NPP Projection Close 2/25
To do this evening/ was completed:
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Mississippi Masala introduction and screening in theater 1 this evening went smoothly + Sugarcane played in theater 3 without any issue
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Walter came by this evening and dropped off his trailer for Full Metal Jacket + Demons 2 was delivered and brought up to booth 1
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Mississippi Masala introduction and screening in theater 1 this evening went smoothly + Sugarcane played in theater 3 without any issue
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Walter came by this evening and dropped off his trailer for Full Metal Jacket + Demons 2 was delivered and brought up to booth 1
Began converting the SU2025 content for the private event to DCP in booth 1 (saved to the DCPIII drive since the desktop does not have enough disk space...the feature is over 100GB...20 hours remaining)
Outgoing/Shipping (content):
Print/video Inspection: Added a few feet of leader to the Full Metal Jacket trailer and placed it on a house reel (it is in excellent condition save for some surface scratches throughout) + finished inspecting Demons 2 and uploaded stills to the shared drive
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked all cues/tomorrow's schedule
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?:
Additional Notes:
Outgoing/Shipping (content):
Print/video Inspection: Added a few feet of leader to the Full Metal Jacket trailer and placed it on a house reel (it is in excellent condition save for some surface scratches throughout) + finished inspecting Demons 2 and uploaded stills to the shared drive
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked all cues/tomorrow's schedule
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment