Projection Close 6/14



To do this evening/ was completed: Jared radioed me to let me know that part of the preshow sounded far, far too low, which turned out to be the How To Order drama (G). I brought it up to 4.2 from 3.5 and adjusted all the 6/13 - 6/19 playlists. I put the DCP  in dcpomatic to see if a level adjustment can work a treat for our usual 3.5 in the screening rooms. The V2 has been ingested and I'll check it out Monday/will update the 6/20 playlists and delete the old How To if it works. 

Presentation Issues: No other issues. 

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Attempting to download the Sydney and Kim short (in 4/6 now), yet again, since it was still struggling in T1. I reached out to see if the hosts can use any other transfer setup. We'll see. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): I ingested the PS107 film to screen 2 just to get eyes and ears on it before it screens soon. As expected, it's a weird mix and will need to stay between 4.0 ~ 4.5, I reckon. Reached out to the host to see if they'd like to do a quick tech check before the day. 

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes. 

Marquee updated?: Terribly slippery/wet marquee, lost a lot of grip. We might need to wait another day. See how the weather fairs in the morning. 

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection 6/17 Close