NPP Projection Report 2/8 Open, Alec

To do this evening/ was completed:

There are three manual starts tonight.

Check cue sheets for tomorrow and print out a copy for the opener.

Spirit Awards in Hi-res (which should be fairly hands-off).

Add titles that are "pending" on Deluxe to the asset tracking doc.

Presentation Issues: None today.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Independent Spirit Awards will be on in Hi-res. We're starting it with no sound and closed captions on. If there are enough requests for the sound we'll turn it on. Set this up with Chris on my way out.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):  Drive for Ace in the Hole checked, ready to ingest tomorrow.

Ingested keys for Ace in the Hole, they open at 8am tomorrow.

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Put all of our trailer reels onto cores to keep our house cast aluminum reels free. They are labeled in a box in the cabinet beneath the workbench in 4/6 along with several of our house reels and a few split reels. For threading practice you can grab one and put it on a house reel, just be sure to wind it back on a core and re-label it (if necessary) when you're done. I also put two of our reels of War of the Worlds on cores. The other one of them plus the two reels we have of Mulan are on plastic shipping reels so these are convenient for quick threading practice. These are in a box on the shelf across from the workbench in booth 1.

-Started labelling some of our film supplies as ours.

-Cleaned up workbenches in 1 and 4/6. Both booths have a designated box for projector cleaning supplies (bags of Q-tips, bottles of isopropyl alcohol, toothbrushes, etc) that have been opened. Both of the good splicers were in 4/6 so I brought one down to 1, let's keep one to a booth from now on.

-We're generally doing well on supplies but we could use some more black sharpies and some rolls of splicing tape.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?:

Projection cart by TH5?:

Nest:

Additional Notes: The clocks on the IMSes were probably about 30 seconds behind, with this error on the webpage: "NTP synchronization failed: An error has occurred during NTP synchronization. It might result in an incorrect time of the player. Set up a reachable NTP server in the: NTP Server configuration" I reset the time in Administration -> Control Panel -> Time Settings (for some reason I had to close out of the IMS webpage then reopen the time settings for the change to actually take). What is the NTP synchronization, though?

Comments

Popular posts from this blog

NPP Projection Report 11/23 Open

Projection Admin 9/18

Projection Admin 9/2