NPP Projection Admin 12/3 + 12/2 Close

To do this evening/ was completed: Hi all, Screenwriter was installed today. Since we will begin going over this tomorrow in the meeting I won't go into too much detail but the basic operation at least for tonight should be pretty self-explanatory. There are a few fairly major quirks we still need to work out, but there are ways to get around them in the meantime. These are: -It's not connected to the Deluxe FilmVault (f/k/a EclairPlay), we will have to ingest features & trailers directly onto an IMS for now and then transfer it to the TMS. Chris from DMS is talking to AAM (producers of Screenwriter) and should hopefully have this worked out ASAP. -We tried to connect the KDM email to automatically load new keys as they're delivered but it's not working. Working on this with AAM, we'll have to ingest keys manually (like we're used to doing with the Dolby TMS) for now. -We also tried setting up a share folder which we can download preshow and feature DCPs to ...

NPP Projection Admin (Alec/Will) 12/2/24

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up:  Ovid, New York filmmakers dropped by this morning to tech the film in 3 and watched it in full. Made a few minor adjustments to the show playlist and tested mics/set up chairs for the Q&A this evening - WB Ran loops for the 1.85 lenses and plates in theater 1. Ran reel 1 of Ghost in the Shell 2  for Desmond this afternoon (volume has been noted/projectors cleaned/reel was rewound back to its start) -WB Set up two mics and two directors chairs in Theater 7 for the private event with intro/Q&A tonight. They confirmed later in the day they'll need two mics on stands for the intro and 3 mics and 3 chairs for the Q&A. I pulled out a 3rd mic and another stand and brought to 4/6 -AL Tech'd the Miss Malice pre-show with Desmond and Alec in theater 2 for The Matrix and adjusted volume levels for each performance as needed. Added a lights up cue to the...

NPP Projection Open 12/1

To do this evening/ was completed: Chinatown went smoothly again. Re-inspected the print after the screening and packed it up. Came with return label so we'll schedule a pickup for it tonight or tomorrow. Matthew showed me how to remove the T2 unit of ADA seats in the back row. It's kind of a two-person effort and there are a few particular screws that need to be loosened somewhat. I have pictures that I can provide to everyone and we can update the manual if necessary. For some reason I was not able to load the Heretic playlist via TMS controls in T6. I kept getting a red error message, the specifics of which I forgot to write down. But something along the lines of playlist cannot be loaded at this time. Ended up starting the playlist through IMS but found that odd. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspectio...

Projection Close 11/30

Image
To do this evening/ was completed: Attached photos of the ADA sled seats closest to the exit. I know Juan worked on these not that long ago since the wood underneath was starting to come up. My assumption is that he didn't realize they need to come out. I haven't had to take these out in a while but, yes, they should mostly pop out once you take the back screws off. We've taken them out just fine in the past. I took a look tonight though, and they're bolted in. I left the screws in the booth along with the driver. We should definitely develop a better mount situation for these. We'll go over this during our projection meeting, too.  Presentation Issues: No issues this evening, apart from what Jack faced with the screws.  I put the other ADA seat (at the end of the row) back.  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Took a look at the Ovid DCP just to make sure it's good.  Ordering/Receiving (posters & trailers): Ordering/Receivin...

NPP Projection Open 11/30

To do this evening/ was completed: Chinatown print went very smoothly. Ready for round two tomorrow. Ingested Ovid feature and preshow, transferred to T3. Got a call to remove all of the ADA seats in the last row of T2. Attempted to do so but the block of seats is held down by dozens of screws, many of which are inaccessible. If most of those screws can be permanently removed, and some of the metal bands that hold down the block can be removed as well then the unit can become ADA-viable. As it stands, it is near-impossible to remove those seats. MOD decided to just remove the seat on the end and ask guests to switch seats with each other. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?:...

NPP Projection Report 11/29 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Swapped the CCAP version of Black Box Diaries into the playlist for Monday, they want this one shown. Trailer Updates: Special Events/ AV set up: Put the scope lenses and plates in the T4 projectors for Chinatown . When you run loops, Jack, use the "masking FILM 239" cue, I put this one in the playlist. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received the Jiang Hu print for Sundays on Fire. Put Ghost in the Shell 2 on house reels Outgoing/Shipping (content): Deleted a lot of old preshow and trailers we don't need anymore. We also had several old shorts which I deleted. Print/video Inspection: Inspected Jiang Hu , it's in very good shape. On house reels. Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Checked cues and the schedule for tomorrow and Sunday. The 4:20 Moana in Theater 2 was listed as Wic...

Projection Open & Close - Thanksgiving

To do this evening/ was completed: A rather quiet evening apart from one absolutely devastated child that was screaming so loud I came out of the booth. Gave him my little shaun the sheep toy to play with for a bit since it's nice and soft and, to mine and his Mother's delight, the screams immediately stopped.  Presentation Issues: Preshow Clips/Playlist: Queer playlists have been built for both 11/29 and 12/06. Black Box Diaries playlist built. I'll check in with Chenelle about music.  Trailer Updates: Special Events/ AV set up: DCP'd and ingested the rest of the music for the Matrix show, though we're still missing one. I let Desmond know. I also noticed the drag show notes from Scream are in the event memo, so it's a little confusing. I let Desmond know about this as well.  I have a Matrix tech playlist going.  I have Ovid running through Handbrake right now. This will adjust the dimensions properly before we DCP it. I should've left a better note abou...