To do this evening/ was completed: Staff Screenings for The Odyssey have been scheduled on the LMS, blocked on the calendar and sent out on 7shifts. I will be running a test of this tomorrow morning, Alec will be running the shows in the evening. FYI - if you didn't already know, no one but projection is allowed to witness the test tomorrow. - L

Presentation Issues:

Preshow Clips/Playlist: Staff Screening playlists built. 

Trailer Updates:

Special Events/ AV set up: Picked up the DCP of Christine from the MOD office. Transferred it to the Share folder and started ingesting it. - L

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Gave John a lil nudge to check in on the DCP delivery for Source Code since no info is available still. - L

Received and ingested the DCP of Looper and It Ends, transferred the screener of It Ends to T3 for the programmers. - L

Currently downloading the DCP of Wild Inside, which we received today via link. This is downloading to the Share folder via the Signiant App. Please ingest once it's done. - L

Ingested a lot and I mean a lot of keys. - L

Ingested the V2's of new Droppings/Book PSAs, which I will take a look at tomorrow morning. - L

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Kind of a big maintenance day for us. Alec and I got the print up on the platter, which is all ready to go. Alec has reached out to Roger for another power source and swapped the existing ones in T1. I changed the fuse for the voltage meter in both projectors (which turned out to be necessary on P2, actually) and adjusted the amperage on P1 since it was running pretty high. Had the lamp on for two hours this morning and it ran perfectly fine, even after the power source switch, but we're hoping to err on the side of caution with a new one if we can get it. We should be sorted for tonight, but please do let us know if anything funky happens. Ran loops for this evening's screening of Jurassic Park 3. All set. - Lillian

Cue sheets updated/checked (every shift): Yes. 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: