NPP Projection Admin 4/29
To do this evening/ was completed: LMS scheduled for the upcoming week, including Thunderbolts, playlists built, Comic V2 elements ingested.
Loops ran for the show tonight. Tech'd Good Night and Good Luck with Desmond, volume logged. Print now on house reels.
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Swapped out the lenses in Theater 4 to Flat and focused them
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Tried ingesting the Alice Junior DCP from the physical hard drive Desmond brought over, the ingest still failed unfortunately. My guess is this is an issue with their DCP as I'm sure we got the complete file they uploaded. I let Desmond know. -A
Outgoing/Shipping (content):
Print/video Inspection: Desmond took a look at Good Night and Good Luck and Postcards From the Edge
Asset tracking doc updated/checked?:
Maintenance/cleaning: I'm putting a new XLR connector in the Mic 2 input in Trees, so the cable won't be stuck in there anymore. It will take a few more days, I need to wait overnight for the wire glue to dry and will likely need to glue each wire one at a time so they're really secure. I put a sign by the wires saying not to touch. -A
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Swapped out the lenses in Theater 4 to Flat and focused them
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Tried ingesting the Alice Junior DCP from the physical hard drive Desmond brought over, the ingest still failed unfortunately. My guess is this is an issue with their DCP as I'm sure we got the complete file they uploaded. I let Desmond know. -A
Outgoing/Shipping (content):
Print/video Inspection: Desmond took a look at Good Night and Good Luck and Postcards From the Edge
Asset tracking doc updated/checked?:
Maintenance/cleaning: I'm putting a new XLR connector in the Mic 2 input in Trees, so the cable won't be stuck in there anymore. It will take a few more days, I need to wait overnight for the wire glue to dry and will likely need to glue each wire one at a time so they're really secure. I put a sign by the wires saying not to touch. -A
I adjusted the turret position of the flat collar on P2 in T1. The plate didn't need to be filed. I checked 1.66 and 1.85 lenses to make sure the adjustment wouldn't throw the alignment of those of, which it didn't -A
Cue sheets updated/checked (every shift): Next week's automation is set and added timing for some of the events coming up.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Cue sheets updated/checked (every shift): Next week's automation is set and added timing for some of the events coming up.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment