Projection Close 6/14
To do this evening/ was completed: Jared radioed me to let me know that part of the preshow sounded far, far too low, which turned out to be the How To Order drama (G). I brought it up to 4.2 from 3.5 and adjusted all the 6/13 - 6/19 playlists. I put the DCP in dcpomatic to see if a level adjustment can work a treat for our usual 3.5 in the screening rooms. The V2 has been ingested and I'll check it out Monday/will update the 6/20 playlists and delete the old How To if it works.
Presentation Issues: No other issues.
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Attempting to download the Sydney and Kim short (in 4/6 now), yet again, since it was still struggling in T1. I reached out to see if the hosts can use any other transfer setup. We'll see.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): I ingested the PS107 film to screen 2 just to get eyes and ears on it before it screens soon. As expected, it's a weird mix and will need to stay between 4.0 ~ 4.5, I reckon. Reached out to the host to see if they'd like to do a quick tech check before the day.
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Yes.
Marquee updated?: Terribly slippery/wet marquee, lost a lot of grip. We might need to wait another day. See how the weather fairs in the morning.
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment