NPP Projection Close 4/6 + 4/7 Admin



To do this evening/ was completed: Evil 8, Real Life, Phantom Thread, Lost in Translation ingested.

Heavy Healing DCP downloading to Share drive.

Evil 8 playlists built, LMS scheduled for coming week, cue sheets built as well.

Wiped down Christie lenses in 1, 4 and 6. 3/7 swept. Trees trivia table set. 3/7 AC still down but so far no issues there.

Presentation Issues: RCA cable connected to 4/6 iPad wasn't working properly, preventing music from playing throughout the building. Switched the cable and resolved the issue. 

T7 table lights were out during round 1 today. Before checking the table lights switch I hit the dimmer panel box to reset it because I thought I saw one of the notification lights on. This brought up house lights for a quick moment, I brought them back down. Wasn't able to bring the table lights back on by turning the switch on and off.

I left my Eyes Wide Shut blu-ray here for McKegg to borrow just FYI.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Admin (Lillian/Will) 7/7

Projection Admin 9/8 Lillian/Will

NPP Projection Admin 7/6