NPP Projection Close 10/8

To do this evening/ was completed: Spent the majority of the evening building the cue sheets for the week ahead and made sure to cross reference the schedule on the TMS so that the start and end credits were accurate. There are still a handful of NewFest shows whose cues need to be filled out and other special events/first runs toward the end of the week without SPLs that can be added to in time

Presentation Issues: Final round in theater 2 was paused and did not start as scheduled. This was delayed by a few minutes as I was troubleshooting the issue at Trees around the same time the pre-show was meant to begin and MOD radioed

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Set up for trivia at Trees this evening. Ultimately had to troubleshoot a feedback issue since the dials for the output levels on the bench panel were mysteriously turned all the way down, leading me to believe something was wrong with the cables/the panel itself. Got everything working normally again once I realized these were turned off and set them to their normal levels (note: I left the output dials at the halfway mark so as to avoid any confusion during the next event)

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Double checked and initialed

Marquee updated?:

Posters updated?: Tossed a bunch of old posters from the trivia section and organized the remaining posters for this event

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes: 9V AC/DC power adapter was delivered and brought to 4/6