NPP Projection Admin 9/14



To do this evening/ was completed: Checked Step Brothers for tonight, it's good to go. -AL

We're remaking the DCP of Like Water for Chocolate, the one we had didn't have subtitles. This is transcoding onto the DCPII drive on the 4/6 iMac. It should be ready to ingest tomorrow morning. -AL

Started transcoding Krull to DCP for the private event on the 21st. -AL

Reinspected and packed up Fear of a Black Hat. -AL

Set up the chairs and mics for the Pavement event in T1. Made sure Alex and his crew felt happy and comfortable, both in the booth and in the theatre. Briefly tech'd the DCP and wash with Cristina and Alex. Whole thing went super well! Everyone was very pleased. Thanks, all, for helping to make this as smooth as possible. 
Set up the mics and chairs in T2 for this evening. I patched in 2 wired mics (they initially told me 2 despite it saying 1 on the event memo. An extra--should they need it--certainly won't hurt. 
I took down the letters on the marquee for Pavement and put up the Sigh of Origin.
Contacted DHL for Secret Ceremony. They'll be picking it up tomorrow between 10am and 5pm. 
Like Water for Chocolate is transcoding to the DCPII drive in 4/6. 
I downloaded Chestnut again from the NewFest template since I couldn't find this on the desktop today...this is downloading in T1.  - LH

Ingested the V3 CallForSubs trailer and updated all trailer packs.

Finished up the coming week's cue sheets.

Downloaded and ingested all the available 9/22 content: Forecasts, Dumb Money preshow content and NoBudge preshow content.

Swapped out Gran Turismo poster for Haunting, The Creator now outside in a coming soon slot.

Inspected The Little Princess 35mm. Overall the print is in pretty good condition, almost no splices or repairs. Rewound onto its shipping reels for now.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24