NPP Projection Report 1/31 Open

To do this evening/ was completed: Remember to write the volume down when teching prints, Train Dreams had no volume noted anywhere I could find. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The 9 to 5 playlist for this weekend had all the drag show content from Thursday in it. A new playlist was made (it was dated 013126), so I guess it was just copied and not changed. Got a call that the movie hadn't started and saw the intro slide was paused on screen. Skipped ahead to the Dolly Parton video intro and let it play from there. I made a new playlist for tomorrow. -Because of this, timing on the cue sheet was about 20 minutes off. I let MODs know and fixed it for tomorrow. I set up the wireless mic receivers and the mixer in T1 for the Deuce show tomorrow. The HDMI connection is ready as well, you'll just need to switch some stuff on for them. I put the 1.85 lenses and plates in the T1 projectors after Train Dreams . Make sure to run ...

NPP Projection Close 1/30

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Finished building all CCAP and OCAP first run show playlists for next week (in addition to a special event show playlist for Peter Hujar's Day  on 2/7-8) Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Additional posters for Good Luck, Have Fun, Don't Die  were delivered and stored behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): A Few Good Men boxes are still on the cart. Still no sign of Die Hard with a Vengeance or Unbreakable prints this evening. Hopefully these arrive tomorrow morning. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Additional Notes:

NPP Projection Admin 1/30

To do this evening/ was completed: Still waiting on Monday's prints but they should arrive this evening. 2/6 playlists in progress. Forecasts ingested. Old playlists removed from servers. Shrinking Man tech'd, volume logged. Blazing Saddles blu-ray delivered, ripped, DCP going in T1. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: I replaced the bulb in Theater 1 due to the flicker. I decided to keep the one that was in the projector for now, it hadn't reached warranty hours yet. Might use it as a backup if it works, we'll see. -AL Theater 2 projector channels had reverted to the wrong measured color files, which is why it had a magenta tint. I changed them back and it looks much better now. -AL The 2 open electrical boxes in the Theater 2 booth ...

NPP Projection Close 1/29

To do this evening/ was completed: Presentation Issues: Noticed during that last round in theater 1 ( Send Help ) the picture seemed a bit darker than usual. I thought it might be the "look" of the film since this particular moment was set at night but during one of the more brightly lit scenes I saw a slight the lamp flicker ever so slightly in the brightest part of the frame. Also of note the picture in theater 2 seems to have a magenta tint that is most noticeable during bright scenes, especially over pure white elements like text or credits. Neither thing seems like a hindrance at the moment but it would be worth continuing to keep an eye on over the weekend. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: 9 to 5  tech went fine. Each song needed a volume boost so new cues were added and the playlist saved and synced. There was some confusion from MOD about the pre-show length but that was cleared up quickly (in short the cue sheets did not specify the...

Projection Admin 1/29

To do this evening/ was completed: Been following the tracking for the Die Hard and Unbreakable prints, which were supposed to arrive earlier today, but the tracking info hasn't been updated since they landed in Jersey. They're on the way, but delayed. Fingers cross these show up tomorrow.  Presentation Issues: Preshow Clips/Playlist: Built playlists for Let the Right One In, Frankenhooker and the Die Hard double feature. There is only one playlist for the double feature so far seeing as how the intermission will not have any content (confirmed with Desmond) but the Sam n Bruce 5min preshow after the intermission will immediately follow up with Shay's trivia session, so the 5min preshow we can just pull up manually beforehand. The rest of the show we can do manually, just requires a slight source shift. We'll have to setup for laptop connection before the first show.  Tech'd Arco and Send Help Trailer Updates: Special Events/ AV set up: Set up the speakers, yamaha...

NPP Projection Close 1/28

To do this evening/ was completed: Inspected the rest of Let The Right One In, on house reels. Built a playlist for NoBudge and updated the playlist for tomorrow's 9 to 5 . Certainly recommend double-checking that. Also just occurred to me that Desmond and I did not look at the 9 to 5 feature itself, so check that out too. New 35mm letters up. Samuel preshow ingested. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 1/28

To do this evening/ was completed: Had our weekly cinema meeting and we're in good shape. Staff Screenings posted to the google cal and on 7shifts. You should have also received a weekly update from me. Please read it! Thanks. - LH Presentation Issues: Preshow Clips/Playlist: Scheduled weekend shows and staff screenings on the LMS. The Incredible Shrinking Man has been entered as an Event since there's a special preshow/laptop intro and no requirement for a playlist, you'll just switch sources. Updated the playlists for The Moment with the 5min preshow. - LH Trailer Updates: Special Events/ AV set up: Ran a wire from the mic mixer in T3 all the way to the webcam so this can connect directly for recording and Zoom Q&As. I realized I need a small part to complete this set up, which I ordered. Will finish this up before the Zoom Q&A on the 9th. -A Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the Romancing the Dead 5min, 15min, 25m...

NPP Projection Close 1/27

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Updated the "TLR_SE_PrecodeParade_FEB_DancingLady" clip to its newest version ("V2") in all necessary pre-shows this week and next per Kat's request Built CCAP and OCAP show playlists for The Moment and saved them to the LMS (note: the CCAP version has a 7.1 mix which I've added to its playlist but the OCAP is only in 5.1) Trailer Updates:   Special Events/ AV set up: A Few Good Men was not tech'd/did not have a volume cue so I started the feature at 7.0 and adjusted accordingly. Otherwise the screening went well. All reels are tails out on the work bench in booth 1 and can be re-inspected tomorrow. Both projectors were cleaned and the exhausts shut after the show +  Possessor: Uncut screening in theater 4 went smoothly Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Let the Right One In was delivered this evening and brought up to booth 1 Outgoing/...

NPP Projection Report 1/27 Admin

To do this evening/ was completed: Arco ingested, playlisted, scheduled. The Moment ingested, yet to make playlists. Cue sheets started, those can continue. Tech'd Possessor, Train Dreams, NoBudge and 9 to 5 preshow content. All good. Volumes logged. Will make NoBudge playlist soon. 9 to 5 playlist has updated volume cues but no pause cues yet. Ran loops for tonight, all set. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Downloading the Frankenhooker DCP, will need to be unzipped once it's done. This is going onto the Share folder. Outgoing/Shipping (content): The Birds got picked up. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: The rear surround speakers in Theater 1 are working fine. The channel mapping on the replacement IMS3000 from DMS was different than what we needed (wasn't aware of this until today), which is ...

NPP Projection Close 1/26

To do this evening/ was completed: Ran house checks this afternoon (Lillian already detailed in her blog some of the technical issues we ran into in theater 1) - WB NoBudge shorts ingested to LMS. Inspected the rest of Jurassic Park, back on shipping reels for now. Good condition overall. Hank's Saloon screenings and Trees setup went smoothly. Mics back in booths, Trees equipment broken down at the end of the night. LMS mostly scheduled for the week, waiting on a few features. Made DCPs of most of the 9 - 5 tracks, ingested to LMS. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting A Few Good Men  this afternoon -WB Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Removed The Birds and 13 Going On 30  and replaced them wi...

Projection Admin 1/26

To do this evening/ was completed: Possessor keys open up tomorrow! Can get tech'd first thing in the morn.  Presentation Issues: Preshow Clips/Playlist: Finalized the playlist(s) for Hank's Saloon . Tested spots/mics. See more notes in Special Events. Leon's drive is on the table in 4/6, in its box, all ready to get handed back to him. Spots setting for centre spots in T2 is 301. LH Double checked Road Games . LH  Trailer Updates: Special Events/ AV set up: DJ is coming in at 7:30 for Hank's Saloon afters. I did a preset with the xlr cables into the dj inputs, the dual rca to xlr is on the table though he will bring his own cabling for this I figured it would be best to have it out anyway, along with a powerstrip and extension cord. It should be a super simpe setup. Showed Jack, who has the dj key to turn everything on. Lauren and Ariel reached out to say they'd take the reins on setting him up, but we'll make sure to check in. I checked in with them this eve...

NPP Projection Admin 1/25

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: 13 Going On 30 and The Birds screenings went smoothly this morning (oddly a lot of small children in attendance for The Birds  which was nice to see but also worrisome) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: I put  The Birds back on its shipping reels and packaged it for a return (this will need labels printed but who knows how the storm will affect delivery services so these can wait...both cans are in booth 1 for now)  I continued inspecting A Few Good Men  and placed everything on house reels (the final reel can be looked at tomorrow) Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Jack...

Projection Close 1/25

To do this evening/ was completed: In the morning I'll be monitoring the snow/metro and bus service.  Inspected all of Incredible Shrinking Man , which is in good condition despite crappy leader on most reels. Photos up on the drive.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Managed to get six more of the NoBudge shorts DCP'd this evening, so there's only one more to go! Please DCP Goodnight tomorrow, then we can ingest the rest. As Alec mentioned, the video files and DCPs are in the NoBudge 49 folder on the desktop.  Keys for Possessor are in.  Outgoing/Shipping (content): Print/video Inspection: Incredible Shrinking Man is on house reels now after inspection. I carried on with Jurassic Park, which can get finished up tomorrow.  Asset tracking doc updated/checked?: Maintenance/cleaning: There is a gnarly smell in T7 and we considered swit...

NPP Projection Report 1/24 Open

To do this evening/ was completed: Gil radioed me about no image at the start of the first round in T2. I checked the VNC viewer for the touch panel and the lamp was off, no "unexpected light off" warning so it was never struck (even though there was a lamp on cue in the playlist). Logs confirmed the cue just didn't go through--there was no attempt to strike the lamp. Please check to make sure the lamp shuts off at the end of the night. Presentation Issues: Preshow Clips/Playlist: I was also radioed about trailers in T5 being too quiet for the first round (this was the earliest first run show of the day). I checked the playlist and there was a cue to lower the volume for the book promo (as there should be), but no cue to raise it back for the first run trailers. This was the case for most playlists for this week and next, though some were correct. I updated cues on all of those which needed it. Converted and ingested Desmond's slides for Feb ( Snow Day , Unbreakable ,...

NPP Projection Close 1/23

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Desmond sent intro slides for Die Hard with a Vengeance , Unbreakable , and Snow Day and I converted these to DCP/saved them to the Preshow & Trailers drive Print/video Inspection: Inspected reels 1-5 of A Few Good Men . I also uploaded some stills to share with Conrad and the cinema team. Reels 6-8 are up in the booth and can be looked at over the weekend. Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Took down  Rhinestone from the 35mm side and replaced it with letters for A Few Good Men Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Additional Notes: Updated titles on the 35mm dry erase board in 4/6 through the end of February

Projection Admin 1/23

To do this evening/ was completed: Please note that keys for Possessor come in on 1/25. - L Birds tech'd, volume logged. Looks good. Inspected all of Dancing Lady, put it back on shipping reels. Very nice condition. Started inspecting Jurassic Park, if someone wants to continue with that. Presentation Issues: Preshow Clips/Playlist: Built all first run playlists for the week of 1/23 (lots and lots of playlists...) including these SE shows - Train Dreams, Removal of the Eye, Monk in Pieces, 9 to 5. I have noted on the trailer sheet what still needs to be techd despite being built. - LH  Trailer Updates: Ingested Hoppers T3 & GLHFDD - L Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received and ingested 9 - 5, Send Help, and the following preshow content: Sam Raimi, Survival, Send Help. - LH Matthew brought over A Few Good Men from WB, and Incredible Shrinking Man and Jurassic Park were delivered as well. All in booth 1. ...

NPP Projection Close 1/22

To do this evening/ was completed: Presentation Issues: Cristina texted me during the first reel of Rhinestone to tell me the wrong intro video had played after she gave her remarks. She asked that I play the right one after the film which I told her I would do. The one that had played was "Intro_SE_Dolly" which was not specifically about the film but a more general greeting and intro. I checked the LMS and found a clip titled "Intro_Dolly_Rhinestone" which was not the one in the show playlist or anywhere on theater 1's server, transferred it over, and built a short playlist around it. A song played over the end of the film and in an attempt to get ahead of the rest of the credits I switched over to this playlist, causing a momentary pause in volume and an image overlay on screen. This video played and I continued running the film once it ended. I should've probably waited for the credits proper to end but didn't want to risk too many guests leaving befo...

NPP Projection Report 1/22 Admin

To do this evening/ was completed: Ran loops for Rhinestone today and fixed the projectors up for Scope. Spent some time trying to adjust P1 so it's sharper. I added a masking cue to the playlist since I didn't see one in there. Double checked the Dolly preshow and intro video to make sure the sound was all good. Remember to turn the vents on properly. - LH  Adjust the staff screening for today since we had maintenance going on in T2, but we're all set for it in that screening room for tomorrow morning. Added a house lights down cue. - LH Presentation Issues: Preshow Clips/Playlist: Tech'd Road Games, Secret Agent - LH Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): I noticed today that Road Games was scheduled on the cue sheets and on the LMS as being in T4 but was initially on the calendar for T3, which is what we had received keys for (specifically that screening room) which is why the LMS was sh...

NPP Projection Close 1/21

To do this evening/ was completed: Rest of the returning preshow content ingested. Secret Agent, Sentimental Value and Frankenstein playlists built and scheduled for the coming week. Staff screenings scheduled for tomorrow and Friday. T4 intro went smoothly. Mic broken down afterward. New 35mm letters up. The DJ for Monday's event came by and had a few questions about the setup in Trees, primarily about cable inputs and making sure he'd be able to have a monitor speaker for playback. I think it would be a good idea to make sure all of his inquiries are fully addressed before the event, but sounds like it will be a quick setup, basically just a Serato deck and a monitor.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every sh...

Projection Admin 1/21

To do this evening/ was completed: Please remember to post your blogs!  Sent an email to projection with notes on the power house/lamp house switches. Please read when you can for a brush up.  Had our cinema meeting and we're missing our first run feature Secret Agent still, but the keys have come in. Jeffrey alerted them and they're on it, which is why we've received the keys to begin with, but I just sent a follow up email to confirm we received the keys but still need the feature. I have not sent out staff screening info. Update: received feature. Jack will schedule screenings on the LMS once it is done ingesting. I sent out info to staff and reflected this on the google cal.  FYI - Chenelle has two events on 2/5 at the same time and in the same theatre but they're both on hold and we are of course only going to go ahead with one of them.   Presentation Issues: Preshow Clips/Playlist: Built all Rep R playlists for 1/23 - Few Good Men, Hank's Saloon, Road Game...

NPP Projection Close 1/20

To do this evening/ was completed: Presentation Issues: The motor to projector 1 did not start during the changeover between reels 1 and 2 of  You Got Served . Reel 1 ran out and I brought the house lights up before assessing the issue. I tried turning the motor on and off several times to no avail (the machine itself was powered on), made sure all other switches on the machine were in the "on" position, then finally turned it from auto to manual power which seemed to remedy  the problem. I brought lights back down once the motor was rolling properly and had no further issues. I made sure to cycle the power from manual to auto and back again between reels, running it a little each time to see if it wasn't working in any particular setting. It seemed to run just fine in both modes after this and the rest of the changeovers during the show were smooth. Preshow Clips/Playlist: Went through all first run and special events show playlists and lowered the volume cue for the ...

NPP Projection Report 1/20 Admin

To do this evening/ was completed: LMS scheduled for the coming week with a few exceptions. Still waiting on Sentimental Value DCP and Frankenstein needs a playlist. Cue sheets built as well. Playlists built for The Birds and 13 Going On 30. Marquee updated, brunch side back to usual. Ran loops for tonight and set up mic/mixer in T4. Tech'd Rhinestone, volume logged. Presentation Issues: The color issue in T2, where the top half of the screen goes red, happened again at the start of the first round. I rebooted the projector, and also tried reseating the ICP and LEQD while it was off. On powering back up, the issue happened again, only flashing blue on the bottom half of the screen. I called DMS who indicated the ICP was likely the issue and we cancelled the first show. I found another ICP board in 4/6 and put that into the T2 projector since we had time to test it. This worked, Jack and I watched all the preshow into trailers (and Jack continued into the feature) and there were no ...

Projection Admin 1/19

To do this evening/ was completed: There's a screener in T3 tomorrow for Sirat, which I ingested to the server today (not the the LMS, just to T3). This should screen at 10:10am. Please play the 7.1 version. Thanks!  Presentation Issues: Preshow Clips/Playlist: Built the playlist for Rhinestone, the Dolly video of which we will still need to check out.  Trailer Updates: Special Events/ AV set up: Checked out Minions today before we opened, just to make sure everything looked/sounded good. Saw Alec tech'd Death Race, took one final look just to make sure everything's good. 2 Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Forwarded Jeffrey my request for the Hamnet keys and the response we got, in which they have not received a holdover booking.  Ingested Road Games from Share drive Keys for Marty Supreme should be coming in soon.  Outgoing/Shipping (content): Got Face of Another packaged up and ready for shipping. This has since been picke...

Projection Admin 1/18

To do this evening/ was completed: Thanks everyone for holding down the fort while I've been recovering from a sinus infection. I've been cleaning the surfaces in the booth.  Face of Another went super well today. We basically had a full house for this, which was really great to see considering the snowy morning. I will ship this out tomorrow morning.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The private event in T6 went super well today. I setup a mic, but turns out they didn't want one in the end. I brought the volume up considerably once it started. Spotlight remote back in the booth. Haven't had a chance to grab the mic/xlr (from T4!) since it overlapped with the 35mm show, it's just off to the side in one of our stands.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Keys for Minions and Sirat came in.  Outgoing/Shipping (content): Deleted Little Amelie and Walter Mitty  Print/video...

NPP Projection Close 1/17

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Letters for the rental tomorrow morning have been placed on the brunch side Posters updated?: I began adding posters to an archive tube for 2026 and left it behind 3/7. Some of these titles are technically from late 2025 but were not added to the last tube of posters I organized. Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: I reached out to a guest who asked about Marty Supreme poster availability but both of the emails they left with the bartender in the lobby yesterday bounced back since they didn't exist? For the record we do not have any additional posters for this title

NPP Projection Report 1/17 Open

To do this evening/ was completed: Presentation Issues: When T2 preshow for Little Amelie started there was a strange color glitch going on where about 2/3 of the screen looked red and fuzzy. I tried switching between channels to see if that resolved it but the issue remained. I ended up power cycling, which did the trick. However, roughly 30 minutes into the feature Wyatt radioed me that it happened again but resolved itself. I said I would monitor it and reseat boards (would've started with LEQDs) if there were further issues. Went into T2 and watched the remainder of the movie and there were no more issues. I did not see that second instance of the issue myself, but it was a bit confusing because initially the issue did not seem like something that would just go away on its own. As I mentioned, it didn't go away until power cycling. It also occurred to me that we received a notice about the Little Amelie DCP that there were color space issues, and received an updated versi...

NPP Projection Close 1/16

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Sirāt posters were delivered and stored behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Remaining  You Got Served reels were brought up from booth 1 to 4 + finished inspecting The Birds and uploaded pictures to the shared drive Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: A guest left their email on a slip of paper and asked that we follow up about Marty Supreme posters we could spare (I checked 3/7 and there are none available...not sure if it's worth reaching back out)

NPP Projection Admin 1/16

To do this evening/ was completed: A1 1/23 playlists built. Old content removed from LMS/servers. Looked at You Got Served and As I Open My Eyes, volumes logged. Eyes playlist built. Old letters down, 28 Years up. Minions keys come in Sunday. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Looked at Walter Mitty for Sunday and built a playlist, scheduled in T6. Asset tracking doc updated/checked?: Maintenance/cleaning: Spotlight is back up on the ceiling in T6 with new batteries. Cue sheets updated/checked (every shift): Marquee updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 1/15

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and transferred a show playlist for Nirvanna the Band...  for the programmers' screening tomorrow afternoon (I will be in attendance for this) with a feature stinger to bring the lights down + volume and lights cues for the feature itself...SPL is saved as "NIRVANNA" Trailer Updates: Special Events/ AV set up: Set up for Donwill's DJ set at Trees Lounge + last minute third mic setup for the Shouting at the Screen special guest...slideshow and feature tech went well...intro and screening both ran smoothly too and all gear was put back behind the curtain following the show Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Inspected all of  You Got Served and took pictures to send to Desmond (I had to take the roll of splicing tape from 4/6 down to 1 to make some fixes since we seem to be out of extras?) Asset...

NPP Projection Report 1/15 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: PA set up for Shouting and laptop connection tested. Levels for the mics are set you'll just have to turn the receivers, mixer, and speakers on. Mics are charging up in the booth. Use 1&2. The bluetooth remote for the laptop is in 4/6 and fully charged. Playlist adjusted as well. A few cues added, and brought the volume down to 4.2 in the playlist, though hosts will listen to it before doors to determine a starting level. Ran through the playlist and it's ready to go. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): You Got Served print arrived. Ingested Walter Mitty to T6 Downloading the Removal of the Eye DCP via Filemail. Going onto the Preshow and Trailers drive, Features folder. Outgoing/Shipping (content): Mayor of Hell was picked up. Print/video Inspection: Brought volume for 28 Years Later down to 5.0 in all playl...

NPP Projection Close 1/14

To do this evening/ was completed: Inspected Rhinestone and put it on house reels. Stills uploaded to Drive, Conrad notified. One Battle and Sinners ingested to LMS. Built a playlist for tomorrow's Shouting. I would double-check it for the preshow transition cues. Trading Places intro and screening went smoothly, mics back in booth. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 1/14 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built You Got Served Trailer Updates: Received new versions of the New Year, New Me and Family Friendly trailers. These have been swapped into all appropriate playlists. Special Events/ AV set up: Checked out Trading Places for tonight and checked/updated the playlist. All set! Set 1.90 masking and lens file (along with automation cues) in T2 for Little Amelie . Saved over the 1.50 preset for Bugonia (and deleted the "Bugonia Masking" cue) as we no longer need it. Built and scheduled the playlist. Rhinestone slide made/ingested. We might get a " Rhinestone -specific" intro video for this one. Keep an eye out, Cristina will email it to us if we do. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the updated version of Little Amelie and deleted the old one. Ingested 13 Going On 30 to the LMS Walter Mitty DCP is copying to the George Ivan drive. Plea...

NPP Projection Close 1/13

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled a show playlist for Trading Places for tomorrow night with its intro slide and a feature volume cue (needs to be tech'd for credits/lights cue) + still need keys for this but I reached out to Deluxe and CC'd the programmers...update: keys received and uploaded to LMS Trailer Updates: Special Events/ AV set up: The Mayor of Hell  intro and screening in theater 1 went very smoothly this evening + both projectors were cleaned/shut down following the show (exhausts are shut too) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Film prints for The Birds and Rhinestone  were delivered this afternoon and brought to booth 1 Received and uploaded keys for  Nirvanna the Band the Show the Movie and  Trading Places tomorrow night (these are currently live and will expire Thursday morning) Outgoing/Shipping (content): Print/video Inspection: Placed  T...

NPP Projection Admin 1/13

To do this evening/ was completed: Maximum Overdrive packaged up and on the way to WB. Ran loops for tonight and cleaned projectors afterward. Looked at Hell Up In Harlem and Little Amelie. Amelie is 1:90 and has a weird letterbox to it in 1:85. At the moment I don't think we have 1:90 lens/mask. Trading Places feature only came in this afternoon via Deluxe. Ingested. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Cue sheets for next week are done with the exception of timing for Death Race 2000.  Marquee updated?: The 35mm titles have been updated.  Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 1/12

   To do this evening/ was completed: Maximum Overdrive intro and print went smoothly. Will pack it up tomorrow. Scheduled the coming week in LMS. Started Walter Mitty DCP. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 1/12

To do this evening/ was completed: Programmers will be watching Pillion tomorrow morning at 10:10am. I have a playlist for this already scheduled on the LMS.  Presentation Issues: Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up:  I am running Walter Mitty through Handbrake again for better sound. Please DCP once it is done. Thanks!  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Little Amelie to the LMS Roadgames came in, downloaded via Aspera and ingested to the LMS Keys for Hamnet , Marty Supreme came in and the keys for the Nirvana screener on Thursday will come in tomorrow! I made sure Cristina et all know that we're all set for the screeners this week. Ingested Pillion to T3 for the screener tomorrow, which we also have keys for.  Outgoing/Shipping (content): Made labels for and got Lost Highway on outta here. This has been picked up already. I added the outgoing tracking to the asset doc.  ...

NPP Projection Close 1/11

To do this evening/ was completed: Ripped Walter Mitty but did not start converting to DCP. Golden Globes in Trees went fine. Took down brunch letters at the end of the night but did not get to put up upcoming titles.  Packaged Lost Highway up. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 1/11

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Lost Highway screening went very smoothly this morning (all reels are tails out in booth 1 and can be placed on their shipping reels tonight) Double checked and tech'd the show playlists for  Willy Wonka & the Chocolate Factory and Arco (private event in theater 6) this morning and both shows played without any issues Found a copy of  Maximum Overdrive on Tubi and pulled some credits information from there for the cue sheets tomorrow (these last roughly three minutes following a post script over the last images) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Raekwon dropped off a blu-ray copy of  The Secret Life of Walter Mitty for a private event next week + Little Amélie...  feature content was made available via Deluxe this afternoon Outgoing/Shipping (content):  Willy Wonka & the Chocolate Factory...

Projection Close 1/10

To do this evening/ was completed: No issues this evening, made the rounds multiple times. Had a lot of newcomers tonight! Lots of folks excited to see movies and also wondering how they order concessions.  Friendly reminder to NOT ingest Twinless as it is playing at WB, not here.  Presentation Issues: Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: Tech'd Arco tonight and made sure everything looks good for tomorrow. DCP looks and sounds beautiful. It's a little loud, so I brought it down to 4.8, but see how many bodies are there tomorrow. Credits info all correct both in the playlist and in the cue sheets.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the DCP of As I Open My Eyes to the LMS Keys for Pillion came in.  Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes!  Marquee updated?: P...

NPP Projection Report 1/10 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Lost Highway went very well. Print is rewound on house reels, ready for tomorrow's show. Keys for Arco open tomorrow, if there's time to look at it before the private event please do. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Twinless is playing at Williamsburg, not here, so don't ingest it. I let John know so the booking info can be corrected. As I Open My Eyes DCP is unzipping to the Share folder, please ingest it when it's done. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 1/9

To do this evening/ was completed: Presentation Issues: No further issues with theater 1 this evening following the repairs made earlier today Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Feature content for Twinless was made available via Deluxe + As I Open My Eyes feature DCP continued downloading this evening Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/cross referenced the schedule on the LMS Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Updated the special events dry erase board in 4/6 for all digital titles through the end of the month 

NPP Projection Report 1/9 Admin

To do this evening/ was completed: Haven't received the DCP for Trading Places yet, but it's Paramount, so I wouldn't be surprised if it shows up early next week.  Keeping my eye on this though. - LH  1/16 A1 playlists built. Vacuumed beneath all screens except T2. Presentation Issues: Preshow Clips/Playlist: Tech'd Willy Wonka and adjusted the playlist with new volume/fixed the cue sheets. - LH Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Note: Keys for Pillion will come in on 1/10, so we're set for the screener on 1/13. - LH Arco keys open very late, near midnight, on 1/10. - LH Ingested the following content to the LMS - Reconsider this (Jan), forecasts, the moment (red band trailer, american cyborg trailer, snakes on a plane trailer, Dolly intro card, Dolly 25min, 15min, 5min preshow. - LH Outgoing/Shipping (content): Print/video Inspection: Ran reels for Face of Another (T4), Mayor of H...

NPP Projection Close 1/8

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up:  Dragon Heart private screening in theater 6 went well. Microphone, cables, and mixer were placed back in storage following the show. Spoons went smoothly. All gear was organized and placed beneath the curtain after the show. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: I added letters for  Lost Highway  and its screening dates to the 35mm side Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Additional Notes:

NPP Projection Report 1/8 Admin

To do this evening/ was completed: Took a hot minute to get those keys for Is This Thing On , but they finally came in! Note - I reached out and the keys for Arco will be coming in later tonight, around 9pm. - LH Presentation Issues: Preshow Clips/Playlist: Built a few SE playlists for the week and scheduled them on the LMS. - LH Tech'd Primate /playlist for Primate - LH Trailer Updates:  Special Events/ AV set up: Photo shoot in T1 went well. Blu-ray returned to the renter. Setup for Spoons in T1 with wirelesss mic mixer, yamaha, aja, spots board, mic stands. I added a bit more time on the LMS in case they start a little late. - LH An intro was added to the T6 private event. Mic set up on a stand in the front of the room. Levels are set, just turn the mixer on. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Nirvanna The Band ... for a preview screening on the 16th Ingested Minions, transferred Arco and Hell up in Harlem to their screening r...

Projection Mid/Close Lil and Jack

To do this evening/ was completed: Staff Screenings out on 7shifts, blocked and scheduled. LH 28 Years Later playlists built and scheduled. Lost Highway and Maximum playlists built as well. Pan's Labyrinth went smoothly, print back on shipping reels. Broke down T3 after the Q&A. Disconnected most of the XLRs from the mixer FYI. Presentation Issues: Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: Cyberslime went off without issue! LH Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received Maximum overdrive.  Outgoing/Shipping (content): Shipped off The Queen to Block Cinema in Chicago - LH Print/video Inspection: Inspected all of Maximum Overdrive, which is in good condition. - LH Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 1/7 Admin

To do this evening/ was completed: Hey everyone, when packing up prints, please print and attach shipping labels and schedule pickups immediately and add the outgoing tracking to the asset tracking doc. (That means we'll need to keep this up to date!) We are trying to keep closer track of film shipping costs in the new year. There are columns for incoming and outgoing tracking (John will fill in the incoming, but tag him in a comment on the cell if something is missing that's coming up soon) in the doc for January. This is for 35mm prints only. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Cleaned the projectors and ran loops for Pan's Labyrinth tonight. Mics are set in Theater 3 for Cyberslime. -Heads up, with these smaller Shure mixers in T3 and T7, make sure the "Aux In" knob is turned all the way down. I noticed today that having it turned up markedly affects the sound quality from the mics. Ordering/Receiving (poste...

NPP Projection Close 1/6

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled a special event show playlist for  Willy Wonka and the Chocolate Factory for this weekend + reached out to Kat about putting the Lynch pre-show back on the shared drive/LMS for Lost Highway  Trailer Updates: Special Events/ AV set up: Nuts!  intro, screening, and Q&A all went smoothly (mics sounded a bit low even though the mic dials and processor were turned up louder than normal but the hosts did not seem to mind) + chairs were placed back in the hallway following the show Set up for trivia at Trees this evening + McKegg waited for both hosts to arrive before bringing up some posters and left shortly after the event got underway Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee up...

NPP Projection Open 1/6

To do this evening/ was completed: Pretty slow day overall. 3/7 swept. Primate and Bone Temple ingested. 1/9 A1 playlists made and scheduled for the week. Mics set up in T3 for tonight. Trivia ready to go. Still waiting on prints. Tracking for Maximum came in. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 1/5

To do this evening/ was completed: We we will likely received the film schedule later tonight. Presentation Issues: No issues today.  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Heard back from Chenelle with some more info on upcoming private events, the private shoot in the morning on 1/8 with a few shots in the theatre with El Dorado in the background, which we have ready. No marquee rental for this! I will be there that morning. We're all set for that evening rental, too, also on 1/8. Playlist is done. For the potential event on 1/11, it has yet be fully confirmed but she'll let us know by this evening and I'll pass on that info so everyone's in the know. As for 1/12 and 1/14, those are still on hold with the same content; only one will go forward, still tbd. She'll also try to update us by this evening. - LH Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the Adult Animation preshow for Nuts! and buil...

NPP Projection Open 1/4

To do this evening/ was completed: Presentation Issues: Screened  The Flying Guillotine  for Sundays on Fire and immediately ran into a technical issue at the top of reel 2 on projector 1 as no sound was coming through the speakers in the auditorium or via the processor after the change over was made. I brought the lights up to pre-show levels, alerted the MODs, and got in touch with Cristina about the problem while I was troubleshooting it. I tried flipping the breakers off and on, thinking this might remedy the issue the way it had for the lamp I had trouble striking before the feature (I switched the projector from manual, which would strike the lamp, then back to auto and strike the lamp again from the switch below after switching to auto turned it off...this seemed to work just fine as long as I set it to manual first before doing anything else) but it did not seem to have any effect on the analog sound head's ability to read the track on the print. I got in touch with Al...

Projection Close 1/4

To do this evening/ was completed: No issues here. Quiet evening. Made the rounds and checked in on T1.  Presentation Issues: Preshow Clips/Playlist: Went through new playlists for this week, built the rest of the SEs (Nuts aside) and and scheduled them on the LMS.  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Outgoing/Shipping (content): T3 storage is okay but getting pretty low, so once Happiness is done tomorrow, lets get it outta there.  Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes.  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 1/3 Open

To do this evening/ was completed: Presentation Issues: There was a dowser close cue placed right before the feature in the  Happiness  playlist. I noticed the screen was dark when I went to check on the feature as it started, so quickly corrected it. Removed from the playlist for tomorrow. Preshow Clips/Playlist: FYI- the book promos are too loud at 4.0, these should be played at 3.3 Built and scheduled Christine . Filled in the credits on the cue sheet for Monday. Trailer Updates: Special Events/ AV set up: Pan's Labyrinth went well. All reels are rewound for the show on Wednesday. Projectors cleaned. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the Death Race 2000 and How to Make Millions Before Grandma Dies DCPs to the LMS (Heads up: the latter DCP is named "HTMMBGD...") Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marq...

NPP Projection Close 1/2

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Double checked the Pan's Labyrinth pre-show and Happiness show playlist and everything is in order for tomorrow morning Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): How To Make Millions Before Grandma Dies is still converting to DCP on the George Ivan drive and should finish tomorrow morning Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/cross referenced the schedule for tomorrow and everything is set Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: I am converting an mkv file of my own to an mp4 in booth 1 so please keep HandBrake running and leave the USB connected

Projection Admin 1/2

To do this evening/ was completed: Pretty quiet day all around, but everything is running smoothly.  Staff screenings for Monday and Tuesday are out on 7shifts, just FYI. Also scheduled on the LMS/Google cal.  Ingested the license from Dolby and adjusted the clock for the T1 server, so we're all set in there sync wise. I readjusted the schedule on the LMS and scheduled Thursday showtimes.  Tech'd Flying Guillotine with Cristina as well as Nuts for this week.  Presentation Issues: Preshow Clips/Playlist: Double checked all features and special event playlists for this weekend.  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the Shorts preshow to the LMS ( I reached out to Kat since we're in need of two preshow types still)  Outgoing/Shipping (content): Anytime after Monday is okay for Block to receive the Queen print  Print/video Inspection: Asset tracking doc updated/ch...

NPP Projection Report 1/1 Close

To do this evening/ was completed: The clock on the T1 server was briefly corrected then went back to being 31 minutes ahead shortly after. I let Max from DMS (who was working with Dolby to set it) know. I moved the T1 schedules for tomorrow 31 minutes to account for the clock and scheduled shows in there for the weekend. I decided to turn off the scheduler, which automatically powers the projector/server on and off at scheduled times, for Theater 1 so it stays on and we don't risk the IMB connection dropping out again. Will make sure this gets investigated as it would seem the issue is not with the server. Added quick controls to the T1 server. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We got new keys for Is This Thing On? Started converting the DCP of How to Make Millions Before Grandma Dies on the T1 mac. Outgoing/Shipping (content): Print/video Inspection: ...

Projection Admin 1/1

To do this evening/ was completed: This evening, the clock got updated for the Theatre 1 server, which is great news. I scheduled tomorrow just now. Content is transferring.  Note: We did have the same issue/warning that connection to the IMB had been lost before the first round started in T1. I was able to reboot and we've been stable ever since (knock on woof), but I alerted DMS and sent logs/report for them to look through. I sat in Theatre 1 for a while in case it went down again.  Presentation Issues: The 2:1 cue for masking did not execute in T1. Resaved it (had a exclamation mark in there by accident) but all is well. Very quick fix. I was in the booth when I noticed/ got walkied.  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We need the keys for Is This Thing On , which will expire tomorrow. I forwarded Deluxe's response to Jeffrey since they need us to reach out to t...