NPP Projection Report 3/2 Open


To do this evening/ was completed: Spaceman poster/letters still need to come down. It's raining all night so please do this tomorrow morning.

Reminder that West Side Story has an intro tomorrow!

Presentation Issues:

Preshow Clips/Playlist: I lowered the volume of Dune 2 to 4.5 in all the playlists. The feature is really loud and is stressing the system in multiple theaters, I noticed the amps overloading the APC during the staff screening in Theater 3 yesterday at the loudest moments. The managers noted some "crackling" in Theater 1 last night while this was playing, which is probably still a subwoofer issue but lowering the volume should have this sounding good for now. I was in and out of T1 as it was playing.

Trailer Updates:

Special Events/ AV set up: NSF program today went great, all the shorts played well. Recorded the Q&A and uploaded it to the Google Drive folder.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: I fixed the keyboard tray for the T1 booth rack.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 3/30

Projection Admin 10/2

Projection Admin 9/18