after being notified the fire alarm went off last night, checked all theaters to make sure everything was back to normal.

Set up a mic and mixer in T4 for the intro tonight--the gear was still down in T5 with all the power on when I found it.

Ran loops for Secret Ceremony--framing and focus set. 

T6 round three Opp wasn't scheduled as OCAP--fixed that.

Tech'd all NoBudge shorts with Desmond--volumes and aspect ratios logged--they all look and sound great.

Removed the CallForSubs trailer as we wait to receive and ingest V3.

Started building next week's cue sheets, without listing the end credit times, as we are waiting on an updated version of one of the trailers for most of the shows.

Shiva Baby Q&A clip lost image for the second time (that we've been made aware of) today. This happened a few days ago in T7--seemed like the clip itself was the issue and indeed it is. The picture cuts out about 16.5 minutes in.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Teched the performance content for Death Becomes Her (minus one of the songs), note volumes and spotlight settings for everything.

Teched our Sigh of Origin DCP for the private event on Thursday. Looked and sounded great. They want to play the movie at 7.0.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Continued converting the Industrial Musicals DCPs, the 8th short/video is converting, two left.

Outgoing/Shipping (content):

Print/video Inspection: Added a full countdown to reel 2 of Prince of Darkness. We can leave it on when we send it back.

Asset tracking doc updated/checked?:

Maintenance/cleaning: Adjusted the amperage for both lamps in the T4 35mm projectors so the brightness is more even between machines.

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24