NPP Projection 9/21 Open


To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Condo Painting screening/Q&A went well. Recorded the Q&A and uploaded it to Google Drive. Cleaned both projectors after the screening.

1.85 lenses and plates are in place for Normal Life tomorrow but you'll need to run loops before the show.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Ripped the Borrower blu-ray, it's converting to DCP on the T1 iMac, going onto the Almodovar drive.

Downloaded all my assigned NewFest shorts for which DCPs are available and ingested them to Theater 1.

Outgoing/Shipping (content): Reinspected and packed up Condo Painting. We can arrange the pickup with DHL during the week.

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian