NPP Projection Close 11/4

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Brought a mic stand down from theater 1 to theater 3 as requested in the event memo for the Shock-a-Go-Go shorts intro (the spotlight remote is back behind 3/7 and the stand is beneath the curtain in theater 1)

Set up for trivia at Trees Lounge...broke everything down following the 35mm show in theater 4

The Color Purple screening + intro in theater 4 went smoothly save for a bad changeover between reels 4 and 5 (reel 4 was mislabeled on the inspection form as having a set of scribe cues when both were grease...I missed the motor cue by a moment longer than was needed to have everything in sync and the crowd saw some leader from the subsequent reel during the changeover ). A similar error occurred between reels 5 and 6 from the splicing of the leader on the latter reel throwing the framing off but this was also quickly fixed

The first round 35mm screening of Bugonia ended around 6PM. I cleaned the projector, platter, the brain, and all rollers thoroughly. The print is covered and everything has been powered down for the time being. There was a moment of confusion regarding the bulb in projector 1 which stayed on despite the lamp switch being in the downward/off position. I tried flipping the breakers on and off but this would not kill the light. Alec made mention of a separate switch at the top of the lamp house which was in the "manual" position and not the "auto" one (image below shows this in its proper position, please keep it off manual and on auto) where it needs to be to allow the other switch to function normally. I switched this back to auto and got everything turned off as usual


Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): How to Train Your Dragon (2010 version) DCP was delivered and brought to 4/6. I transferred this to theater 2 from the CRU port in the 4/6 rack

Outgoing/Shipping (content):

Print/video Inspection: The Color Purple is tails out in 4/6 and can be placed back on its shipping reels tomorrow

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Double checked and adjusted tomorrow's cues. Everything is in order and accurate on the LMS

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

NPP Projection Admin (Lillian/Will) 7/7

Projection Admin 9/8 Lillian/Will