NPP Projection Close 4/14
To do this evening/ was completed: Save for the event in theater 2 this evening it was a slower night overall, with a handful of manual starts/negative flips requiring lights to be brought up and shows to be played remotely
Presentation Issues:
Preshow Clips/Playlist: Added a feature volume cue to the Miracle Mile show playlist but this still needs to be tech'd for a lights cue tomorrow morning
Trailer Updates:
Special Events/ AV set up: Sunset Boulevard pre-show Q&A and screening in theater 2 this evening went smoothly (mics were returned to the booth to charge and chairs were placed back in the hallway following the introduction)
Projection cart by entrance?: Yes
Additional Notes:
Presentation Issues:
Preshow Clips/Playlist: Added a feature volume cue to the Miracle Mile show playlist but this still needs to be tech'd for a lights cue tomorrow morning
Trailer Updates:
Special Events/ AV set up: Sunset Boulevard pre-show Q&A and screening in theater 2 this evening went smoothly (mics were returned to the booth to charge and chairs were placed back in the hallway following the introduction)
Fright Night played to a smaller crowd in theater 1 without any issues
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Downloaded and ingested "PS_SE_Nostalgia_Ultra_V2" content (25min and 15min, the 5min folder had file elements missing) to the LMS/theater 1 for the Babe pre-show on 4/19
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked all cues, cross referenced the schedule on Screenwriter, and adjusted accordingly
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Downloaded and ingested "PS_SE_Nostalgia_Ultra_V2" content (25min and 15min, the 5min folder had file elements missing) to the LMS/theater 1 for the Babe pre-show on 4/19
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked all cues, cross referenced the schedule on Screenwriter, and adjusted accordingly
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes:
Comments
Post a Comment