NPP Projection Report 3/30 Open


To do this evening/ was completed:

Presentation Issues: Couple delayed feature starts today-- the first round in T6 was scheduled as Ghostbusters instead of Godzilla. Wyatt radio'd me once the movie started that it was the wrong one and I switched it. Oddly Godzilla was correctly scheduled for tomorrow when I checked.

Theater 3 had that issue again today, it was well into the preshow for the second round when I noticed it. Was prepared to pause the preshow and restart the projector but I went down to the theater/booth just to see what was happening (if cleaning lights stayed on and volume cues didn't go through as Jack had mentioned), but preshow was playing normally at the correct volume with the house lights at the proper level. Since things seemed to be playing normally, I waited in the booth for trailers to start to make sure the lights went off, which they did, but volume didn't change for the trailers. At this point I thought I could just set the volumes manually and restart before the next round, but it turns out encrypted content will not play with the projector/server in this state, so the feature was skipped over and cleaning lights came up. I then restarted the projector and got the movie on about 7-8 minutes late. That settled things for this round but abut 15 minutes into the movie, I noticed the error messages for Theater 3 on the TMS again. Since the feature had already started playing with the server recognizing the active KDM, it continued normally.

Lillian powered down the T3 projector between rounds to restart, and in the meantime we'd heard from Jerry who asked us to check the plugs, which was when I noticed the switch above the plugs on the projector is set to "A only" instead of "A+B" despite having power cords connected to both the A and B plugs on the projector. My strong feeling is that this is what's been causing the issue based on Jerry's assumption that the issue could be power related. Lillian will set the switch to the correct position after powering down the projector at the end of the night.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Interstellar went well, the print is ready to roll again tomorrow. Will, Matthew will be bringing the print over to Williamsburg tomorrow for their show on Tuesday.

Set up the DJ in Lo-Res, for the sweet sixteen party.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian