NPP Projection Report 9/28


To do this evening/ was completed: Second round Nowhere Inn in Theater 4 and third round Blue Bayou in Theater 7 are manual starts.

Presentation Issues:

Preshow Clips/Playlist: Built a new Teen trailer pack for 10/7, I'll make new first run playlists with this pack on Thursday when some of our current show playlists can be deleted to avoid having too many duplicates. NewAllAges trailer pack for 10/1 Addams Family 2 first run added to feature playlist.  

Scheduled everything from 10/1-10/6.

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Venom 2 drive came in, it's been ingested and the show playlist has been made.

The issues with the Titane DCP have been solved, the workaround Max came up with was to ingest from Eclair directly to theater 4's server, and then to send it from there to all the other houses. The result is that we have Titane loaded on every server, since it's not on the TMS. Don't delete it from any server until it closes just in case we need it in a different theater. Playlist made and scheduled.

Checked tracking for the Bottle Rocket drive, it should be here tomorrow.

Placed an order for Possessor through Eclair which has been accepted, the DCP should be available on the server shortly but we can hold off on ingesting it until some features can be deleted from the TMS.

Received tracking for the Texas Chainsaw Massacre print, it should be arriving tomorrow.

Outgoing/Shipping (content): There are a few drives on the shelf which can be handed off to UPS next time they come.

Print/video Inspection: Checked the Josie & the Pussycats DVD for the private event on 10/12. Subtitles work, and it looks/sounds fine in the theater. Run time and credit time added to the asset tracking doc.

Asset tracking doc updated/checked?: Yes, tracking and tech info added.

Maintenance/cleaning: During changeover practice with William in theater 1 we discovered the take-up belt on projector #2 is a bit too loose and can sometimes slide out of place leaving the take-up disconnected from the motor. I can easily fix it by shortening the belt slightly, just making note of it.

Cue sheets updated/checked (every shift): Yes, updated for Venom and Titane on 9/30.

Built cue sheets for Friday 10/1-Thursday 10/7. Missing end timing for 10/7, which will be filled in when this date is scheduled. Otherwise, only special events are incomplete and will be filled in as content arrives.

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?: Yes

Projection cart by TH5?:

Nest:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24