NPP Projection Admin 4/13

To do this evening/ was completed:

Presentation Issues: There was some minor confusion with the God of Gamblers Returns soundtrack during its first reel. I began running the print with the processor set to Dolby SR, as noted on the inspection report, until Cristina reached out to mention it sounded like it was wavering. I switched to Dolby A, checked in on the auditorium, and left the rest of the reels running in this format since nothing sounded out of the ordinary to me and Cristina said it sounded normal too

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Tech'd the Hyenas show playlist in theater 4 before the first round and adjusted the 1.66 lens file to sharpen focus on the film's subtitles

Ran loops in booth 1 before the Sundays on Fire event 

God of Gamblers Returns intro and screening went smoothly despite the soundtrack issue (brought the mic back up to the booth to charge and cleaned both projectors after the show + shut the 35mm exhaust vents)

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Keys for Miracle Mile and The Wedding Banquet were delivered and uploaded to the LMS this morning

Outgoing/Shipping (content):

Print/video Inspection: Re-inspected God of Gamblers Returns after the show and packaged the print for return shipping + scheduled a pickup (tracking ID: 880514080452) for tomorrow morning

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?: 

Additional Notes: The bulb in T3 was left on overnight, despite the scheduled shutdown, so I turned it off this morning to allow it some time to cool before the first round started

The A/Cs in the 3/5/7 booths went down around 3PM. None of the switches had been tampered with. Wyatt tried rebooting them from the MOD office but this failed to restore power. A small floor fan was running in the crawl space above theater 7 and the doors to both booths were left propped open to circulate cool air

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Close 5/2