Projection Open 10/6



To do this evening/ was completed: A bit of a chaotic morning here with double events during the first round and a slightly tight conclusion to one of them, but otherwise fine. 

Presentation Issues: A guest asked for a closed caption device in Theater 1 for Joker and once I brought it down, they asked if a person sitting at the tale next to them (who I assume were their parents), could have one too. I went to the closet to get the other one and even though it looked like it was plugged in, the battery was dead. I informed the guests and made sure the device was plugged into a charger that worked. 

Are we waiting on something, like a part for the clamps or new screws for the other two that are out of commission? Cause they appear to be working fine. 

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: My first Sundays on Fire went off fairly well despite a lot of elements complicating it. The trailers reel had no head, but per Lillian's advice, I threaded it to the image and just kicked it off immediately. The transition into the feature was smooth, but my first changeover was a little rough because the cue was not where I expected, but it was only a little bit of black. 

During the last reel, which of course is the shortest one, I got a ping from the manager about someone needing a seat removed in 3. I rushed down there and it was right as the lights were going down and thankfully by the time I got back up to 1 it was RIGHT at the final frame of the reel and the dismount went well. The audience was in the dark a bit for the credits, but they weren't that long to begin with. 

The birthday party in Theater 7 went well too. Was there to unpause the slide and roll right into the feature. 

Print is fully rewound on our house reels ready for re-inspection. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: I cleaned the 35mm projectors in 1 throughly since the print was a little vinegary. 

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian