NPP Projection Close 7/30
To do this evening/ was completed:
Presentation Issues: Got a call from MOD roughly twenty minutes into the first round in theater 2 that the stage lights were on so I rushed upstairs to turn them off...going to assume the construction crew had turned these on earlier and never bothered shutting them off...all that is to say we should be extra vigilant about double checking this auditorium after they have gone for the night since this is the second day in a row with an avoidable presentation issue
Preshow Clips/Playlist: Blade Runner show playlist (including the intro slide) was built
Trailer Updates:
Special Events/ AV set up: The Manitou screening in theater 4 went very smoothly + played the Beyond the Door trailer after Cristina's introduction of the feature
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Uploaded keys for Harold and the Purple Crayon and Trap in addition to updated keys for Inside Out 2 and Maxxxine
Presentation Issues: Got a call from MOD roughly twenty minutes into the first round in theater 2 that the stage lights were on so I rushed upstairs to turn them off...going to assume the construction crew had turned these on earlier and never bothered shutting them off...all that is to say we should be extra vigilant about double checking this auditorium after they have gone for the night since this is the second day in a row with an avoidable presentation issue
Preshow Clips/Playlist: Blade Runner show playlist (including the intro slide) was built
Trailer Updates:
Special Events/ AV set up: The Manitou screening in theater 4 went very smoothly + played the Beyond the Door trailer after Cristina's introduction of the feature
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Uploaded keys for Harold and the Purple Crayon and Trap in addition to updated keys for Inside Out 2 and Maxxxine
Blade Runner feature content was made available this evening and ingested to the TMS
Outgoing/Shipping (content):
Print/video Inspection: Re-inspected The Manitou and packaged it for return shipping + rewound the Beyond the Door trailer back on its core
Outgoing/Shipping (content):
Print/video Inspection: Re-inspected The Manitou and packaged it for return shipping + rewound the Beyond the Door trailer back on its core
Cleaned the projectors after the show and shut the exhaust ports + put the 1.85 lenses and plates back in the cabinet in 4/6 (these may need to be swapped back out for Angel which screens in theater 4 on 8/13)
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked, cross referenced the schedule, and initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked, cross referenced the schedule, and initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes:
Comments
Post a Comment