NPP Projection Close 11/18

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Legends of the Fall intro and screening went very well (I did not have a moment to double check its pre-show as I was busy setting up for trivia so I missed seeing the Dark Angel trailer was absent from it...I played this manually after Cristina and her guest made their remarks)

Cleaned both projectors following the show and ran the RP-40 loop for Bugonia tomorrow morning/refocused the lens/taped the port glass/set the top roller back in place...closed both exhaust ports and put the mic is back in the booth in its charging port

Had a hell of a time getting trivia ready since people were there as early as 2PM in order to get seats and by the time I started to set the table and wiring and everything else up the room was nearly full. Today would have benefited from an even earlier set up if I am being completely honest but I digress. Alec had set up XLRs beneath the circuit breaker for the guest hosts to record audio through, however, I needed to bring down extra cables to run along the wall of the room since their Zoom device was low on battery and would only work the whole show being plugged into the outlet beside the hosts' seats. Gus was very gracious in helping me clear the path for these and taping the cables down to keep anyone from tripping over them. Prior to this I had brought down a mixer and three mics (one of the Blank Check producers said the usual one mic would suffice but I knew this was never going to be the case) for posterity's sake and tested them/balanced the gain and volume levels. Everything went well despite the maximum capacity Trees was at and all the gear used was returned to its proper storage space

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Placed Legends of the Fall back on its shipping reels after the show and left the canisters in booth 1 by the workbench

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:Yes

Projection cart by entrance?: Yes

Additional Notes: