NPP Projection 10/7 Close



To do this evening/ was completed: Inspected the last three reels of New Nightmare. They're in good condition overall, relatively minimal base scratching. Inspection sheet has been updated. Made a new DCP for Going Away, transferred to the DCP Drive. Locally ingested Wallace and Gromit to T1 which delayed me from ingesting Paperboy until the end of the night, ingest in progress. Ingested Cosboi and Going Away to T2, Ahu's Journal to T3.

Was unable to save and transfer Monsieur xmf file as I'm not able to access Dropbox, or at least couldn't find login info.

Tried to organize the table to the right of the 4/6 desktop. There's a lot of stuff that could either be returned to owners (blu-rays) or placed in one of our spare bins, "misc" perhaps. Likewise the top of the metal drawer next to the rewind bench. Maybe we could get a cabinet to place all of the cleaning and maintenance equipment in, house it to the left of the rewind bench.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?: Yes, Wallace and Gromit info provided.

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: 

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 9/8 Lillian/Will

Projection Close 8/26 Lillian

NPP Projection Report 11/23 Open