To do this evening/ was completed:

Presentation Issues: A guest asked for a closed captioning device for We Live in Time in theater 6 (second to last round) which did not display any dialogue even after the feature had started. I took back the device and tried testing a separate to no avail. I tested each of these devices in theater 4 to make sure they were functional and they worked just fine, so I double checked the film's CPL and it had all available accessibility features to allow for the captions to work. Despite this, and several failed attempts to reboot the Fidelio transmitter and closed captioning device, I had to ask the MODs to speak to the guest about the technical issue (update: I tested both devices again during the following round and they failed to display captions despite the film  -- Smile 2 -- having all accessibility features)

Preshow Clips/Playlist: Built all first run show playlists for the week of 11/8 (including Heretic) and a special event show playlist for March of the Penguins

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers): Queer one sheets and a poster for The Gods of Times Square were delivered and stored behind 3/7

Ordering/Receiving (content): Downloaded and ingested all forecast and updated trailer content for the week of 11/8 

NoBudge content finished downloading this evening + began converting these shorts to DCP and saved them to the Almodovar drive (the desktop was running slowly this evening so I was unable to get through much of the transfers in DCP-o-matic)

Heretic feature content was made available and downloaded to the TMS (only the CCAP file has 5.1 and 7.1 audio -- the OCAP file has 5.1 audio) + March of the Penguins feature content was made available and downloaded to the TMS

Outgoing/Shipping (content): 

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?: Removed The Substance from outside and replaced it with Emilia Perez

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: A pair of ethernet patch cables were delivered and brought up to the 4/6 booth