NPP Projection Admin 12/12


To do this evening/ was completed: Built 12/15 T6 playlists and scheduled the upcoming week in TMS, then built the cue sheets for 12/15 - 12/21. 

Silent Night Deadly Night content removed from T2.

Beyond Utopia event in T7 went smoothly last night, equipment broken down afterward.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Ran loops for the screening in 1 tonight. -AL

Set up the HDMI connection at the front of the theater in T3 for a staff meeting on Thursday. They'll just need to connect to the HDMI cable under the curtain. To get their screen up and sound through the speakers select the HDMI 1.78 channel on the projector (I made it one of the preferred channels), and switch the CP750 to Non-Sync. -AL

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting Wizard of Oz, all reels are tails out in the cans. -AL

Asset tracking doc updated/checked?:

Maintenance/cleaning: Changed a lightbulb in T3 ceiling -AL

Disconnected the surround speaker in T3 which was buzzing. A replacement is on the way. I also noticed the right surround speaker toward the back of the theater (not the right rear surround, but the third surround speaker if you're counting from the screen back) was starting to buzz as well (after disconnecting each one at a time and listening to the test the middle one was much worse), so DMS is sending a replacement for that, but I left it connected so we don't just have one speaker playing the RS audio. -AL

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian