NPP Projection Close 3/26

To do this evening/ was completed:

Presentation Issues: At the start of the feature during the second round in theater 1 (Project Hail Mary at 5:45PM) the masking began covering the screen instead of opening to its 2:1 setting. MODs called and I manually triggered the 2:1 cue, fortunately only a minute or so had passed, and the curtains moved to the correct position. I double checked the playlists and there were no missing or incorrect cues. It looked like the curtains had moved in over the image too, not even staying at 1.85 like during the pre show, but had changed to a narrower setting. This film plays in theater 2 next so I will keep an eye on it then to see if its masking is affected as well and update accordingly (update: no issue with the masking in theater 2)

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Ran loops in 1 for the Swordfish screening this evening + brought a chair and mic stand down and checked the spots in 7 for the private event

Swordfish info and screening went smoothly save for a momentary blip between reels 2 and 3 (I missed the motor cue) but the rest of the changeovers were perfect. Mics were brought back up to the booth to charge following the show

Truly had no idea what was going on in theater 7 tonight. Only the filmmaker and his partner/friend(??) showed up to watch the feature. The pre-show was cut short by 30 minutes and the intro and Q&A were skipped for obvious reasons. Raekwon kept me updated with the goings on while I was up in booth 1. The filmmaker asked to watch the last ten minutes of the film again and I obliged them. I thought there might have been a proposal in the works. Instead this was a very expensive friend zone experience. They were out by 11:40PM and I put the mic, stand, and chair back in their appropriate storage spaces after the show

Ordering/Receiving (posters & trailers): A single Hokum poster was delivered and stored behind 3/7

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Left Swordfish tails out in booth 1. Cleaned both projects/closed their exhausts

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?:

Additional Notes: A seat was removed in theater 5 during the second round and placed back after the show

Comments

Popular posts from this blog

NPP Projection Admin (Lillian/Will) 7/7

Projection Admin 9/8 Lillian/Will

NPP Projection Admin 7/6