NPP Projection Close 2/28

To do this evening/ was completed:

Presentation Issues: Wireless mics in theater 2 were still configured for the Shouting at the Screen event earlier this month and had to be adjusted for the introduction to The Zone of Interest (there was also an improperly placed house lights down cue in this SPL which caused the auditorium to go dark during the pre-show -- I noticed this before the MODs alerted me to it and brought the lights up from the booth)

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Aside from the aforementioned trouble in theater 2, the private screening for The Zone of Interest went well, as did the Opening Nite screening for the NSF (the intro and Q&A for this event was recorded and saved to the desktop in booth 1 -- all mics were returned to the booths to charge) 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Re-inspected The Last Dragon and placed it back on its house reels

Asset tracking doc updated/checked?:

Maintenance/cleaning: One of the screws holding up the keyboard tray on the sound rack in booth 1 came loose -- the threading seems to be stripped -- and is now hanging at an angle (not sure if we have any parts to spare in the building/available for order)

Cue sheets updated/checked (every shift): Double checked against the TMS and website/initialed for confirmation (there was one missing SPL for Dune 2 in theater 1 -- seemed to be some confusion about a listing on the website)

Marquee updated?: Removed The Last Dragon and added letters for Pumping Iron II and Dune 2

Posters updated?: Added a "now showing" snipe above Dune 2

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian