NPP Projection Close 8/14
To do this evening/ was completed:
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Ran a loop before The Odyssey screenings in theater 4; both went well and the projector was cleaned/print was covered after the final show
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Alec brought over The Fan and Blind Fury prints from NWB this afternoon and we took them down to booth 1
Outgoing/Shipping (content):
Print/video Inspection: Finished inspecting Blind Fury and added stills to the shared drive (this has a trailer for a feature called The Gods Must Be Crazy II attached to reel 1 so I have asked Cristina if she'd like us to run this as part of the show)
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Ran a loop before The Odyssey screenings in theater 4; both went well and the projector was cleaned/print was covered after the final show
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Alec brought over The Fan and Blind Fury prints from NWB this afternoon and we took them down to booth 1
Outgoing/Shipping (content):
Print/video Inspection: Finished inspecting Blind Fury and added stills to the shared drive (this has a trailer for a feature called The Gods Must Be Crazy II attached to reel 1 so I have asked Cristina if she'd like us to run this as part of the show)
Moved all the past months' inspection reports to their appropriate folders on Google Drive
I placed what I thought were the 6 reels of First Strike on house reels but ended up finding five more in a box beside it that had gone overlooked; I spent the rest of the night inspecting these and updated the report accordingly
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Yes
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: A closed captions device was used during the second round in theater 2 and placed back in the A/V closet afterwards
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Yes
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: A closed captions device was used during the second round in theater 2 and placed back in the A/V closet afterwards
Comments
Post a Comment