NPP Projection Close 3/5
To do this evening/ was completed:
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Crazy, Stupid, Love private event in theater 6 went smoothly (mixer and mics were put back in their storage spaces after the show)
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Crazy, Stupid, Love private event in theater 6 went smoothly (mixer and mics were put back in their storage spaces after the show)
Spoons Toons & Booze set up went very quickly and the hosts got underway shortly after I connected them to picture and sound (they will be back over the weekend so I have organized everything neatly and left it under/beside the screen) + mics are charging in booth 1
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content): Removed the Crazy, Stupid, Love feature content and host birthday video from the LMS and 6 after the event ended
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: The ceiling above the projector in theater 6 began leaking briefly during the private event. The leak was slow so I covered the projector with a garbage bag and sent an email about removing the damaged tile to assess the leak. I will check back in on it tomorrow morning and clean any excess water if it continues to drip overnight (update: ceiling has begun to leak again as of 12:02AM...rain outside is harder now so it must be coming down from the roof)
Cue sheets updated/checked (every shift): Double checked for tomorrow
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content): Removed the Crazy, Stupid, Love feature content and host birthday video from the LMS and 6 after the event ended
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: The ceiling above the projector in theater 6 began leaking briefly during the private event. The leak was slow so I covered the projector with a garbage bag and sent an email about removing the damaged tile to assess the leak. I will check back in on it tomorrow morning and clean any excess water if it continues to drip overnight (update: ceiling has begun to leak again as of 12:02AM...rain outside is harder now so it must be coming down from the roof)
Cue sheets updated/checked (every shift): Double checked for tomorrow
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment