Posts

Showing posts from May, 2022

NPP Projection Report 5/31 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built a show playlist with a generic horror pre-show in order to schedule the  Crimes of the Future content for the upcoming week; updated forecast and custom  Crimes of the Future pre-show will need to be added to the week's playlists once uploaded to the shared drive Trailer Updates: Special Events/ AV set up: Built a  Crimes of the Future staff screening playlist but refrained from scheduling it; the keys are active but the content is still transferring to some of the other auditoriums Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Encanto blu-ray for the private event on 6/7 was dropped off and checked for credit offset times Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes; Crimes of the Future information was updated Maintenance/cleaning: Cue sheets updated/checked (every shift): Updated cue sheets and scheduled all available

NPP Projection Report 5/31 Admin

To do this evening/ was completed: Work on cues and schedule for next week. A blu-ray of Encanto , for a private event on Tuesday the 7th in Theater 5, is getting dropped off tonight by the host. Presentation Issues: Preshow Clips/Playlist: Checked in with Kat about this weeks B Forecast and the Crimes of the Future preshow, they’re being reuploaded and will be ready late tonight. Converted slides for Set It Off , D.E.B.S. , Bound , Dog Day Afternoon , Gremlins 2 , and Land Before Time . Ingested them all to the TMS. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Crimes of the Future drive came, ingested it to the TMS. Outgoing/Shipping (content): Bug and TMNT prints were picked up. Print/video Inspection: Looked at RRR with Cristina in Theater 2. It’s very very loud so I set it to play slightly quieter than normal, it’s going to be a full house though so we should check it the night of and give it a bump if n

NPP Projection Report 5/30 Close

To do this evening/ was completed: Presentation Issues: During the  Ricochet  screening this evening in theater 4, the leader at the top of reel 4 snapped from there being too much slack around the rollers beneath the film failsafe (by the take-up reel on projector 1). I had thread perfectly and double checked the film to be sure, but didn't think the slack would snap from the jolt of the take-up reel pulling down on it. Approximately a foot of film fell to the ground before I noticed the break in the leader (between the numbers 9 and 10 on the countdown) and I closed the dowser and brought the lights up immediately upon realizing the damage. After rethreading the film onto a separate take-up reel I started the projector motor and brought the house lights down. The reel played smoothly after this fix. Then, during the changeover from reel 5 to reel 6 (which was also thread on projector 1), the leader broke around the failsafe in the same exact spot, and then again between the numbe

NPP Projection 5/30 Admin

To do this evening/ was completed: Attempted to download and ingest Forecast 0603B but it's missing one of its conversion files so the ingest failed. The same goes for the CotF preshow content. So neither of those elements have been ingested yet. All playlists have been updated for 6/03, they're just missing the Forecast B element.  Reached out to Deluxe about CotF DCP, received tracking for it and we should have it by EOD tomorrow. Asset spreadsheet updated. Swept and mopped all projection booths, cleaned 35mm lenses that are in T6 and T1 projectors, log has been updated. Presentation Issues: Renee Michele notified me that she felt the very end of the Top Gun preshow and the Tom Cruise intro at the beginning of the feature were too loud for the audience. Sat in on the preshow and beginning of the feature and the only elements that seemed too loud for me were the Desert Hearts trailer and the Bric advert. Volume for both of these could be taken down slightly, but overall everyt

NPP Projection Report 5/29 Admin

To do this evening/ was completed:  Presentation Issues:  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Teenage Mutant Ninja Turtles: The Movie screening in theater 1 this afternoon went smoothly; the print was re-inspected, and placed on the cart behind 3/7 Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes (added what information I could for Crimes of the Future ) Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Added letters for Dog Day Afternoon and its corresponding screening dates Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 5/28 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: 6/3 B Forecast and Crimes of the Future preshow still haven’t uploaded to Google drive completely, I’ll have to ask Kat about it when she gets back on the 1st. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ingested new trailers for Elvis and The Black Phone . Ordering/Receiving (content): Outgoing/Shipping (content): Placed the Bug print on the cart and moved it to 3/7. Scheduled a FedEx pickup for this and the TMNT print for Tuesday 5/31, so please re-inspect that print after the screening tomorrow, I attached the included shipping labels so just secure the cans with the included cable ties and place it on the cart with Bug , to be moved to the entrance at the end of the night Monday 5/30. Printed and attached return labels for Ricochet , however I don’t want this one to go out on 5/31 with the other two as I would like to inspect it after the screening. Print

NPP Projection 5/28 Open

To do this evening/ was completed: Took down Bug letters, waiting for TMNT to conclude to put up more rep titles.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: DJ setup and event in Trees went smoothly, turntable returned to 3/7 booth, cables brought back to 4/6. Intro and TMNT screening in T1 went very smoothly, mic returned to the booth, reels rewound for tomorrow. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 5/27 Close

To do this evening/ was completed: Presentation Issues: A guest in theater 7 mentioned to one of the servers that Men  was too quiet; I went into the auditorium and listened to the film, there was a near silent scene on screen, and raised the volume ever so slightly (it was closer to the end of the film and it gets quite loud)  The second round in theater 4 did not start as automated; the three rounds in this auditorium are stacked back to back so it was likely the TMS missing the scheduled cue to start the show playlist Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Inspected  Beyond the Black Rainbow and added photos to the shared drive; the print is in excellent condition with some very light scratching on the base and emulsion sides throughout Asset tracking doc updated/checked?: Yes (for  Beyond the Black Rainbow ) Maintenance/cleanin

NPP Projection 5/27 Admin

To do this evening/ was completed: Inspect Beyond the Black Rainbow. Presentation Issues: Preshow Clips/Playlist: Downloaded and ingested Forecast 6/3 A, the new Nitehawk Diaries trailer, and the Brunch Club trailer. The 6/3 B Forecast and Crimes of the Future preshow are still uploading. Built and scheduled the playlist for Scott Pilgrim . Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Received posters for Bodies, Bodies, Bodies . Reorganized the caddy a bit and put Top Gun , Bob’s Burgers , and Crimes of the Future posters in a new archive tube. Ordering/Receiving (content): Received keys for RRR , they are active but they did not come with enough time for me to tech it today, but we will have time next week. The credit offset was included with an email with info on the DCP from Variance, so I added a lights up cue to the playlist.  Outgoing/Shipping (content): Born to Win and Return of the Jedi prints were picked up. Print/video Inspecti

NPP Projection 5/26 Close

To do this evening/ was completed: Removed all outgoing content from TMS-- Northman, Bad Guys, Unbearable Weight.  Presentation Issues: 35mm P2 in T4 is producing a significant blur on the right side of the screen. I tried to adjust the lens after changeovers but the blur remained.  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Bug screening went smoothly with one presentation note above. Print has been left tails out beneath the rewind bench in 4/6. Mixer and cables brought back to the booth as well. Private event in T3 went smoothly overall but the playlist did not pause at the right moment, resulting in the sound processor switching back to Digital 1. I didn't notice this until it was time to start the second round of the screening. I had to manually pause the playlist to keep the intro slide on screen. I teched the mic before the show and it was functioning properly.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipp

NPP Projection Report 5/26 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set up a microphone for the private event in Theater 3 tonight, an intro was added last minute. Despite the mixer being in use for the intro in Theater 4, we can still connect a microphone to the processor, we just have to enable Phantom Power on the Dolby CP750 Setup app on the Theater 6 Booth PC. It is quieter than if the mixer is used, but this is the only option since the intro in 4 is happening at about the same time. I made a cue to set the volume to 10 and added that to the private event playlist for their intro. It sounds fine, just not as robust as if we were to use the mixer. I let Chenelle know that I had to connect the mic this way and it would be quieter than normal. Mic was still set up in Theater 4 from last night. Ordering/Receiving (posters & trailers): Received a new Trail Mix drive. Ordering/Receiving (content): The Scott Pilgrim DCP arrive

NPP Projection Report 5/25 Close

To do this evening/ was completed: Presentation Issues: During the pre-show before the  Born to Win  screening in theater 4 I tested the changeovers and noticed the changeover gate on projector 1 was not raising up whenever I pressed the button to trigger it to switch. Alec was present to watch the film and came up to the booth to look over everything with me. He saw that the audio was switching from projector to projector despite the gate being locked in the down position so I rebooted everything and tried the buttons again but the gate on 1 still would not raise up. Due to this, I ran the first reel from projector 2 and, whenever I had to switch to the opposite side, lifted the changeover plate by hand as I triggered the other plate to turn down Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Born to Win screening in theater 4 went smoothly; mic and mixer were left behind the curtain for tomorrow evening's introduction to Bug  Ordering/Receiving (posters &

Update: NPP Projection Report 5/25 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: I must have deleted this from my initial report accidentally, but the Star Wars 35mm staff screening went great today. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 5/25 Admin

To do this evening/ was completed: Continue inspecting Ricochet . Born to Win 35mm screening with intro in Theater 4, mic is all set. Presentation Issues: Preshow Clips/Playlist: Built a playlist for tomorrow night’s private event with their preshow into their short. Scheduled it twice tomorrow night. Scheduled playlists for Wednesday 6/1 and Thursday 6/2. Built and scheduled a preshow playlist for Ricochet . Downloaded and ingested the 15min Late Round preshow clip. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Re-inspected the Star Wars Episode VI print and filled in the report. No damage occurred during the screening. Teched the Train of Thought DCP, which is the short film for the private event tomorrow night. It’s good to go. Began inspecting Ricochet , it’s in great condition. Timed credits for TMNT , filled in cues. Asset tracking doc updated/checked?: Yes, checked tracking for Scott Pilgrim , i

NPP Projection Report 5/24 Close

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: One of the Late Round preshow clips seems to have stalled uploading, I’ll double check in case it’s complete tomorrow morning otherwise I’ll check in with Kat. Built and scheduled a playlist for RRR. Built two playlists for TMNT preshow, one with the intro slide and one without. Made a short preshow playlist for the Star Wars staff screening tomorrow morning. Trailer Updates: Special Events/ AV set up: The private screening of Fire of Love in Theater 1 went well. Style Wars screening, intro, and Q&A went very smoothly. All mics are in the charging port in the booth, and the XLR cables and fifth mic for the Q&A are back in their respective bins in 4/6. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Downloaded the preshow and short film for the private event on Thursday 5/26, ingested the preshow to the TMS and the short to Theater 3. Ingested Top Gun , Bob’s Burgers ,

NPP Projection Report 5/24 Admin

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Downloaded and ingested all available first run pre-show content for the upcoming week and updated all show playlists with new forecast content; built show playlists for  Top Gun: Maverick and The Bob's Burgers Movie Trailer Updates: Special Events/ AV set up: Private screening with Jess and guests in theater 1 this morning was brief but went smoothly; removed this content from theater 1's server Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ricochet and Return of the Jedi 35mm prints were delivered Outgoing/Shipping (content): Print/video Inspection: Teched the first reel of Return of the Jedi for Desmond and John in theater 1 Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Added Dog Day Afternoon i

NPP Projection Close 5/23

To do this evening/ was completed: Finished inspecting Dog Day Afternoon print--it's in good condition aside from being covered in a light oily substance. Tried to clean it off on the rewind table but I wasn't that successful. Uploaded Jews & The Blues Q&A to shared google drive. Took down Jews letters, put up rep titles that play later this week. Locally ingested DCP for tech in T1 tomorrow morning. Returned Jews DCP to filmmaker. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Jews & The Blues event went smoothly. Wireless mics returned to T1.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Yes Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 4/23 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Updated cues and credit offset times for Fire of Love and Style Wars and   built/tested a show playlist for Style Wars and the corresponding short film attached to it; downloaded and ingested all available pre-show content for the upcoming week and made new show playlists for first run programming Trailer Updates: Special Events/ AV set up: The Bad Guys private screening in theater 1 went smoothly  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Gremlins 2: The New Batch 35mm print was delivered; Ghost World  and The Bob's Burgers Movie  DCPs were delivered (the latter was ingested to the TMS) Outgoing/Shipping (content): Print/video Inspection: Teched the first reels of  Born to Win and Bug  for Cristina in theater 4 and noted volume levels (there is still a bit of image bleeding on the left side masking from projector 1 which will need to be taped over before the start of th

NPP Projection Report 5/22 Open

To do this evening/ was completed: Presentation Issues:  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Removed Ghost in the Shell and added letters for Jews & the Blues   Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: The MODs asked that we keep the music on the third floor turned off (the system is currently muted via the panel beside the desk in 4/6) as they have the door to theater 4 propped open to allow for the auditorium to cool; chances are this will remain this way until the HVAC situation in that room is fixed

NPP Projection Report 5/21 Open

To do this evening/ was completed: Theater 4 is having AC issues, shows have been marked sold out for the night although tickets had already sold for all three showings. If the port window starts to fog up, remove it before it blurs the picture on screen. Presentation Issues: Preshow Clips/Playlist: Built and scheduled a playlist for the private Fire of Love screening on Tuesday night. The event memo lists no intro or Q&A so I just built the playlist with an all ages preshow and the feature. Trailer Updates: Special Events/ AV set up: Ghost in the Shell screening in Theater 1 went well. Jess emailed me about a tech check for a friend of Nitehawk’s video. We won’t be screening it for an audience at any point, they just want to look at it on a big screen. The tech is currently scheduled for Tuesday at 10am in Theater 1. They should be getting in touch with me to coordinate the delivery of the video, not sure of format yet but I’m guessing it will just be a file played via HDMI and

NPP Projection Report 5/20 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): RRR  DCP was delivered  Outgoing/Shipping (content): Print/video Inspection: Finished inspecting the last of few reels of  Teenage Mutant Ninja Turtles (the print is in excellent condition) and uploaded some stills to the shared file on Google Drive Asset tracking doc updated/checked?: Yes; RRR information was added, though, there were no credit offset times listed on the DCP label Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Behind 3/7 for the weekend Additional Notes:

NPP Projection Report 5/20 Admin

To do this evening/ was completed: Finish inspecting TMNT . If the rain dies down, add the next rep title ( Jews and the Blues w/ Q&A) to the marquee. Presentation Issues: Preshow Clips/Playlist: Removed all Stub PSAs and replaced them with the Nitemoves clip. Also noticed some of this week’s playlists still had the 0513B forecast in the preshow, I swapped in the current version. Downloaded and ingested the Bric X Nitehawk promo. Converted Born to Win and Bug slides to DCP, built preshow playlists for both. Trailer Updates: Special Events/ AV set up: The private Doctor Strange screening in Theater 1 went well again today. Ordering/Receiving (posters & trailers): Received posters for Marcel the Shell with Shoes On . Ordering/Receiving (content): Top Gun DCP came, ingested to TMS. Chenelle informed me the blu-ray for the 5/26 private event was dropped off, she'll be giving it to Kat to convert to DCP. Received the Beyond the Black Rainbow print, brought it up to Booth 1

NPP Projection Close 5/19

To do this evening/ was completed: Removed Fantastic Beasts , Sonic,  World's Fair and Hold Your Fire  content from TMS. Inspected first three reels of Set It Off. Uploaded new keys for Bad Guys and Northman.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Private Hold Your Fire event in Trees and T2 went smoothly. Returned wireless mics to T2 booth, brought wired mic and XLR back to 4/6. Mic stands are behind T2 curtain, right side. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/19 Admin

To do this evening/ was completed: Inspect the Set It Off print. Download and ingest the Nitemoves promo. Private screening of Hold Your Fire in Theater 2, with an intro, intro video, another intro, and a Q&A. Playlist is ready to go, everything is DCP including intro video and intro/Q&A slide. Mic stands are behind the curtain in the theater along with the director chairs. Presentation Issues: Preshow Clips/Playlist: Built and scheduled the Jews and the Blues playlist. Downloaded and ingested the generic Drugs preshow for Born to Win . Trailer Updates: Special Events/ AV set up: Private Doctor Strange screening in Theater 1 this morning went well. Plugged all stationery spots back in in Theater 2, only the two in the middle had been reconnected. Set four mic stands with the heads for the wireless mics behind the curtain in 2, and left a stand in Trees Lounge for the mic setup there. Ordering/Receiving (posters & trailers): Received posters for Top Gun: Maverick . Orderi

NPP Projection Report 5/18 Close

To do this evening/ was completed: Finished adding all titles to the TMS scheduler and updated cue sheets accordingly Presentation Issues: Preshow Clips/Playlist: Added the updated the "Be Gay Do Crime" trailer to all appropriate playlists at Kat's request Trailer Updates: Special Events/ AV set up: Found Footage Festival screening in theater 1 went smoothly Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes (Alec left multiple prints on the cart by the entrance for return shipment) Additional Notes:

NPP Projection Report 5/18 Open/Event Support

To do this evening/ was completed: Continue scheduling playlists for next week and fill in credits on the cue sheets. Presentation Issues: Preshow Clips/Playlist: Built and scheduled a playlist for Found Footage Festival tonight with generic preshow and 90 minutes of the live HDMI CPL. Converted the preshow and holding slide for tomorrow’s private event to DCP. Built and scheduled the playlist. Built playlists for Downton Abbey and Ghost in the Shell . Trailer Updates: Special Events/ AV set up: Set up and teched Found Footage Fest with one of the hosts before opening. Before their show I pulled everything out and showed Will the set up and he got the show started. Went smoothly. Ordering/Receiving (posters & trailers): Received posters for Elvis and Brian and Charles . Added them to the caddy. Received a new Trail Mix drive. Ordering/Receiving (content): Outgoing/Shipping (content): Attached the UPS return label to the High Tide print, carted it along with our outgoing drives t

NPP Projection Report 5/17 Admin

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Built a show playlist for The Bad Guys and scheduled it in theater 1 for a private event on 5/23; added the updated "stubs" content to all playlists for the week Trailer Updates: Special Events/ AV set up: Doctor Strange in the Multiverse of Madness  field trip screening in theater 5 went smoothly  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Brought all outgoing DCPs to the UPS store for return shipping Print/video Inspection: Got through the first couple minutes of reel one of  Teenage Mutant Ninja Turtles for Desmond and John in theater 1 and noted volume levels (Juan was completing maintenance to the tables in the auditorium so Desmond decided to end early - not sure if he's planning on rescheduling another tech before the film is shown but the rest of the print still needs to be inspected before anything else happens with the oth

NPP Projection 5/16 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Videodrome screening went smoothly. Print is resting tails out in T1 booth. I was getting a significant blur on the far right side of the screen from P1. Only two reels ran on this projector. Might just need a simple repositioning. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: No, letters for Videodrome are still up.  Posters updated?:  Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/16 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: All new pre-show content was downloaded and ingested for this week's programming (the updated stubs trailer will be ready tomorrow morning and added to the playlists); built new playlists for the week sans Downton Abbey: A New Era  Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Men DCP was delivered and ingested; the 5.1 file was deleted Outgoing/Shipping (content): Print/video Inspection: Began inspecting Teenage Mutant Ninja Turtles  (the first two reels to be exact) as Desmond asked to view it tomorrow morning Asset tracking doc updated/checked?: Maintenance/cleaning: Placed new lightbulbs in the wall fixtures in theater 3 (which strangely had none in them to begin with) Cue sheets updated/checked (every shift): Yes (added credit offset times for Men ) Marquee updated?: Set aside letters for Ghost in the Shell  behind 3/7; these

NPP Projection Report 4/15 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The Mask screening in theater 4 went smoothly; re-inspected the print as it was being broken down back onto its shipping reels (used the reverse side of Alec's inspection report for notes) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 5/14 Close

To do this evening/ was completed: Presentation Issues: Jack reminded me about the lens offset on the 1.78 DCP projector channel in Theater 4. World’s Fair is in this ratio and is screening in this theater so I checked it between rounds. As Jack mentioned it was bleeding on the left side of the curtain. I used the alignment test to adjust the offset to the right on the 178 ILS before the film’s screening. Preshow Clips/Playlist: Built and scheduled a preshow playlist for the Watchmen screening. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Cleared features from theaters which they won’t be screening in, and got rid of some obsolete playlists. Print/video Inspection: Timed the credits for Watchmen and updated the timing on the cue sheets. Emailed projection about a change to the film inspection protocol, basically just inspecting the print twice, once before screenings and again afte

NPP Projection 5/14 Open

To do this evening/ was completed: Updated all playlists by removing Stubs content.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: 35mm Mask screening in T4 went smoothly. Reels have been rewound, ready to go again tomorrow. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 5/13 Close

To do this evening/ was completed: Style Wars DCP finished transcoding; Ghost in the Shell finished ingesting to theater 1 Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Behind 3/7 for the weekend Additional Notes:

NPP Projection Report 5/13 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled preshow playlists for The Mask and Videodrome. Scheduled playlists for the private Doctor Strange screenings on the 17th and the 19th. Used the same playlist as I did for the private event on the 12th as it just has a 30 minute preshow with no previews. The private event Doctor Strange playlist was scheduled in Theater 1 for two of the regular screenings this weekend, one on Saturday and one on Sunday. Since this playlist has no trailers nor any in house trailers/PSAs we can’t use it for public screenings and it’s also 10 minutes too short. I replaced the playlist and updated the cues for these screenings. Trailer Updates: Special Events/ AV set up: Placed 1.85 lenses and plates in the Theater 4 projector for the Mask screening tomorrow. Ordering/Receiving (posters & trailers): Received posters for We’re All Going to the World’s Fair and Avatar 2 . Placed one World’s Fair in the

NPP Projection 5/12

To do this evening/ was completed: Teched Watchmen print with Desmond, volume levels have been logged. Swept all booths but was unable to mop because we are out of swiffer pods, so I did not update the maintenance log. Teched WAGTTWF in T4. Content is good to go but there was an issue with the picture alignment resulting in some bleed on the left curtain. Will have to be teched again tomorrow. Attempted to ingest Jews and the Blues after transferring the DCP to our DCPII drive. Was able to locate the content finally but the ingest failed due to various errors, did not reattempt/restart IMS. Desmond gave me an external hard drive that has a lot of preshow content on it. I removed a lot of content from the DCPII drive in order to transfer the content on this drive, including the Jews and the Blues DCP , so that will have to be retransferred back onto DCPII.  Connected the DCPII drive to the T3 Christie but the drive would not turn on, preventing me from ingesting the content locally, so

NPP Projection Report 5/11

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Downloaded and ingested the  We're All Going to the World's Fair   pre-show and built its show playlist; Kat sent a trailer for Set it Off to be played following Desmond's intro of Blade Trailer Updates: Special Events/ AV set up: This Much I Know to Be True  screening in theater 3 went smoothly Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We're All Going to the World's Fair DCP was delivered and ingested; new trailer mix was also delivered Dog Day Afternoon print was delivered and brought to theater 1 Outgoing/Shipping (content): Print/video Inspection: Blade pre-show and Set it Off trailer were tested this afternoon; added additional leader to the Sundays on Fire trailers Asset tracking doc updated/checked?: Yes Maintenance/cleaning: Cue sheets updated/checked (every shift): Added times for  We're All Going to the World's Fair Marquee updated?: Po

NPP Projection Report 5/10

To do this evening/ was completed: Built a show playlist for the Face/Off screening in theater 3 and finished the schedule and cue sheets for the upcoming week (waiting on first run DCP content for Men and Downton Abbey: A New Era ) Presentation Issues: The automation cue did not trigger the masking to move to SCOPE at the beginning of Face/Off in theater 3 but everything else worked smoothly Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Face/Off screening in theater 3; the DCP content would not ingest to the TMS or locally to theater 3 despite my attempts to re-ingest it after rebooting the system so the blu-ray back up was used instead Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Matthew brought the Face/Off DCP and blu-ray to the theater this afternoon; 35mm print of Bug was delivered and brought up to 4/6   Outgoing/Shipping (content): Print/video Inspection: Spliced together the three 35mm trailers intended for use ahead of  Mill

NPP Projection 5/9

To do this evening/ was completed: Teched Chucky, Videodrome and The Mask for the programming team. Volume for both prints has been logged. Ingested slide for Face/Off. Reached out to Kat about Face/Off DCP--it should either be ready on the shared drive tonight or it will be brought over tomorrow morning. Cleaned 35mm projectors in T1 and T4. Ingested new preshow content, playlists have been updated. Attempted to locally ingest Jews and the Blues DCP but could not locate it in the ingest scan on T1 server. Connected the drive to 4/6, still couldn't locate it. Something to look into tomorrow. Presentation Issues: Round 2 in T5: image freezing about ten minutes into the feature. Restarted T5 IMS, got the show running smoothly. T2 Round 3 did not start as automated. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received the trailers meant for yesterday's Sundays on Fire. The trailers h

NPP Projection Report 5/8 Close

To do this evening/ was completed: Bride of Chucky keys were delivered and ingested and should be active by tomorrow morning for inspection; reached out to Kat regarding the Face/Off DCP but have not heard anything back (update: she is going to convert it to DCP tomorrow and try uploading it to the Drive then; unless that takes too long she will have a physical copy brought over) Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection 5/8 Open

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Sundays on Fire 35mm screening went smoothly. Print is back on its shipping reels, resting in T1. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection 5/7 Open

To do this evening/ was completed: Presentation Issues: Round two in T2 did not start as automated. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons set up and event went smoothly. All equipment has been returned to 4/6, mic stands beneath T1 screen. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): 35mm trailers for tomorrow's Sundays on Fire will not be delivered in time. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection 5/6 Close

To do this evening/ was completed: Inspected Videodrome print, it's in good condition. Uploaded frame stills to Cluster app. Picked up DCP for The Jews and the Blues.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/6 Admin

To do this evening/ was completed: Presentation Issues: One of the servers in theater 2 said the Multiverse of Madness  pre-show volume was too low (it is automated to play at 3.5) but it sounded fine to me, though, the audience chatter was drowning it out a bit; I brought it up to 4.0 through the quick controls tab on the TMS but that made it too loud so I split the difference manually and had it play at 3.7 Preshow Clips/Playlist: Trailer Updates: Pre-show trailers were switched at Kat's request for tomorrow's  Batman  screening Special Events/ AV set up: Bound pre-show walkthrough with the hosts went smoothly, though, the light board in this auditorium no longer has any wash lights programmed on it, which the hosts will most likely end up using for their performance Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Videodrome print was delivered and brought to theater 1;  Hong Kong trailers are scheduled to arrive tomorrow Outgoing/Shipping (content)

NPP Projection Close 5/5

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Private event in T3 went smoothly. All equipment returned to 4/6. Mic stands beneath T3 screen. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?:  Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/5 Admin

To do this evening/ was completed: Wrote on the whiteboard what to look out for over next week when I'm gone: Face/Off in-house DCP and the trailers for Sundays on Fire. Please also keep an eye out for the Videodrome print which will be dropped off by DHL, if it doesn't come by Wednesday 5/11 have John check on the tracking. Please inspect Videodrome when it arrives. It's also a possibility we'll open We're All Going to World's Fair next Friday, but we'll know when we get the film schedule on Monday. If we do get it, it will come through Eclair. I also scheduled a few emails for when I’m gone for reminders about events. A print of Dog Day Afternoon should be coming on Tuesday 5/10 via FedEx, leave it in booth 1 as it doesn't screen until the beginning of June. Presentation Issues: Preshow Clips/Playlist: Created the Live HDMI CPL on Theater 1 IMS and built it into a 3 hour playlist for STB on Saturday and scheduled it from 10:30 to 1:30. Its just the

NPP Projection Report 5/4 Close

To do this evening/ was completed: Presentation Issues:  Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons Toons & Booze event in theater 1 went smoothly; mixer, mics, and mic stands were moved to theater 3 for tomorrow night's event (the mics were also connected and tested) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/4 Admin

To do this evening/ was completed: STB in Theater 1, last round. Everything is set up for the event, power strips (both the ones under the curtain and the one by the server entrance for the moving spotlights), mixer, and spotlight board need to be turned on and mics set on stands. Also set up the Splashtop connection to the Booth 1 PC and open the Theater 1 IMS Macro Execution page for Michael to control the volume. The HDMI to projector connection and 1/8" cable to the sound processor are ready to go under the curtain, they just need to be plugged into Michael's laptop for picture and sound. Presentation Issues: Preshow Clips/Playlist: Downloaded and ingested the Comics 40min preshow clip. Built and scheduled the Batman playlist. Reached out to Deluxe about keys for this, they said they're on hold so I forwarded their message to John to see if he can check with WB. Need the special slide for the Blade intro before building that playlist. Converted the holding slide for

NPP Projection Report 5/3 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Trivia at Trees Lounge went smoothly  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Removed Drag Me to Hell ; added Blade  Posters updated?: Cleaning lights on for the night?: Yes  Projection cart by entrance?: Yes Additional Notes: House on Haunted Hill print   and archival poster tubes were placed on the cart for pickup at Matthew's request

NPP Projection Report 5/3 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled playlists for Bride of Chucky,   This Much I Know to Be True , and Sundays on Fire preshow. Need another Comics preshow clip to build Batman and Blade playlists. Made a few updates to next week's playlists and trailer packs. The R pack did not have the book trailer and was therefore too short, and the PG pack had the latest Lightyear trailer which made it too long. Since we're only mandated to play the newest Lightyear trailer before Doctor Strange , I put the previous version of the trailer in the PG pack to get it to the right length. The preshow for the Doctor Strange playlist was off, too. It had two all ages preshow clips instead of the 15min Comics clip which was available to download from Google Drive. These updates changed the timing for certain shows, I noticed they were changed on Thursday's cue sheets as I put in the runtime of the previous playlists for that

NPP Projection 5/2 Close

To do this evening/ was completed: Downloaded and ingested new Forecast and TIP content--new playlists have been updated. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Drag Me To Hell in T1 went very smoothly. Print has been rewound and placed back in its cans. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes:

NPP Projection Report 5/2 Admin

To do this evening/ was completed:  Presentation Issues: AC Blower interlock alarm in theater 1 Preshow Clips/Playlist: Built new show playlists for the upcoming week; the new forecast content will need to be added to them once Kat uploads the files to the shared drive tomorrow morning (also built a show playlist for a  Multiverse of Madness staff screening on Thursday morning) Trailer Updates: Special Events/ AV set up: Tested the first two reels of  Drag Me to Hell  for Cristina in theater 1 this afternoon; the print looks and sound great Ordering/Receiving (posters & trailers):  Ordering/Receiving (content): Born to Win print   was delivered this morning and brought up to 4/6 Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Yes Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?:  Projection cart by entrance?: Additional Notes: