Sunday 3/8 CLOSE Chris



To do this evening/ was completed:
-Carried Out IMS deletions as scheduled save for deleting Brothers and Portrait from T7 as no tix were sold the the final round in that room and so I had powered down the server before going about deleting anything. Also means the 6:15 3/10 Wendy still needs to be removed from scheduler. Sorry bout that.

Presentation Issues:
-Hate to go back to this but I checked on T3 while PS was up and the clip from A New Leaf in the Generic Romance 40 was really quite loud. Sarah B who was serving in there was kind enough to ear check for me as I adjusted it, 3.3 turned out to be ideal. I know we've tried a number of things regarding preshow volumes but people needed to borderline shout in there to be heard.

Preshow Clips/Playlist:
-Meant to build a baby-friendly Emma for tuesday but couldn't get new SPLs to save. I'm having TMS reboot as I leave the building which I assume will fix this as usual.

Trailer Updates:N/A

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):
-Got rid of this weekend's brunch SPL.

Print/video Inspection:N/A

Asset tracking doc updated/checked?:
Nothing to add.

Maintenance/cleaning:
-Changed out dead overhead bulbs in T3+7.

Cue sheets updated/checked (every shift):
-Monday looks good.

Marquee updated?:
-Took down the world's longest Birthday message and replaced it with the almost comically brief NYCFC SHORTS on 15th.

Posters updated?:N/A

Cleaning lights on for the night?:Yes

Projectors off for the night?:Yes

Projection cart by TH5?:Yes

Nest:

Additional Notes:

Comments

  1. Should note that as I powered everything down the T1 VNC is showing a critical bulb change alert. Would very much like to see how this is done on our Christies.

    ReplyDelete

Post a Comment

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

NPP Projection Close 3/29