NPP Projection Close 7/31

To do this evening/ was completed: 4/6 whiteboard updated for August screenings. T2 booth swept and mopped, looked like there was a bit of residue up there from the work going on in that auditorium, so might be a good idea to keep a closer eye on the booth for the time being. *Also, there is a broken key lodged inside the door handle to the booth which makes it pretty difficult sometimes to open the door, requires a bit of finagling. Might be good to have it removed at some point.* Manitou letters down, Angel up. Looks like Pet Sematary is still here even though I scheduled a 7/31 pickup for it. Assuming it will go with Manitou tomorrow. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters update...

NPP Projection Report 7/31 Admin

To do this evening/ was completed: Remember to wake the Verizon cable box each day before opening so Olympics coverage can be screened in Trees. Sent the weekly update out. Presentation Issues: Preshow Clips/Playlist: Trap and Harold staff screening playlists built and scheduled. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): We got another poster for Transformers One . I set aside a Twisters poster for Williamsburg, I pulled it from the archive tube. Ordering/Receiving (content): Outgoing/Shipping (content): Printed return labels for The Manitou, attached them to the cans, and scheduled a pickup for tomorrow. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Compared the sound levels on the 35mm projectors in T4 again today, following some notes about uneven volume during the Fievel and Manitou screenings. Firstly, the optical subwoofer level (which applies to Dolby A and SR prints, which Manitou and Fie...

NPP Projection Close 7/30

To do this evening/ was completed: Presentation Issues: Got a call from MOD roughly twenty minutes into the first round in theater 2 that the stage lights were on so I rushed upstairs to turn them off...going to assume the construction crew had turned these on earlier and never bothered shutting them off...all that is to say we should be extra vigilant about double checking this auditorium after they have gone for the night since this is the second day in a row with an avoidable presentation issue Preshow Clips/Playlist: Blade Runner show playlist (including the intro slide) was built Trailer Updates: Special Events/ AV set up: The Manitou screening in theater 4 went very smoothly + played the Beyond the Door trailer after Cristina's introduction of the feature   Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Uploaded keys for Harold and the Purple Crayon and  Trap in addition to updated keys for Inside Out 2  and Maxxxine Blade Runner  fe...

NPP Projection Admin 7/30

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist:   Galaxy Quest  and  Ghost Dog  playlists built. Trailer Updates: Special Events/ AV set up: Loops ran for  Manitou  tonight. Playlist double-checked, mic set. Spotlight remote beneath the screen Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Outgoing/Shipping (content): DHL picked up  Fievel Goes West. Print/video Inspection:  All About My Mother  print arrived, McKegg inspected. Re-inspected  Pet Sematary II  and scheduled Fedex Ground pickup (return labels were included in shipping cans). Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes, TMS scheduled for upcoming week. Cue sheets built. Marquee updated?:  Pet Sematary  letters down,  All About My Mother  up. Posters updated?: Cleaning lights on for the night?: Projection cart by entra...

NPP Projection Close 7/29

To do this evening/ was completed: Galaxy Quest and Ghost Dog features ingested to TMS. Pet Sematary II screening went smoothly. Print has been rewound and will be prepared for outgoing tomorrow. Started scheduling upcoming week in TMS. Presentation Issues: T2, round 1 Twisters: at the beginning of the feature MOD/runners notified me that the curtains had not opened up for the feature and that there was a ton of bleed. I hit the masking cues on the TMS and IMS pages to no result, so I went behind the curtain and saw that the masking motor was not on. I hit the power switch on the motor to no result and then attempted to see if a power cable was disconnected somewhere, which was very hard to do because there was a ton of insulation padding on top of all the cables and the equipment box. After a few minutes I gave up (upon inhaling some dust, which I'm not pleased about) and switched over to the 1.85 channel on the Christie and let the film play letterboxed. I was not able to further...

NPP Projection Admin 7/29

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Built and scheduled a private event playlist for Trap for the school trip screening on 8/2 + ingested a handful of new trailers for upcoming first run titles Trailer Updates: Special Events/ AV set up: Ran loops in theater 4 and cleaned the projectors for Pet Sematary II this evening (exhaust ports are closed for the time being) Ordering/Receiving (posters & trailers): We Live in Time posters were received and stored behind 3/7 Ordering/Receiving (content): Ghost Dog and updated Despicable Me 4  keys were delivered and uploaded to the TMS + continued corresponding with Evelyn from NBCUniversal about the Fievel Goes West print Outgoing/Shipping (content): Print/video Inspection: Tech'd new trailer packs for the week of 8/2 and got eyes on the Trap pre-show for the upcoming private event and preview screenings Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/che...

NPP Projection Close 7/28

To do this evening/ was completed: Outgoing brunch letters down, upcoming titles... up. Outgoing content removed from servers. New Deadpool volume sounding right for big crowds. Tidied 3/7 and 1. Spent some time with Christie manuals. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 7/28

To do this evening/ was completed: Presentation Issues: Had a bit of difficulty settling on the appropriate volume level for  Fievel Goes West  this afternoon; MODs radioed up and said guests mentioned it was too loud (the volume was raised to 8.0 from 6.7 -- which Jack played the film at yesterday -- as Desmond noted it sounded too soft at the lower volume) but it was also quite muted in other parts and, after going into the room to check a couple of times, ended up settling on 7.2 to try and split the difference as much as possible Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: Fievel Goes West intro + screening in theater 4 this afternoon went very smoothly despite the aforementioned sound troubleshooting (cleaned the projectors following the show and left the exhaust ports open) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Re-inspected  Fievel Goes West and prepared it for return shi...

NPP Projection Report 7/27 Close

To do this evening/ was completed: Ordered new light bulbs for the 4/6 desk lamp. Presentation Issues: Preshow Clips/Playlist: Upped the feature volume to 5.8 in every Deadpool playlist since its shows have been so busy. Ingested the Sci-Fi preshow clips for the Blade Runner playlist. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Tidied the side desk in 4/6 and wiped it down. Vacuumed the 4/6 floor extensively, including behind the wire shelf with the bins on it and around the TMS rack. Mopped the floor, too. Lillian, I moved your Pillow Book print over to the corner, on the floor beside the rewind bench. The damaged section of credits is on a core in a bubble mailer on top of the canisters. Put together the other new furniture dolly. Cue sheets updated/checked (every shift): Yep, tomorrow's cues ...

NPP Projection Open 7/27

To do this evening/ was completed: Fievel Goes West screening went smoothly, nice looking print. Rewound for tomorrow. A guest said the volume was a bit too loud at 7.0. I brought it down to 6.7 and went into the auditorium, sounded fine to me. I didn't update the playlist, so just fyi. Cleaned the projectors afterward. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 7/26

To do this evening/ was completed: Made the rounds throughout the evening and paid close attention to volume levels in theaters 1 and 2 as these had high capacity crowds Briefly corresponded with Kat about missing content on the trailer list for next week's scheduled programming which was adjusted accordingly Presentation Issues: Preshow Clips/Playlist: Built all first run show playlists for the week of 8/2 (including Harold and the Purple Crayon  and Trap ) and a pre-show for Magnolia on 8/7 Trailer Updates: Special Events/ AV set up: Olympics coverage was kept on at Trees throughout the afternoon and evening Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Downloaded and ingested "Trap_5min" pre-show content and an updated MUBI trailer Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Scheduled Trap  on the TMS on 8/1 and added its showtime i...

NPP Projection Report 7/26 Admin

To do this evening/ was completed: Working on setting up a live trial of Screenwriter, which will be our new TMS, soon. I'll keep everyone updated! Brick work is done in Theater 4 I believe, though the right surround speaker needs to be moved back to its permanent spot. I'll be taking care of that on Tuesday. Presentation Issues: Preshow Clips/Playlist: Ingesting all new preshow/trailer content for next week to the TMS. Trailer Updates: Special Events/ AV set up: 1.85 lenses and plates are in place in both T4 projectors but you'll want to run loops before the show in there tomorrow morning. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): CatVideoFest ingested to the TMS. Trap was delivered and is ingesting to the TMS Outgoing/Shipping (content): Trouble in Paradise picked up Print/video Inspection: Teched The Sting in Theater 2. All set for this weekend. Teched Pet Sematary II with Cristina, volume noted on the info card. Asset tracking doc up...

NPP Projection Close 7/25

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Olympics coverage was put on at Trees Lounge for the duration of the afternoon and evening Ordering/Receiving (posters & trailers): Heretic posters were delivered and stored behind 3/7 Ordering/Receiving (content): Harold and the Purple Crayon feature content was ingested + re-uploaded keys for  A Quiet Place: Day One since its KDMs were set to expire before the showtimes tomorrow Outgoing/Shipping (content): Trouble in Paradise print was brought downstairs to the side entrance for the DHL courier to pick up tomorrow Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked, cross referenced the TMS, and initialed for confirmation (second round in theater 3 was incorrectly scheduled and was adjusted accordingly) Marquee updated?: Posters updated?: Deadpool & Wolverine is ...

NPP Projection Admin 7/25

To do this evening/ was completed: Re-inspected Trouble in Paradise and packaged it up for outgoing. Reached out to Evelyn at DHL, a courier will come tomorrow between 10-4 pm. Removed finished content from servers. 3/7 booth swept and mopped. No need to take out 4/6 trash at this time. Posters for Killer's Game and Captain America arrived. *Juan asked to lay claim to a Deadpool poster. I checked the inventory and didn't see a spare.* Surely we have others? I'll keep looking but keep in mind his reservation. Keys for The Sting arrived. Uploaded. They go live tomorrow 7/26. Trouble in Paradise letters down, Magnolia up. Deadpool letters up as well. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee up...

NPP Projection Close 7/24

To do this evening/ was completed: Inspected the rest of The Blade and put it back on shipping reels. It's in good condition. Trouble in Paradise screening went very smoothly. Print is rewound and will be re-inspected tomorrow. No keys for The Sting yet so will reach out tomorrow. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/24 Admin

To do this evening/ was completed: We're waiting on keys for The Sting . Jack, if they're not in by the end of the night can you email John/Deluxe tomorrow? Presentation Issues: Preshow Clips/Playlist: Ingested the M Night Shyamalan preshow clip for the Trap playlist. Built the Fievel playlist for Sunday and The Manitou . Trailer Updates: Special Events/ AV set up: Put the Beyond the Door trailer on a house reel, ran it to check volume in T4. This'll play before The Manitou next week. Ordering/Receiving (posters & trailers): We got posters for Afr ai d Ordering/Receiving (content): The Blade print arrived (August Sundays on Fire title) Outgoing/Shipping (content): The Gate is going out tonight. Print/video Inspection: Inspected the first four reels of The Blade . It's in good condition, though the first can has a light vinegar scent. Some light warping, too. This should present very well though. This 105 minute movie is on 11 reels (which is actually not too su...

NPP Projection Close 7/23

To do this evening/ was completed: Presentation Issues: Lack of a trailer pack ahead of the babies Longlegs screening this afternoon caused the feature to begin and end approximately ten minutes ahead of schedule...not sure who built this SPL but the necessary adjustments have been made for the upcoming Twisters babies screening on 7/30 Plex app and Apple remote were on the fritz again this evening and the Apple TV+ box needed to be rebooted...starting to think the temperature on that shelf above the bar is having some adverse effects on the wiring and causing the connections to go a little haywire Preshow Clips/Playlist: Scheduled staff screenings for Deadpool & Wolverine  in theater 1 on Thursday and Friday and emailed the teams at NPP and NWB Babies friendly Twisters show playlist was built and scheduled on 7/30 including a trailer pack to avoid any future cue sheet/timing mishaps Trailer Updates: Special Events/ AV set up: DJ set up at Trees for the post-screening  Tek...

NPP Projection Admin 7/23

To do this evening/ was completed: TMS scheduled for upcoming week. Cue sheets finished as well. Mic set for T3 intro tonight. Tested spotlights as well. Sometimes the positioning of the remote won't allow you to turn on/off the lights, but don't be deterred, the remote just needs to be near the center of the auditorium. Manitou slide DCP'd and ingested. Magnolia, Fievel and Manitou prints tech'd, volumes logged. Manitou print soundtrack, at least reel one, is significantly crackly, but Cristina says it'll do. T1, 2, 4 and 6 Christie lenses cleaned. Desmond sent over his slides for August. All of them downloaded and ingested. ( Crooklyn, Summer of Sam intro and Q&A, Superstar, But I'm A Cheerleader intro and breakdown) Presentation Issues: Longlegs babies screening played with no trailer pack. I made the playlist and, like many Babies trailer packs previous, made one for this screening, but I guess not? The playlist in question also has the DCP show end pack...

NPP Projection Close 7/22

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The Gate screening in theater 1 this evening went smoothly + cleaned the projectors and sealed the exhaust ports Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Downloaded and ingested keys for Deadpool & Wolverine, Despicable Me 4 , Inside Out 2 , and Maxxxine Outgoing/Shipping (content): Print/video Inspection: Re-inspected  The Gate after the show and packaged it for return shipping, printed return labels, and brought the canisters downstairs Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked, cross referenced the TMS schedule, and initialed for confirmation Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/21 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Scheduled Deadpool & Wolverine shows for Thursday. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Put Pet Sematary II and The Manitou on house reels. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Swept and mopped in Booth 2. Put some more motor oil in P1 in T1, P2 had plenty still. Checked the T4 projectors too and they're fine as well. Cue sheets updated/checked (every shift): Yes Marquee updated?: Updated the brunch titles: Thief and UHF down, An American Tail: Fievel Goes West and The Sting up. Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Using Cyberduck to download the feature DCPs I decided to back up for future use to the Preshow & Trailers drive (I'm losing my unlimited Google Drive spac...

NPP Projection Admin 7/21

To do this evening/ was completed: Presentation Issues: Rebooted the Apple TV+ box at Trees to get Plex up and running again this morning Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Thief screening in theater 1 went well (cleaned the projectors and closed the exhaust ports + everything is set for The Gate tomorrow evening but a picture and sound check would be appreciated in advance) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Re-inspected Thief after the show and scheduled a pickup for tomorrow morning for the print to be circuited to the Plaza Theatre in Atlanta, GA Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: The poster storage behind 3/7 was reorganized and additional first run one sheets were added to t...

NPP Projection Report 7/20 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Forgot to close the changeover on the projector I started the Thief screening on, so the audience saw a bit of countdown and heard it, too. Other than that this was a good show. Rewound the print for tomorrow. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Remember, Thief is being circuited to another theater. The address is on the white board in 4/6. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: cleaned projectors before Thief . Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 7/19

To do this evening/ was completed: Made the rounds throughout the evening and looked at the weekly update to brush up on upcoming screenings and events Presentation Issues: Penultimate round in theater 2 was paused and delayed the start of the pre-show by about 5 minutes; MODs radioed up and the show was started manually Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting Magnolia (it is a massive 10 reels but is in excellent condition overall save for some pretty consistent base scratches throughout) and uploaded stills to the shared drive Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked cues and cross referenced the TMS + initialed for confirmation Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes A...

NPP Projection Admin 7/19

To do this evening/ was completed: 7/26 A1 playlists built. Outgoing content removed from servers. Magnolia and Pet Sematary II prints arrived. Pet Sematary inspected, photos uploaded to Drive, Conrad notified. Presentation Issues: Preshow Clips/Playlist: Tech'd UHF (playlist is set).  Tech'd Teknolust with Cristina, including the slide. Everything looks and sounds good. - L Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Received a poster of Good One . In 3/7. - L Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting The Manitou . Print is tails out on shipping reels ready to put onto house reels when the time comes. - L Asset tracking doc updated/checked?: Maintenance/cleaning: Cleaned the analog port glass and sill in 4, cleaned the port glass in 3/5/7. - L Cleaned the lenses in 4 and 1. - L Cue sheets updated/checked (every shift): Yes Marquee updated?: Adjusted the marquee - KOK dow...

NPP Projection Report 7/18 Close

To do this evening/ was completed: I didn't get a chance to update this on the marquee and take down the poster, but Kinds of Kindness is officially done. Presentation Issues: Preshow Clips/Playlist: Cristina let me know there was supposed to be a new version of the Shouting at the Screen preshow playing tonight. It's listed on the trailer list (V2) but hadn't been downloaded so it wasn't on any server. I've downloaded/ingested it and deleted the old version from T2 and the TMS. Trailer Updates: Special Events/ AV set up: Dj set up was smooth in Trees. Broke it down once Shouting at the Screen was underway. Ditto Shouting at the Screen. One of the hosts' mics was sounding compressed/garbled during the intro, I checked the mixer and unpressed the HPF 60Hz button for his mic. Be aware of this button, it shouldn't ever be pressed. Was checking on the screening periodically and things mostly sounded fine, though there was some light feedback from the mics at po...

Projection Admin 7/18 Lillian

To do this evening/ was completed: Ariel, one of our IT people, came in to do some work on the WiFi. He was real jazzed about the fact that we still run analog film. Presentation Issues: Preshow Clips/Playlist: Tech'd Twisters . Looks and sounds great at 5.5!  Trailer Updates: Special Events/ AV set up: Setup for Shouting at the Screen in T2 with the external speakers and wireless mic receiver, changing its function for T2 mics. Everything has been tested, just turn on the power strip/receiver paneling. I found one of the mics by the curtain so I left it in the charging port with the rest of the other mics. Please remember to put everything back at the end of a show, or leave a note for the next person in. Thanks! Aja is ready - laptop has been tested and I'm charging the bluetooth wand in the booth.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Kat sent over the new playlist/trailer info early, the rest of the files will be available a litt...

NPP Projection Close 7/17

To do this evening/ was completed: Downloaded/ingested Class Of '99 trailer, added it to 7/19 R-rated trailer packs and updated playlists. Set It Off went smoothly. Print is rewound ready for post-inspection. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/17 Lillian

To do this evening/ was completed: KDM for UHF opens Friday. KDM for Twisters opens up tomorrow. Uploaded today.  Weekly Update for Projection is out. Feast your eyes on it! Thanks!  Presentation Issues: Preshow Clips/Playlist: Staff screening playlists are built, scheduled, and have blocked on the calendar.  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Ingested The Sting ,  Deadpool and Wolverine   Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes! Updated info for a few titles and added tracking for the Manitou .  Maintenance/cleaning: Alec gave me a heads up yesterday about needing to move and remount the speakers in T4 since the new server install at WB was today. It took a little while to make sure the drill bits, screws and other tools were correct and in place to make the shift, but I moved the two right surrounds onto their new...

NPP Projection Close 7/16

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set up for trivia at Trees this afternoon + returned everything to storage following the show (DJ key is back in the A/V bin in the mezzanine closet) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting An American Tail: Fievel Goes West (the print is in immaculate condition) and uploaded stills to the shared drive Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Updated the trivia section in the poster cubby after removing some one sheets for the event this evening Cleaning lights on for the night?: Yes + double checked the schedule and initialed for confirmation  Projection cart by entrance?: Yes Additional Notes:

NPP Projection Admin 7/16

To do this evening/ was completed: . Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Received one sheets for Didi , which are in the 3/7 poster box Ordering/Receiving (content): Keys for UHF ,  Inside Out 2 and A Quiet Place: Day One are uploaded Fievel Goes West arrived. We also received A Serious Man , which is meant for Williamsburg, but we're working on getting it over there. It's currently in 3/7  Outgoing/Shipping (content): Print/video Inspection:  The Gate  tech'd, volume logged. Same for  Dr. Black  (4-4.5 vol).  Asset tracking doc updated/checked?: Maintenance/cleaning: T5 booth and projector area vacuumed, ditto 3/7 Cleared dust out of the lamp area, card cage, IMS, ICP, and PIB in the Theater 1 Christie -A Touched up all the main lens files (1.37 all the way through to scope) in Theaters 1, 2, and 3. -A Cue sheets updated/checked (every shift): Cue shee...
To do this evening/ was completed: This morning when I got in I made the rounds to check in with each booth/rack, the fire alarm settings, etc, to make sure nothing was out of place as per yesterday's power trip. Nothing looked out of the ordinary. - L Presentation Issues: Preshow Clips/Playlist: *The new DCP for Dr. Black and Mr. Hyde looks and sounds good! It's all in sync, thank goodness. I let everyone know, but Cristina will still want to take a peek at it tomorrow. I think 3.5 Volume is probably best. It's definitely on the loud side. - L *Got the credits info for UFH , Teknolust and Shouting at the Screen.  Teknolust looks and sounds great. Tech'd the slide, too. KDM opened up - tech'd The People Under the Stairs for this evening. All set.  Scheduled the Thursday Twisters shows. - L Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received the keys for Maxxxine/Despicable Me Outgoing/S...

NPP Projection Close 7/14

To do this evening/ was completed: The Gate print arrived a little after midnight. Residing in 4/6. Brunch content removed from servers. T2 swept and mopped. Presentation Issues: Quick power outage caused projector lamps in 1, 3, 5, 7 to shut off. Turned them back on after a few minutes and rewound films in 3 and 5. Checked lighting panels, which weren't affected. 2, 4, and 6 projectors stayed on. Lost connection to building speakers as well. Disconnected and reconnected the panel ethernet cables from the HTD unit and power-cycled it as well, which resolved the issue. Not sure it was necessary to disconnect cables but went for it. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on f...

NPP Projection Admin 7/14

To do this evening/ was completed: Presentation Issues: Alec was watching  The Little Shop of Horrors  and reported the volume was too loud so it was lowered from 4.5 to 4.0 (listened in after lowering it to 3.7 but this level was too soft) Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ran loops prior to the Cheap Killers screening in theater 1 + the screening went smoothly and the mic used for the intro was returned to the booth (the projectors were cleaned after the show/exhaust ports were closed) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Uploaded keys for People Under the Stairs to the TMS Outgoing/Shipping (content): Print/video Inspection: Re-inspected  Cheap Killers  after the show, packaged it for return shipping, and printed labels/scheduled a pickup for tomorrow morning Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters upda...

Projection Close 7/13

To do this evening/ was completed: Made the rounds, checked in on the booths. Lots of playlist building and checking. No issues this eve.  Friendly reminder that the KDM for The People Under the Stairs should be showing up sometime tomorrow! I built the playlist this evening.  Presentation Issues: Preshow Clips/Playlist: Checked the SE playlists for the last of this week, plus A1.  Built the playlists for the following features for 7/19: UHF The Gate Trouble in Paradise Thief Teknolust Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the other  Horror preshow content 40min, 20min, and 10min Made and ingested the slide for Teknolust .  Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes Maintenance/cleaning: Left a note taped to the bottom of the iMac that reads as a reminder to turn off the Kelmar Table when we're done using it. I found it o...

NPP PRojection Report 7/13 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ocean's Eleven played well for a good-sized crowd. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Third Dr Black Mr Hyde DCP attempt finished. Ingesting to T2. Outgoing/Shipping (content): Print/video Inspection: Put Set It Off and Trouble in Paradise on house reels. Asset tracking doc updated/checked?: Maintenance/cleaning: The air intake filters for the CP2220s arrived. Changed the one in Theater 2. Theater 1's was changed recently. Touched up the gear grease in T1&4 35mm projector motors. Taped the black curtains back up over the 35mm port glass windows for T4. Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 7/12

To do this evening/ was completed: Presentation Issues: Some miscommunication this evening between the front of house staff and a guest who asked for an assisted listening device but did not specify that they needed audio description instead of amplified audio (MODs alerted me about the guest asking for the setting to be changed during the film and the channels were switched) Preshow Clips/Playlist: Kept and eye on volume levels for Longlegs and Fly Me to the Moon (each sounds perfectly fine at their current settings; Longlegs is mixed quite loudly and is perfect at 5.5 for big crowds) Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): UHF feature content became available this evening and was ingested to the TMS Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights...

Projection Admin 7/12 Lillian & Jack

To do this evening/ was completed: New preshow content downloaded and ingested. A1 7/19 playlists built. R-rated trailer pack is missing the Class of '99 trailer, which will be on Drive next week. Those playlists can get updated then. 7/5 content removed from servers. Inspected the rest of Trouble In Paradise, it's in great condition. Put in back on its shipping reels for now. Just FYI all - We have A LOT going on in August with vacation dates. I don't think anyone will have a normal schedule (we've been discussing this more extensively in some threads as you all know, and we're sorting it out very well) but really I just want to remind everyone to keep a very close eye on that month to see the established changes so there's no surprises and you know what days you're working each week. - L Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: As per Alec's request, I swapped the power adapter for the small Apple one aft...

Projection Admin 7/11 (Lillian and Alec) This didn't post yesterday.

To do this evening/ was completed: Lillian here. Just now realizing I did the Longlegs/Fly Me to the Moon addition to the marquee and posters one day early. Getting ahead of myself with the days...I'm going to leave it. We're close enough to the date. Sorry about that, though. If you received an email about scheduling (plans for making everyone's vacation plans work) from Alec today, please take a look! Thanks!  Presentation Issues: Preshow Clips/Playlist: Tech'd the preshow and feature for  Longlegs  and  Fly Me to the Moon .  Longlegs  should definitely be loud enough, but we can bump it up depending on the crowds.  Fly Me to the Moon  needed to come up, I brought it to 6.0 and adjusted the playlists. - L Trailer Updates: Special Events/ AV set up: Spoons all set for tonight. Alec and I tested everything: laptop, mics, and spotlight board! You're all good to go, just remember to turn on the power strip and each individual power button on the rec...

NPP Projection Close 7/11

To do this evening/ was completed: Made the rounds throughout the evening and kept an eye on picture and volume throughout Presentation Issues: The signal between the Apple TV+ box and the monitors above the bar at Trees went down this evening and, despite rebooting the box and trying to reseat the wires, nothing changed (the box and HDMI splitter were also very hot...not sure if this is affecting connectivity or if the wires need looking at again) Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons, Toons, and Booze went smoothly this evening despite a brief issue with spotlight wiring during the setup and having to reorganize the nightmare mess of XLR cables beneath the curtain after the show The Hunt for the Wilderpeople screening in theater 6 was a success and the blu-ray was returned to Chenelle before the show concluded Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset track...

NPP Projection Close 7/10

To do this evening/ was completed: Sandpiper letters down, The Gate up. Set up karaoke and broke down equipment afterward. Returned mixer to T1. The event wasn't listed on the events calendar so the call came as a slight surprise. Not that we could've set up in advance tonight given the omission, but in the future it would be helpful to have the equipment ready in the Trees storage closet so I can avoid having to going into a theater when a movie's on. No big though. Disregarding the private Despicable Me screening listed in events as it seems it's been rescheduled. NoBudge content removed from servers. Please leave the Bad Boys poster for Vlad if it gets taken down tomorrow. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Cagliostro was a hit in T2. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/clean...
To do this evening/ was completed: Had our cinema meeting, we're doing well on content! We've got everything we need for this upcoming week, as well as a few other bits for the next one.  Staff Screenings have been scheduled on the TMS, are blocked on the calendar and the email is out.  The KDMs for Longlegs and Fly Me to the Moon both open up tomorrow morning, so we'll do tech check before the staff screenings.  Presentation Issues: Preshow Clips/Playlist: Took an extra look at Cagliostro to make sure everything is set for tonight. Looks/sounds great at 5.0. Playlist is set.  Looked at Little Shop of Horrors , which is extremely loud at 5.5, so I brought it down to 4.5.  Trailer Updates: Special Events/ AV set up: FYI - the school screening in T1 tomorrow has been cancelled, so I've taken it off the TMS. They'll come back for a different date. TBD.  Checked the DCP in T1 for Shouting at the Screen and when I signed in, it looked like the computer had re...

NPP Projection Close 7/9

To do this evening/ was completed: Presentation Issues: Was testing the spots in theater 4 for the intro to The Sandpiper and, after turning these off, almost immediately got a call that the spots were on in theater 3...rushed downstairs to turn these off and refrained from turning them back on during the intro since I did not want to risk somehow(???) turning these on during the feature in theater 3 as the guest was speaking upstairs Preshow Clips/Playlist: Trailer Updates:   Special Events/ AV set up: The Sandpiper screening in theater 4 went very smoothly (minus the spots for the intro) + cleaned the projectors after the show and closed the exhaust valves to the lamp houses Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Uploaded Fly Me to the Moon  keys to the TMS + began converting Dr. Black Mr. Hyde for Shouting at the Screen to DCP in booth 1 Outgoing/Shipping (content): Print/video Inspection: Re-inspected  The Sandpiper after the show a...

NPP Projection Admin 7/9

To do this evening/ was completed:  Presentation Issues: Looked at the  Dr. Black Mr Hyde  DCP with Cristina, something weird happened with the conversion to DCP because of the framerate. DCP-o-matic automatically selected 30fps as the framerate, which was technically correct, but the DCP did not look or sound good. The movement was videotape-esque and the audio was way out of sync. I ran the original file through HandBrake to convert it to 24fps, which can then get converted to DCP. Had this issue once before with something else and converting it to 24fps did the trick. Audio is being analyzed on DCP-o-matic now. -AL Preshow Clips/Playlist: Feature content added to  Longlegs  and  Fly Me to the Moon  playlists.  Twisters  ingested. Trailer Updates: Special Events/ AV set up:  Framing and focus set for  Sandpiper  tonight. Cleaned the projectors afterward. Good amount of gunk built up near intermittent sprocket. P2 lamp wasn't...

NPP Projection 7/8 Close

To do this evening/ was completed: NoBudge went smoothly, mics brought back to T1 booth, Q&A uploaded to Drive. I did notice a bit of a buzz/hum coming from the speakers when the Mic input was selected. I adjusted the volume levels for the wireless mics, setting the volume back to the pictured level in the manual but that didn't resolve the issue. Wasn't that intrusive, I'd say, but prominent enough in a quiet room. Fly Me to the Moon CRU drive arrived, allegedly. I couldn't find it in any of the usual locations. I did not check the T7 server station, though.  Longlegs and People Under The Stairs features ingested. No more issues tonight in T6 after the afternoon power-cycling. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets update...

NPP Projection Admin 7/8

To do this evening/ was completed: Presentation Issues: Noticed the masking and house lights in theater 7 did not revert back to flat and cleaning following the final round (reset these manually) despite the "show end" cue at the end of the show playlist Rebooted the Apple TV+ box to keep it from malfunctioning and launched the Plex web streamer from the 4/6 desktop since it was not connecting at Trees this afternoon T6 went "offline" shortly after the start of the first round despite the IMB connection glowing green on the touchpad...tried adjusting the ethernet cables to no avail...will have to restart the projector after this round Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Maxxxine  staff screening this afternoon in theater 1 + double checked the NoBudge#40 show playlist for any missing cues and made sure the program was in the proper order Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Uploaded new Maxxxine k...

NPP Projection Admin 7/7

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Heathers and Jaws  screenings this morning went well (content was removed from the respective servers after the shows) Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Outgoing/Shipping (content): Print/video Inspection: Tech'd The Monster Squad show playlist in theater 3 and updated the feature volume Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked cues and schedule/made sure all OCAP show playlists scheduled this morning were accurate + checked cues and schedule for tomorrow and initialed Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Updated the first run and special events whiteboards in 4/6

Projection Close 7/6

To do this evening/ was completed: T6 stayed stable throughout the evening.  Friendly reminder that the keys for Monster Squad open up tomorrow. If no one can take a look at it in the morning, I can do this Monday!  Presentation Issues: Preshow Clips/Playlist: Went through all new A1 and SE playlists for 7/12, plus any playlists left for this week.  Trailer Updates: Special Events/ AV set up: Put all 7 reels of Thief onto house reels, print card is attached.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Cleared what we don't need off the 4/6 desktop.  Print/video Inspection:  Asset tracking doc updated/checked?: Maintenance/cleaning: Cleaned the projectors top to bottom in T1, cleaned the lenses.  Cleaned and tidying the desk area as well as the some of the tools (film counter, loops, etc).  Trash is out in T1. New bag is in there.  Cue sheets updated/checked (every shift): Yes! Mar...

NPP Projection Close 7/5

To do this evening/ was completed: Presentation Issues: No further issues with T6 this evening and everything played as automated Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked the cues for Sunday and cross referenced the TMS schedule + initialed for confirmation Marquee updated?: Heavy rain this evening prevented me from further updating the marquee but  Furiosa can be removed over the weekend Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: ADA device was returned to its charging port in the A/V closet on the third floor

NPP Projection Admin 7/5

To do this evening/ was completed: Alec and I had a great review this morning with Jack! Also, Weekly Update has been sent out (a little belated this week, but we're looking real good for this week and the next.) Please get your eyes on it. Thanks! - L 6/28 playlists and content removed from servers. Fly Me to the Moon and Longlegs preshow content downloaded and ingested, playlists built sans features. Cleaned T4 1:85 and scope lenses and plates. Maxxxine and Despicable letters up. I wrote to DMS about the Theater 6 server and included Interrogator logs from the projector and a detailed report from the IMS. Keep an eye on it for now and try reseating the Eth0 cable if it goes offline again. If that doesn't work, you'll have to restart between shows. -AL Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Screened Bound in T1 today for our staff. Show went super well! - L Ordering/Receiving (posters & trailers): Ordering/Receiving (co...

NPP Projection Close 7/4

To do this evening/ was completed: Presentation Issues: T6 server went offline during the final round and was rebooted after the screening concluded (brought up the lights manually per the timing on the cue sheets and scheduled a shutdown once the system restarted) Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked the cue sheets and cross referenced the schedule on the TMS Marquee updated?: Posters updated?: Added a few new first run titles to the archive tube and reorganized the poster cubby behind 3/7 Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: Updated the special events whiteboard in 4/6 with 35mm titles through August and digital titles through July
To do this evening/ was completed: Early July 4th shows went off just fine. I did come in this morning to find that T6 IMB connection was lost, but rebooting the projector calmed it down. No issues after that. ept an eye on it throughout the day. Please continue to keep an eye on this throughout the evening, just in case. Let me know if you need assistance!  Staff screenings have been built/scheduled on the TMS and blocked on the calendar.  Presentation Issues: Preshow Clips/Playlist: Built the SE playlists for Oceans Eleven, Cheap Killers (SOF), Set it Off, Shouting at the Screen, Little Shop of Horrors      (for Shouting at the Screen and Little Shop of Horrors , I noted on the trailer sheet as still needing to be QC'd).  Trailer Updates: Special Events/ AV set up: Hunt for the Wilder People finished transcoding early this afternoon. Ingested this directly to T6.  Built the playlist for the private Hunt for the Wilder People on 7/11.  Orderin...

NPP Projection Close 7/3

To do this evening/ was completed: Bound down, Thief letters up. 7/12 forecasts downloaded and most A1 7/12 playlists built. The forecasts were in the do not ingest folder but all of the files were there. Often content is ready when residing in that folder, so I just went for it. Jaws intro and screening went smoothly. Mixer turned off afterward. Set up a mic for a little post-Jaws trivia in Trees, brought that back to 4/6. Presentation Issues: Had to pause the last round in T2 about forty minutes into the feature and bring up cleaning lights. Medical emergency. Got the show going again about ten minutes later, rewound a little bit. Cellophane and some new HDMI converters arrived from Amazon. In 4/6. Talented Mr. Dripley DCP ingested to 3, Oceans Eleven to 1. T2 booth swept. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc...

NPP Projection Report 7/3 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled the private event playlist for next Thursday. (A school screening, they're watching Despicable Me 4 ). Trailer Updates: Made 7/12 trailer packs. Note there's a Longlegs specific R pack but this is still technically a maybe. TBC on Monday. If we don't end up booking this, just delete this pack. Special Events/ AV set up: Tested a mic in 3 for tonight's intro. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Talented Mr. Ripley (for Film Feast pre-screening next Tuesday) is being converted to DCP. From the 4/6 desktop to a hard drive. This will finish up this evening. Bound for T3. Transferred the Little Shop of Horrors DCP to another hard drive (Fugazi isn't formatted to be able to ingest from) and ingested it to T3. Hunt for the Wilderpeople DCP is cooking on the Mac downstairs. Likely will finish tomorrow morning. This goes to T6. We...

NPP Projection Close 7/2

To do this evening/ was completed: Prefacing first that the show tonight went great! Apologies for the following ramble - Saw (and only at the last minute) that there was a dcp end show pack in the playlist for  Bound , which I first mistook for the transfer from digital to the analogue processor and with our normal volume adjustments added in, but instead it just immediately brought the cleaning lights up at the start of the show before I could prevent it from executing, which was fine but jarring and kind of a bummer beginning. I built this playlist (and have noticed in a few others) some extremely random changes to them recently, which is why I usually spend Saturday night going through everything I've built. Not trying to point fingers of course ( although I feel a bit like I've been going insane lately with the random playlist changes) but if you tech or re-tech something and make adjustments, make note of it, please. I don't think I would've added a dcp end show p...

NPP Projection Open - Jack, Kegg, and Alec Triple Feature 7/2

To do this evening/ was completed: TMS scheduled for upcoming week.  Loops ran in T1, also took a look at Bound reels one and two, volume logged. Checked out Sandpiper in T4, volume logged. Good bit of bleed on side curtains with regular scope masking, so be sure to use the scope film masking preset. Also applied a bit of gaff tape on the right side of the glass. No eyes on Jaws today. Last round in T3 ends at 10:50 tonight so it can get tech'd then. Plex via the projector in Trees should be back to normal now. I think the splitter I had up there for the Apple TV was failing, but I replaced it with an extra we had on hand. We'll eventually need this splitter for other things so I ordered another one specifically for Trees. -AL Ordered a blackout cover for the fluorescents, in the event one starts flickering again. -AL We received the blu-ray of Hunt for the Wilderpeople , for a private event on 7/11. In the process of being DCP'd. -AL Made copies of the DJ key for Trees. On...

NPP Projection Admin Lillian/Will 7/1

To do this evening/ was completed: McKegg gave me a bell today about the shorts playing at WB tonight as they asked last min to make sure the DCPs are OCAP, the sub files of which were sent with each feature, but not burnt into the films. Talked him through burning them into the image - this is something I discovered whilst running way too many festivals at the film center in Chicago, when, a foreign film's subs were missing (they were not. you can look at already made DCPs in dcp-o-matic, single out the sub file, and burn it into the image with some adjustments so that they come up! it's quite neat, actually. I can go over this with everyone since it's very useful information). Since there was very little time to remake the dcps again with the subs burnt in, McKegg made two on his end and I went to make the other two, but the second was taking too long, so McKegg is working on it on his end since it's moving fast there. This is a courtesy anyhow. Uber connected the dri...