NPP Projection Report 4/18 Admin


To do this evening/ was completed: The private event tomorrow morning has been moved to T1 so DMS can work in T2. Also the parts for T3 came, so they can replace those while they're here.

T2 controls were offline when I got in this morning. I reseated all three boards (and cleaned them and the cage of some dust as well) then powered it back up, re-armed the marriage, and it came back online after that. Played a full A1 playlist after that to make sure it held on and it did.

Will be taking the DCPII hard drive to a date recovery service on Sunday (the next time they're open).

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers): Ordered Abigail posters, they should be here tomorrow.

Ordering/Receiving (content): From Beyond print arrived.

Converted the Fleischer program to DCP and ingested it to Theater 2.

Ingested 10 Things I Hate About You to theater 3.

Outgoing/Shipping (content):

Print/video Inspection: Inspected From Beyond, it's in good shape. On house reels and pictures are on the drive.

Asset tracking doc updated/checked?:

Maintenance/cleaning: Changed the left side surround speaker in Theater 3. Only two of those old surrounds left in there now. We already have one new speaker, and I feel like there should be an extra set of mounts laying around somewhere. If not we can order some and I'll replace the last two sooner rather than later.

Printed more 35mm print info cards.

Ordered a bunch of supplies: gloves, paper tape, alcohol wipes, air cans.

Cue sheets updated/checked (every shift):

Marquee updated?: Put the 35mm titles back up: River Wild, From Beyond, and Runaway Train are up right now.

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian