NPP Projection Admin 6/9 Jack/Alec
To do this evening/ was completed: Ran loops for tonight, all set. Cleaned the projectors afterward.
New forecasts ingested, built 6/12 playlists and scheduled coming week in LMS. Alec built the cue sheets.
New 35mm letters up on marquee.
Disclosure Day playlists have the exclusive Odyssey Trailer 3 right before policy/feature.
Packed up Strangers on a Train and scheduled Express pickup for today. It's on the cart.
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Jack and I set up the turntables for the DJ set tonight.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Chenelle dropped off a DVD of Toy Story for the 6/16 private event. Since Willie D is still going on the T1 iMac I'll look at the DVD itself on screen in 3 tomorrow to assess the quality and let Chenelle know.
Outgoing/Shipping (content):
Print/video Inspection: Checked both DCPs for the two private events tomorrow morning, built playlists and scheduled them. All set.
Asset tracking doc updated/checked?:
Maintenance/cleaning: The 1.37 masking cue in T1 is working again, the wire to automate button 4 on the motor had snapped off so I just had to reattach it.
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Jack and I set up the turntables for the DJ set tonight.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Chenelle dropped off a DVD of Toy Story for the 6/16 private event. Since Willie D is still going on the T1 iMac I'll look at the DVD itself on screen in 3 tomorrow to assess the quality and let Chenelle know.
Outgoing/Shipping (content):
Print/video Inspection: Checked both DCPs for the two private events tomorrow morning, built playlists and scheduled them. All set.
Asset tracking doc updated/checked?:
Maintenance/cleaning: The 1.37 masking cue in T1 is working again, the wire to automate button 4 on the motor had snapped off so I just had to reattach it.
We have 3 complete CaptiView devices now. I found one off to the side in the storage closet and I was able to get the clamp off one of the broken ones and attach it to a spare. As for the two with broken bolts, I was able to get those broken pieces out of the Captiview devices, however the pieces that attach the clamps cannot be fixed.
Cue sheets updated/checked (every shift): First run is done for next week, all rep and special events still need to be filled in.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Cue sheets updated/checked (every shift): First run is done for next week, all rep and special events still need to be filled in.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment