NPP Projection Admin 6/29 Jack and Lillian



To do this evening/ was completed: Added all cues to T6 Quick Controls. Not sure how long we're keeping the Show Vault, but they're there.

Built and tech'd private Now and Then playlist--we'll need to run the Spotify playlist they sent off the Nonsync output--cable has been connected to the booth monitor, just hit play. Update: we're using the 1/8" to xlr (mic input) for this since the 1/8" to x2 rca male did not work. Keep volume at 5.0 (on the processor) for this and do not raise it on the monitor/spotify! - Lillian 

Scheduled an express pickup for Alien from LA for tomorrow 6/30 10:30-6. Bring the print down at the end of the night. (Tracking is correct. I scheduled the email Cristina sent a few weeks ago to get forwarded to us this morning.) - Lillian

Presentation Issues:

Preshow Clips/Playlist: Made the DCP for the ET slide.- Lillian 

Trailer Updates:

Special Events/ AV set up: See notes about the Now & Then show above. They replaced preshow with a slideshow that will play twice (30 min in total). Please play the spotify playlist with this. Look at the Event Memo!- Lillian 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Received a physical drive for The Fog--locally ingested to T2.

Had issues with the file sizing for the DCP of Blue Sunshine that Alec downloaded yesterday. We're slowly downloading each piece on the 4/6 comp now.  -  Lillian 

Reached out about the Wolf of Wall Street KDM for 7/5. - Lillian 

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Started cleaning the lamp house in T4 projector 1. Got the lamp model after having to carefully loosen it (numbers weren't visible until a good turn). I believe this is different to the boxes I found in the projectors a couple months back (the ones from like 2004). We'll make sure we've got some of these on hand since the lamps we have now have visibly aged. - Lillian

My key got stuck in the 4/6 door and ripped clean off as if it were a stick of butter. I reseated the door handle and got the key bit out of it. Working fine now. We had a spare key anyway, so I'm using that. 

Cue sheets updated/checked (every shift): Went over the cue sheets with Paul today, referencing Matthew's last email about the new film schedule. Jaws and Nashville keys open up tomorrow so I'll tech then. Everything looks good right now just waiting on a bit more info.

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24