Projection Admin 9/3



To do this evening/ was completed: Staff Screening info has been emailed out, scheduled on the LMS and blocked on the calendar. We've got additional staff screenings of Son of the White Mare per many requests. 

Had our cinema meeting today. We're in good shape for the week we're about to enter, but we're still waiting on the performance pieces for Thelma and Louise from Malice/Ramona, but Desmond informed me they should be uploaded by today, EOD. If not, let's check in tomorrow. 

We're just about ready for tech this Friday. 

Presentation Issues:

Preshow Clips/Playlist: 

Trailer Updates: Please replace the 9/05 R rated playlists with One Battle After Another Trailer 5 (making sure conjuring isn't in there!)

Special Events/ AV set up: Chenelle and I were to have a meeting with the TEAL folks today to hash out the last few bits of the private events this weekend, but it got pushed to tomorrow, so Alec will be on call for it. I sent him an email with my notes, some adjustments and some tech info regarding the event. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Ingested Demon Slayer DCPs. 
Love on the Run PS
Ingested Mimic DCP
Ingested Sierra short
Was able to download a prores of and DCP the short Night, which, after Sierra, was the only short we needed. I've ingested it. 

Outgoing/Shipping (content): Handed off the print of Babysitter's Club to DHL today. 

Confirmed pickup with Kari for Blonde Venus tomorrow. 

Brian has the prescreening report for Fantastic Planet and we'll make sure he's got the post screening report after the show tonight. We'll get this packaged up when we can. I've looped everyone into that email thread with him for this print. It goes back to the Academy. Please see the address in that thread. Thanks! 

Print/video Inspection:

Asset tracking doc updated/checked?: SOF print on its way - Longest Nite

Maintenance/cleaning: I moved the 1.66 lens to the flat holder, rather than the scope holder on T2, ran loops and adjusted the port glass tape for both. We should be all set for tonight! 

Academy paperwork for Cuckoo's Nest sorted. 

Cue sheets updated/checked (every shift): Yes. Added info for Fantastic Planet and put additional notes in for the shorts before the feature. No intro. 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 10/2

Projection Admin 9/18

Projection Admin 9/2