NPP Projection Report 3/28 Open
To do this evening/ was completed:
Presentation Issues: T3 server went down during preshow for the second round Hoppers. I refreshed the IMS page and got the 404 error pretty much simultaneously with the call from MOD that the volume hadn't changed for the trailers. I killed the lamp right away, power cycled, then just started the movie once everything was back on. This delayed the movie 6 minutes in total, causing a manual start for the next round.
Preshow Clips/Playlist: Scheduled Super Mario and Drama shows. The Drama DCP is transferred to Theater 4 for the Monday viewing.
Trailer Updates:
Special Events/ AV set up: Pieces of April went well. No brightness issues with either projector. The print is rewound for tomorrow.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): The version of Dead Lover ingested last night was a VF with the closed captions only, the OV still needed to be ingested which I did this morning. All good now.
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Added some motor oil to P2 in 4.
Cue sheets updated/checked (every shift): Put the runtime into the Super Mario formula and added it's shows to the cue sheets for Weds and Thurs.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment