NPP Projection Close 10/20 + Admin 10/21



To do this evening/ was completed: Finished inspecting Dr Moreau, good condition, on house reels 4/6.

Ingested the Imagination Land slide and ran the new DCP for the filmmakers, they're happy.

Ingested Blue Moon and Shelby Oaks--Shelby came with two separate DCPs, one flat, one scope. Apparently there are ratio changes in the film so they provided two versions to accommodate theaters who don't alternate between ratios. Assuming we'll go flat so that's the one I built the playlists with.

Set up the mic and image connections in T1 for tonight's Warriors show--all is working. Muted sound on the Yamaha mixer so just turn that volume back up when the time comes.

Aux cord is set up in Trees for the DJ set before the Deuce. Jeff just goes off his laptop and it should be fairly simple. The mixer under the bench is already flipped on. 

Scheduled the coming week in LMS with a few exceptions--Depeche Mode needs a playlist made.

Tech'd all of the Halloween dragshow pieces--I logged volumes in my notes and will build a playlist tomorrow. Tested all spotlight cues, all set.

Presentation Issues: **Came in this morning to see T1 Christie IMB connection was down, power-cycled the projector and got the connection back up, then tested some content, all good. But just a note: in Screenwriter the T1 icon is still red with a "Christie Unavailable" status. It's functioning properly and you can access T1 controls through LMS, so don't be alarmed.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Took a look at a reel of Casper and Scooby Doo and noted the volume for each. Both are rewound and set for their shows. 

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Cue sheets for next week are filled out with the exception of Depeche Mode and Night of the Living Dead. 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

NPP Projection Admin (Lillian/Will) 7/7

Projection Admin 9/8 Lillian/Will