NPP Projection Close 7/10
To do this evening/ was completed:
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers): Maddie's Secret and Wild Inside one sheets were delivered and stored behind 3/7
Ordering/Receiving (content): Continued converting NoBudge 51 shorts to DCP (saved Subject of Desire and Noumena to the Shared drive)
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers): Maddie's Secret and Wild Inside one sheets were delivered and stored behind 3/7
Ordering/Receiving (content): Continued converting NoBudge 51 shorts to DCP (saved Subject of Desire and Noumena to the Shared drive)
She's the Man feature content was delivered via Deluxe this evening. Should be on the FilmVault portal in the next few days
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Cleaned both 35mm projectors in theater 4
Cue sheets updated/checked (every shift): Double checked all cues for tomorrow; removed an SPL from theater 5 since it overlapped with the end of the prior show...third round will need to be played manually
Marquee updated?: Added letters for Maddie's Secret and Evil Dead Burn to the front
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: A closed captioning device was returned to the A/V closet following the first round in theater 2; brought down another closed captioning device for the second round in theater 7 and returned it after the show
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Cleaned both 35mm projectors in theater 4
Around 10:45PM, Jared radioed about a leak coming through the server station ceiling in theater 1, and asked me to check on the booth A/C. I went down and noticed a small puddle that was being blocked by the two bulb boxes against the wall beneath it (these boxes are a bit soft from absorbing the water that was dripping down). I moved these and grabbed some bar rags to soak up the water that had settled on the tile floor, and placed them beneath the source of the leak to keep it from dripping further. Jared brought extra rags up. Matthew was in communication with Jared and asked that the unit be turned off for the time being. The drip ceased once the unit was shut down. I left the rags lined against the wall to keep any additional water from pooling up again. I checked the units in 2, 3, and 4/6 before leaving and all are leak free.
Cue sheets updated/checked (every shift): Double checked all cues for tomorrow; removed an SPL from theater 5 since it overlapped with the end of the prior show...third round will need to be played manually
Marquee updated?: Added letters for Maddie's Secret and Evil Dead Burn to the front
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: A closed captioning device was returned to the A/V closet following the first round in theater 2; brought down another closed captioning device for the second round in theater 7 and returned it after the show
Comments
Post a Comment