NPP Projection Close 11/15

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist: Ingested The Boy and the Heron to theater 7 from the DCPIII drive, built and scheduled its show playlist, and checked credits on the DVD for a house lights up cue (still worth double checking this for picture quality and any necessary volume adjustment)

Built all first run trailer packs and Gladiator II show playlists for the week of 11/22

Trailer Updates:

Special Events/ AV set up: Tech'd The Conversation in theater 2 between rounds this evening and increased its volume (there was a house lights up cue built into the playlist -- lights will come up over the final shot as credits roll)

Switched lenses and plates in booth 1 to scope for Any Given Sunday + ran a loop on projector 1 and got focus (taped around the port glass where it was needed and filed some of its plate down) and ran reel 1 to get focus and volume (took some photos/videos and sent them to Desmond -- the print looks and sounds fantastic)

Tech'd La Strada in theater 1 after the final round, increased the feature volume, and added a lights up cue to the very brief (18 seconds) of credits at the end of the film

Ordering/Receiving (posters & trailers): Received a bunch of character posters for A Complete Unknown and one sheets for Drop + organized these and took the liberty of consolidating the stock of trivia posters (tossed a handful of older titles away and cut down on the number of Red One posters since we were sent something like a dozen of them)

Ordering/Receiving (content): Ingested additional trailers for 11/22 first run SPLs (Babygirl, Lord of the Rings, Nosferatu, and Mufasa) and double checked to make sure all other trailer content was on the TMS

Downloaded and ingested pre-show content for the private The Boy and the Heron event on 11/17 and all forecast and pre-show content for Gladiator II and Wicked show playlists for the week of 11/22

Gladiator II feature content was made available this evening via Deluxe and all versions were downloaded to the TMS

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?:

Additional Notes: Returned a couple listening devices from theater 7 to the A/V closet on the third floor

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open