Posts

Showing posts from July, 2026

NPP Projection Admin 7/21

To do this evening/ was completed: Ingested: WHAM, Spiderman: Brand New Day, Her Private Hell and I Want Your Sex features to LMS. Built playlists for Spiderman and Hell. LMS scheduled for coming week. Cleaned projector/platter for tonight's shows. Tech'd Christine and NoBudge shorts with Desmond. We forgot to DCP one of the NoBudge shorts, Call Grandma. It's finished and ingested now but we'll need to look at it sometime before next week. Playlist built for NoBudge with volume and aspect cues. Josie and the Pussycats cues don't go live until tomorrow. Christine playlist built, outro slide downloaded/ingested.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Took a look at all of Supercop 2 and it's in relatively good shape. Apart from some vinegary stench, the color and picture are solid. Threw ...

NPP Projection Close 7/20

To do this evening/ was completed: Odyssey 35mm went smoothly. Everything cleaned after both shows. Made the last DarkRoom Shorts DCP. Transferred Christine and some NoBudge to T1 for techs tomorrow.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 7/20

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ran a loop on projector 1 for The Odyssey  this evening and sharpened the focus in the center/bottom portion of the frame + ran house checks in all auditoriums this morning A photoshoot took place outside by the marquee and in theater 1 this afternoon. Raekwon was present to assist the guests. I brought the auditorium lights down and placed the NH logo on screen. They wrapped quickly and cleared out before the first round Ordering/Receiving (posters & trailers): I Want Your Sex one sheets were delivered and stored behind 3/7 Ordering/Receiving (content): Continued converting the DarkRoom NonFilms shorts to DCP and saved them to the Shared drive Stir of Echoes  and Once A Cop (for Sundays on Fire) prints were delivered and brought up to their respective theaters this afternoon Transferred Looper  to the LMS Outgoing/Shipping (content): Print/video...

Projection Close 7/19

To do this evening/ was completed: Two more great Odyssey shows today. Big crowds, as expected! Platter and projector are both clean and ready to go for tomorrow, just be sure to run a loop beforehand. Thanks! Presentation Issues: Did a reset for the captiview in T7 up in the crawl space since it wasn't working, but the patron (Gustavo, one of our regulars) was super understanding about the delay. Working just fine now. Captiview is back charging. Thank you to James for alerting me and helping me out with this whilst we worked around the Odyssey. This was during last round.  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes.  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Addit...

NPP Projection Report 7/19 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Final world cup match is on in Trees. Odyssey 35mm continues to run smoothly. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Did a pretty big overhaul of the front side--removed Supergirl , Disclosure Day , Maddie's Secret , and World Cup and rearranged all the remaining titles. Also took care of the rental for tomorrow on the 35mm side. Posters updated?: I started updating posters; took down Jackass and Supergirl and put Oak Street and Tony up. Backrooms and Disclosure Day still need to come down and be replaced with Evil Dead and a coming soon. Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/18 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Swapped the official studio DCP of Source Code into the playlist after checking it this morning. Trailer Updates: Special Events/ AV set up: Source Code and She's the Man both played nicely. Odyssey 35mm shows are still going well. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: I ordered a new charging cord for the walkie. The block is fine but the original cord doesn't work. There's one we can use for now but the one I ordered is better. Keep an eye out for it. Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 7/17

To do this evening/ was completed: Both Odyssey 35mm shows went smoothly. Projector/platter cleaned after each show. Source Code in-house DCP finished up around 11 pm. I built and scheduled a playlist then looked at the DCP in T3. It looks and sounds good to me. At the same time the official DCP was delivered to the Deluxe portal. I ingested that as well at the end of the night but did not put it on screen, so that can get looked at tomorrow morning. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/17

To do this evening/ was completed: Staff screening of The Odyssey on 35mm went super well, decent turn out too! Cleaned the platter and the projector/port glass top to bottom.  Ran the screener of It Ends for the programmers in T3.  Presentation Issues: Preshow Clips/Playlist: Started building A1 playlists for 7/24.  Trailer Updates: Ingested new trailers for 7/24 (we still need some content that will be available come this Monday) Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Lionsgate really dropped the ball on getting us a DCP for Source Code (few problems on their end, nothing to do with us) but Alec sent a great file of the film, which I have DCPing in 4/6 and it should be done in just a few hours. Please ingest this ASAP and build a playlist. If you can get eyes on it before you leave tonight, that would be great!  Ingested The Producers to the LMS.  Ingested new content from Kat for 7/24! Outgo...

NPP Projection Report 7/16 Close

To do this evening/ was completed: Presentation Issues: None, both Odyssey 35 shows went smoothly. Preshow Clips/Playlist: I added cues to the Odyssey 35mm playlist to switch sound to Multi-Ch Analog and set the volume on the 750. Updated the DCP Odyssey playlist with the lights up cue for Theater 2. Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Alcohol wipes arrived Cue sheets updated/checked (every shift): I adjusted the formula for The Odyssey for the lights coming up later in the credits. All shows Friday on have been updated on the cue sheets, too. Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 7/15

To do this evening/ was completed: Continued on with Dark Room Shorts, they're in the DarkRoom folder on the Share drive. Wild Inside ingested to LMS and T2. Jurassic Park went smoothly. Mic back in booth, print back on shipping reels. No issues with the P1 lamp. There's a few manual starts tomorrow night in T5 and T7. Just a heads up. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/15

To do this evening/ was completed: Staff Screenings for The Odyssey have been scheduled on the LMS, blocked on the calendar and sent out on 7shifts. I will be running a test of this tomorrow morning, Alec will be running the shows in the evening. FYI - if you didn't already know, no one but projection is allowed to witness the test tomorrow. - L Presentation Issues: Preshow Clips/Playlist: Staff Screening playlists built.  Trailer Updates: Special Events/ AV set up: Picked up the DCP of Christine from the MOD office. Transferred it to the Share folder and started ingesting it. - L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Gave John a lil nudge to check in on the DCP delivery for Source Code since no info is available still. - L Received and ingested the DCP of Looper and It Ends, transferred the screener of It Ends to T3 for the programmers. - L Currently downloading the DCP of Wild Inside, which we received today via link. This is downloading to th...

NPP Projection Close 7/14

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Converted and updated the intro slide (RIP Sam Neill) for Jurassic Park III  at Desmond's request Trailer Updates: Special Events/ AV set up: World Cup semifinal on at Trees this afternoon Set up and tested the turntable at Trees for the Pre-Code Parade screening after party; broke down everything once the DJ set ended (Mr. Kline got the memo and was done within an hour) Ran loops prior to Love Me Tonight . All went well save for the changeover between reels 3 and 4. With my head craned over the machine to see the cues I did not realize that the lamp in projector 1 was off, presumably from the heat in the booth pushing it to its limit, and changed over to reel 4 and a black screen. I stopped the film and quickly tried powering the lamp on and off again, switched it from auto to manual and flipped the power switch a second time to no avail, and finally resorted to throwing the breakers off and...

NPP Projection Close 7/13

To do this evening/ was completed: Ingested FLAT Odyssey feature to LMS. Scheduled coming week in LMS excluding Josie and the Pussycats.  State Your Name went smoothly. One of the T1 mics was not turning on, and when I would connect it to the charging dock the charging lights would not come on, but they would come on for other microphones. I ended up connecting one of the T2 mics for the Q&A. Equipment broken down afterward and hard drive returned to the director. Started converting DarkRoom shorts: 7 Piano Sketches converting right now. Third box of the Odyssey print arrived. Put it with the others in T1. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on f...

Projection Admin 7/13

To do this evening/ was completed: We received the first two reels of the Odyssey , which I put in T1. The last reel should be coming any minute now, really, so keep an eye out for it. When it arrives, please put it safely up against the wall like the other two. Thanks! - L Note: Keys for The Odyssey will come through on the 15th and open up on the 16th.  Presentation Issues: No issues. I put the fan on in T1 - L Preshow Clips/Playlist: Built the 35mm playlists for The Odyssey and scheduled all Thursday shows. - L Double checked  The Invite  babies show playlist for tomorrow morning and lowered most of the volume cues as the pre-show and feature were a bit loud + updated the State Your Name pre-show after John Woods asked that we use the MusicDriven one instead of GenericNYC -WB Trailer Updates: Special Events/ AV set up: Will(iam) set everything up for State Your Name tonight (thanks, Will!) and I copied the DCP over from the George Ivan drive to the director's drive, ...

NPP Projection Close 7/12

To do this evening/ was completed: Built playlist for She's the Man. Waiting on content for the other SEs. Ingested State Your Name to LMS and T1. Put it on screen in T1, looks and sounds good. 4.0-4.2 sounds good for volume, double-check tomorrow if you like. No credits, just fades out right at the end. Reached out to John about the preshow for State Your Name. We don't have a specific Graffiti preshow, only Generic NYC and Brooklyn. He said he'd reach out to Kat. I'm sure we'll have an update tomorrow. For now I built a playlist for the show with Generic NYC preshow content. Saw the emails about transferring Fountain print to Roxy. Are we going to schedule shipping or just do a pick-up like we have previously with Illyse? New brunch and 35mm letters up. Continued on with NoBudge51: Old Fantasy and Power Lines converted and designated to Share drive. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters...

NPP Projection Open 7/12

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Double checked picture and sound for  Palestine '36  in theater 3; feature played without any issues  Ran loops prior to  The Fountain  screening in theater 4; the show went well save for a brief battle with framing during the third reel Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Placed  The Fountain back on its shipping reels and sealed the canisters Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: ADA seat(s) was removed for a guest during the second round in theater 2 and placed back after the show

Projection Close 7/11

To do this evening/ was completed: Quiet night on the projection side of things.  Kept an eye on booth 1 throughout the evening and monitored volume in the theatre.  Kept the World Cup going in Trees.  Presentation Issues: Preshow Clips/Playlist: Double checked the new A1 playlists.  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested She's the Man to the LMS.  Outgoing/Shipping (content): Reached out to HFC to propose a game plan for the third reel of Save the Last Dance.  Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/11 Open

To do this evening/ was completed: The AC is off in the Theater 1 booth until Palco comes to fix it on Monday. I put one of the big blue air movers in there with the port window closest to the rack open. It's not too bad in there but keep an eye on it. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The Fountain went very well. Rewound the print for tomorrow and cleaned the projectors. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The State Your Name DCP will finish at some point tomorrow. It should finish when someone is here (i.e. not overnight) so please keep an eye on it and ingest it once it's done if possible. Outgoing/Shipping (content): We still have a reel of Save the Last Dance on a house reel in 4/6, so this will need to be shipped back separately since the rest went out yesterday. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cleaned and re-greased the gears...

NPP Projection Close 7/10

Image
To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers):  Maddie's Secret and Wild Inside  one sheets were delivered and stored behind 3/7 Ordering/Receiving (content): Continued converting NoBudge 51 shorts to DCP (saved  Subject of Desire and Noumena to the Shared drive) She's the Man feature content was delivered via Deluxe this evening. Should be on the FilmVault portal in the next few days Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cleaned both 35mm projectors in theater 4 Around 10:45PM, Jared radioed about a leak coming through the server station ceiling in theater 1, and asked me to check on the booth A/C. I went down and noticed a small puddle that was being blocked by the two bulb boxes against the wall beneath it (these boxes are a bit soft from absorbing the water that was dripping ...

NPP Projection Close 7/9

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons event started on schedule and without issue; broke everything down after the show Ordering/Receiving (posters & trailers): Ordering/Receiving (content): John Woods texted about the status of the State Your Name drive and if it was ready for pickup. I said it was before realizing its source file was not copied to our drive and was converting from the filmmaker's. For whatever reason, probably the original .mov file being massive, the DCP-o-matic program is currently saying it will take the course of the weekend to finish. John will check back in tomorrow but I'm not confident it will progress much faster than its current rate Outgoing/Shipping (content): Print/video Inspection: Finished inspecting Jurassic Park III  in booth 1 Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?...

NPP Projection Report 7/9 Admin

To do this evening/ was completed: Just a note on marquee letters - please try to organize them/put them back. I found loads just sitting on top of the bookshelf. It will make everyone's life easier if you clean up as you go. Thank you! - L Presentation Issues: Preshow Clips/Playlist: Built a screener playlist for tomorrow/s viewing of The Wrong Girls, transferred the film to T3 for the programmers. - L Tech'd Palestine 36, adjusted playlist. Tech'd Evil Dead Burn and Maddie's Secret, playlists ready to go. - L Trailer Updates: Special Events/ AV set up: More Odyssey (and possibly Camp Miasma ) 35mm prep: we have a working make up table for Theater 4 which I set up today. It's working well and I put a test reel on the platter up here. Ran it through the projector, too. Looking good. Setup the Aja, spots board, mixer and wireless receiver in T1 for Spoons tonight. Please remember to use Digital 4 for sound. Mics are charging and the stands have been setup by the tab...

NPP Projection Close 7/8

To do this evening/ was completed: Downloaded all NoBudge shorts to the NoBudge folder, excluding the one short we're still waiting on. Inspected reels 2 - 5 of Love Me Tonight. Good condition. On house reels. Save the Last Dance went smoothly. Print is back on shipping reels except for reel three. That shipping reel is broken. Mic and mixer broken down after the show. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/8

To do this evening/ was completed: Staff Screenings have been blocked on the calendar, scheduled on the LMS and sent out on 7shifts. - L Had our cinema meeting - we're good on content! We should receive tracking for the Odyssey soon (35mm). - L Setup a closed captioning device in T7, which has been put back.  Presentation Issues: Preshow Clips/Playlist: Tech'd Moana in T2. All good. - L Trailer Updates: Special Events/ AV set up: Ran loops for and setup the mixer/mic in T4. Tested everything. Should be a good show tonight! I checked the playlist.  - L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Hunted down the keys for Jackass, so we're all good for Friday onwards now. Additionally, I uploaded loads of KMDs that were sent to our email addresses, but that never uploaded automatically to the LMS. - L We received the shorts for No Budge 51 (sans one short, actually) but I've started downloading them to the desktop in a NoBudge 51 folder, and ...

NPP Projection Close 7/7

To do this evening/ was completed: Presentation Issues: No further issues with theater 3 this evening Preshow Clips/Playlist: Added volume and credits light cues to the  Maddie's Secret  show playlist; still waiting on pre-show content for The Odyssey Trailer Updates: Special Events/ AV set up: Brought down merch from 4/6 to the lobby with John Woods + Romeo's Distress screening in theater 1; mixer/mic transmitter have been organized and placed back beneath the curtain *the event staff will be back tomorrow around noon to pick up the merch which has been stored behind 3/7* A very modestly attended trivia got underway at Trees Lounge this evening following the World Cup coverage; placed all gear used back in storage Ordering/Receiving (posters & trailers): Angry Birds 3 ,  Her Private Hell , and  Spa Weekend posters were delivered and stored behind 3/7 this afternoon Ordering/Receiving (content): State Your Name audio is still being analyzed in booth 1 and should ...

NPP Projection Open 7/7

To do this evening/ was completed: What I thought was going to be an already busy day got even busier with the little wrench of the Zoom Q+A setup, which I blessedly sorted out so we should be set.  Presentation Issues: When I was starting to schedule automation, I noticed that Theater 3 wasn't accepting anything. I rebooted the server and it was back to normal.  Preshow Clips/Playlist: Made some new slides for the LWAM event at NWB tonight.  Built the start of the Maddie's Secret playlist. Volume and credit cues still needed.  Trailer Updates: No issues Special Events/ AV set up: Tried setting up the Zoom setup for the Q+A for tonight. It took John and I a little bit of finagling, but we did manage to get it working through the Mac Mini in 1. We tested it with the director in between rounds and we should be set. Just be sure the sound settings are on:  Audio Input: HD Camera Audio Output: HDMI Trivia is set up for tonight.  Ordering/Receiving (posters ...

NPP Projection Close 7/6

To do this evening/ was completed: I took down the brunch letters to make way for the marquee rental but wasn't able to start with the rental letters as the rain picked back up, so that will have to go up tomorrow morning. All the President's Men went smoothly until the last reel. Halfway through the reel, the lamp went out. I called MOD and stopped the show, put house lights up, MOD made an announcement about the lamp. I couldn't unlock the lamphouse door to investigate, and simply turning the breaker on and off did nothing, so I just transferred the reel to the other projector and picked back up where we left off. The crowd lost about a minute of image overall. This happened just a few minutes before the credits start in the film. Afterward, I was able to unlock the door and I nudged the cable, which seemed to do the trick once I turned the breaker back on: I was able to strike the lamp successfully. Apparently someone sprinted out of the theater when the lamp went out an...

Projection Admin 7/6

To do this evening/ was completed: John will be snagging the drive with the prores of State Your Name from the filmmaker tomorrow, so we can start DCPing it in the afternoon. This will be the last playlist we need to make for 7/10. Put the World Cup on in trees.  Presentation Issues: Preshow Clips/Playlist: The playlist for All the President's Men has been checked, so has Rozz Williams for tomorrow.  Trailer Updates: Special Events/ AV set up: We have a marquee rental for tomorrow, starting noon until late. This is for a friend of Matthew's. Projection has been cc'd in the email. Everything was pretty soaked today, but the weather is looking a lot better tomorrow, so it should be easier to put up in the morning.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Sent us the keys again for Booster and ingested them to the LMS, so we're all updated for tomorrow. We received a screener for The Wrong Girls, which I ingested to the LMS.  Outgoing...

NPP Projection Open 7/5

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Scheduled playlists for The Invite and Minions & Monsters  for tomorrow morning's staff screenings Trailer Updates: Special Events/ AV set up: Edge of Tomorrow and  Jaws played again this afternoon; deleted both CPLs after the shows ended World Cup coverage does not begin until 4PM today so the cable box has been left on FOX5 until the games start Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: No tickets were sold to the first round show in theater 6 ( Jackass: Best and Last ); shut this down a couple minutes into the feature after MODs radioed

Projection Close 7/4

To do this evening/ was completed: Quiet night on my end, but monitored volume in Theatre 1.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: T4 lamp has just about reached its full life expectancy. I can change it out on Monday.  Cue sheets updated/checked (every shift): Yes.  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/4 Open

To do this evening/ was completed: With the AC out in T1 and the big fans going, I raised the volume for all features in there. Ended up playing Jaws at 7.0 and Toy Story at 5.8 Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Swept and mopped the floor in 4/6 and tidied the desk a bit. All three ADA drills were in 4/6 not charging, please bring them back to where they came from after you remove a seat. There should be one in 4/6, one outside the MOD office, and one in 3/7. I put them all back. Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 6/3

To do this evening/ was completed: Presentation Issues: Heatwave woes and failing A/C units continue to challenge and punish us in theaters 1 and 3 this evening (but hopefully not for the whole weekend); I kept in contact with management as needed but there was little to be done on my end as the fix was in progress and guests were made aware Preshow Clips/Playlist: Lowered the volume for the bonus footage at the end of Backrooms  since it sounded very loud at the feature volume setting (I doubt this was mixed the same but the drop from 5.0 to 4.0 feels better since enough of the crowd seems to be leaving during the credits) Trailer Updates: Special Events/ AV set up: World Cup coverage continued at Trees Lounge throughout the evening Ordering/Receiving (posters & trailers): Posters and lobby cards for the Rozz Williams event on 7/7 were delivered and stored behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/c...

NPP Projection Report 7/3 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Outgoing/Shipping (content): Print/video Inspection: Took a look at Jaws and Edge of Tomorrow . Playlists updated. Also looked at the new Backrooms version with Gil and we decided to leave lights up throughout the bonus content. Asset tracking doc updated/checked?: Maintenance/cleaning: I put instructions for moving projection equipment off the main network to the manual, in the event that we have a network problem and it goes down. Check it out here . Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 6/2

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: All the President's Men screening went well. All reels are heads out beneath the rewind bench for the show on 7/6. Cleaned both projectors and shut the exhausts after the show Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues and initialed for confirmation Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/2

To do this evening/ was completed: WiFi is back up and running just fine. Presentation Issues: Was having a bit of trouble with the lights in T2, but I reset the dimmer panel and rebooted just about everything else, check in on the ethernet cables. All good. - L -Noting that I had to reset the dimmers in 1, 4, and 6 as well -A Preshow Clips/Playlist: Evil Dead Burn playlists built (still need to be tech'd) for 7/10, built the playlist for Save The Last Dance. - L Trailer Updates: I noticed when checking theaters before doors that the encrypted "WK24" Odyssey trailer says to see it "In 5 Weeks." Theres a WK27 version (unencrypted) which is the exact same trailer only it says see it "In 2 Weeks" so I swapped that into the 7/3 playlists. There will probably be a WK28 version for net Friday. Special Events/ AV set up: All the President's Men playlist set.  Reached out to Joe/WB and John about the DCP for State Your Name since it showed at their locatio...

NPP Projection Report 7/1 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled the Rozz Williams playlist, and Moana for the early Thursday shows. Kat sent the trailer lists for 7/10, I built all first run playlists. All new content is ingested. Still waiting on the intro slide for Save the Last Dance , we can build that once it comes in. Trailer Updates: Special Events/ AV set up: Set up a mic in T3 and ran through the playlist for tonight. All set. Ordering/Receiving (posters & trailers): We got a Odyssey poster advertising the 35mm print, I put it in one of the empty sections of the caddy so it's separate. We should put this up when we open the film. Ordering/Receiving (content): Ingested Moana to the LMS Outgoing/Shipping (content): Printed labels and scheduled a pickup for Law of Desire . Going out tomorrow. Print/video Inspection: Teched Rozz Williams ( Romeo's Distress ) Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets upda...