NPP Projection Open 10/12

To do this evening/ was completed: Presentation Issues: I noticed during my techs this morning that the NewFest show playlists are set to start on the "Digital 4" channel for the pre-show Spotify playlist, however, I only got playback once I switched to the "Non-Sync" channel...future playlists could benefit from being updated with this cue so as to keep us from having to switch channels manually at the top of every program (I've added this cue to the shorts program and feature playlists for tomorrow evening but please double check this is working tomorrow morning) Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: Set up and tested mics in theaters 2 and 3 prior to the events (brought an additional mic stand down to theater 3 for the intro/Q&A and took both up to the 4/6 booth after the event + returned all mics to their charging ports) In Your Face shorts block and Summer's Camera screenings went smoothly (note: keep the audience awar...

Projection Close 10/12

To do this evening/ was completed: NewFest is on! We're off to an awesome start. I double checked the playlists for tomorrow. Please run through everything tomorrow, first thing in the morning, then I'm sure there will be another tech beforehand so that everyone's good. Reminder that I put the centre spots info in the event memos that need it. Be sure to test Spotify in the morning for posterity.  Presentation Issues: Preshow Clips/Playlist: Friendly reminder that I checked My Beautiful Launderette and built the playlist for this week. The lens/masking cue for 1.66 is sorted for T3.  Built the playlist for She's the He Also built the playlist for Josie and the Pussycats , but we still need the keys for it. Additionally, there's no mention of the NF logo slide at the end of the feature, so I've left it without. We'll double check with them before the date. The keys come in on the 17th!  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters ...

NPP Projection Report 10/11 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Both NewFest screenings went very well today! Heads up, they'll need a mic set up in Trees for most if not all of the days they're having screenings here. I left a stand in the storage closet. I re-exported the QMM slides because they were actually not the right size, they should look stretched on the computer so they look right when squeezed by the tube TVs in Trees. The T4T one I made was the right size (weird thing with the video software I was using where it squeezed the slides back to their original size after I stretched them with HandBrake, but the software allows you to resize which I figured out for T4T on Thursday night but I guess it didn't occur to me I'd have to redo QMM as well). I added the stretched T4T and QMM slideshow loops to Plex so we're good to go for this! Ordering/Receiving (posters & trailers): Ordering/Receiving (...

NPP Projection Close 10/10

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built all first run show playlists for the week of 10/17 with the exception of If I Had Legs I'd Kick You as we are still waiting on pre-show content for it from Kat  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): New Avatar: Fire and Ash  and  Zootopia 2 posters were delivered and stored behind 3/7 Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: Added new first runs to the dry erase board in 4/6

Projection Admin 10/10

To do this evening/ was completed: Matthew flipped the breaker back on for T1 (which is in 4/6 server station) for the PA speakers. I tested mics multiple times and they're definitely working and, more notably, rather  hot . For intros/Q&As, we can bring down the usual level for the mics (on the cp750) from 7.0 to 6.5 or 6.0, I reckon. I did not have the time to get the massive ladder out to adjust the actual speakers, but I think it's worth doing, just so everything's a little even keel.  I added the the Queer Media Mixer slideshow that Alec made to a folder on Plex (which looks great! I tested it!), but the T4T one (for some reason) did not export with the right size, so I'm exporting another one right now to the desktop named T4T_Mixer_133_5hrs. Not sure if it's actually 5hrs but it is certainly more than 3. In any case, it should (hopefully) be the right size. Should be done by late tonight.  Presentation Issues: Preshow Clips/Playlist: FYI - NF preroll loop...

NPP Projection Report 10/9 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons set up was a little hectic as the outlet which the speakers are plugged into was not giving any power. I briefly tried looking for the breaker to see if it had tripped but in the interest of time I just grabbed a power strip and extension cords and connected the speakers (plus the string lights for their tables) to the outlet by the masking motor. I looked around for the breaker after getting everything settled but did not see anything that looked tripped. I'll ask Matthew where the breaker for this is and, if it's not a tripped breaker, have Vlad come look at it. *Also, they like having the Yamaha mixer on the table with the spotlight controller and laptops. Can we make sure this is set with everything else during the day? Other than that, everything was in place which helped a lot with the tight turnaround. **One more thing: Michael mentioned the ...

Projection Admin 10/09

To do this evening/ was completed: Hey ya'll - just a friendly reminder that you gotta ingest the OV before a version file (VF). Frankenstein has been ingested completely.  Presentation Issues: Preshow Clips/Playlist: Techd all new A1 playlists.  Adjusted volume for the Casper trailer and 5min preshow Deadly Games (was a little loud).  Trailer Updates: Special Events/ AV set up:Yamaha, Wireless Mic Mixer, Aja, Spots Board all setup in T1. Aja with hdmi and spots board are resting on the table to the right with three mic stands ready to go.  Confirmed with Galen that the Gilead trailer we techd the other day is OCAP.  As for NF tomorrow, I'll be in early tomorrow to go through the All About The T playlist (double checking that the right VFs are in there - ignore the double of Purebread in there, that's intentional) as well as the New Voices playlist. I thought we had the ratios listed for the preshow/slides (most of which should be 1.78), so I'm also going to dou...

NPP Projection Close 10/8

To do this evening/ was completed: 10/10 playlists updated with 3.7 volume cues (welcome and feature).  Supernatural on the cart with the right shipping label attached. Beautiful Laundrette ingested to LMS and T3. Frankenstein ingested to LMS. New 35mm letters up on the marquee. Bones went smoothly. Mic and cable broken down afterward, mic stand in 4/6. Print has been put back on its shipping reels. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 10/8 Admin

To do this evening/ was completed:We're probably getting Bugonia on 35mm. I'm giving the platter in T1 some tests. So far so good. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ran loops for Bones and set up a mic for the intro. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested If I Had Legs I'd Kick You , After the Hunt , and regular 7.1 versions of House of Dynamite . The Atmos version was ingested for the latter. This would play fine, but since we're not an Atmos theater we should just ingest the regular 7.1 version. Ingested Josie and the Pussycats . I started transcoding My Beautiful Laundrette . Since this is a file we don't need to use MakeMKV, that's only for ripping blu-rays. I trimmed out the logos from the beginning with DCP-o-matic (a Criterion logo and a newly added MGM one) so we don't need to have the dowser closed at the start. Outgoing/Shipping (content): I delete...

NPP Projection Close 10/7

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set up for trivia at Trees Lounge this afternoon Supernatural intro and screening went smoothly, save for some fussing over the volume during the show as the mono soundtrack was either too low at its QC'd volume or too loud at anything above 10 on the 500 and 750. Lillian was texting about level changes during the show. I adjusted accordingly but the volume dial on the 750 is super finicky and will drop the volume way too low or way too high depending on how much force there is applied to it. I think moving forward we should simply split the difference on volume during techs considering how much these print screenings fill up (this one was part of the Pre-Code Parade series) Ordering/Receiving (posters & trailers): Additional Frankenstein  character posters were delivered and stored behind 3/7 Ordering/Receiving (content): Began running the Indiana Jones a...

NPP Projection Report 10/7 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built the playlists for A House of Dynamite CCAP, OCAP, and babies.  Trailer Updates: Special Events/ AV set up: Ran loops for Supernatural tonight. Changed the batteries in the spotlights in T6, since we'll need them for a NewFest screening. I grabbed the mic mixer from T7 and set it up in T6 for the NewFest screening, so we're all set with mics in each theater for NewFest. I also placed one mic stand behind/under the curtain in T2, T3, and T6 so they are in place for NewFest intros. T1 has the usual 3 stands we keep under there for Spoons. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ripping Indiana Jones and the Last Crusade in T1, please start the DCP tonight! Downloaded the file for My Beautiful Launderette , which also needs to be converted to DCP Ingested House of Dynamite into LMS Outgoing/Shipping (content): Black Dynamite was picked up Packed up Scream , ma...

NPP Projection Close 10/6

To do this evening/ was completed: Scream went smoothly, will go back on its shipping cores tomorrow. Cue sheets checked. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 10/06

To do this evening/ was completed: Had what was essentially our last major tech with NewFest today until we lock in the playlists (ros) with the rest of those folks including Monisha real soon. We looked over the program All About The T, New Voices, and received all assets whilst we were teching so I was able to ingest the rest of those (I already had the Gilead/ Land acknowledgement in there but now we've got all slides and the preshow roll (watched the entire preroll to make sure everything looked good to them/was accurate), and all we're waiting on now is an updated version of the NewFest 2025 trailer since the sponsor slide at the end of the trailer could be slightly improved. We also received another round of VF files to try out for All About The T since we the first updates we saw today had the subs a little too high for our liking, and luckily those next round came in whilst we were teching. The 1006 ones we'll use and I can build those playlists. The 1006 stands for...

NPP Projection Close 10/5

To do this evening/ was completed: Inspected Scooby Doo, on house reels, great conditon. Took down all brunch side letters and put up most of the NewFest letters that Desmond emailed about. The last line Tix Newfest.org still needs to go up. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Open 10/5

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Tech'd Videoheaven before the first round and added a house lights up cue at the start of the credits + set up chairs and mics at the front of the auditorium/tested spots Mr. Vampire  screening in theater 1 went smoothly + brought the mic back up to the booth and cleaned both projectors following the show Videoheaven screening went well as did the Q&A (which, admittedly, could have benefited from a longer gap between rounds for a longer discussion but, alas, the small crowd received the film well enough) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content):  Deleted Videoheaven from theater 3 to make space but left it on the LMS for the time being (I asked Cristina if we could potentially schedule a staff screening for it) Print/video Inspection: Put  Mr. Vampire  back on its shipping reels a...

Projection Close 10/04

To do this evening/ was completed: We still need the preshow that New Fest will be sending to us (likely a ads/spons slideshow to pair with the Spotify playlist) so I'll check in with them on Monday since we'll be meeting for tech. I downloaded and ingested the Gilead trailer. We're good on trailers now.  NF tech time has been updated to 11am on Monday.  Presentation Issues: NO issues in T2.  Preshow Clips/Playlist: Built A1 First Run playlists for 10/10. If you build a playlist, please remember to mark it with your initials.  Trailer Updates: Special Events/ AV set up: Checked the SE playlists for tomorrow.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection:  Asset tracking doc updated/checked?:  Maintenance/cleaning: No issues in theater 2, kept an eye on it throughout the night.  Cue sheets updated/checked (every shift): Yes. Updated Marquee updated?: Yes. Rearranged a...

NPP Projection Report 10/4 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The World Before Your Feet intro and Q&A went very nicely. Deleted the feature right after as T3 is tight on space with all the NewFest features currently loaded. Spoons went well. Thanks to Lillian for getting the mixers and mic receivers set. I chose to connect them to the T5 booth PC for theater controls which turned out to be a mistake as it booted them before the show started when the computer went to sleep, so I changed the sleep settings. Then during the show they were booted again and could not reconnect, so I gave them the T1 mac mini. They were not without control of house lights and volume for long. The mac mini is probably the most stable option for them, if its possible to give it up for the duration of their show, followed by the T6 PC. Other than this, there were no issues. Ordering/Receiving (posters & trailers): Ordering/Receiving (conten...

NPP Projection Close 10/3

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built show playlists for Roofman and saved them to the LMS Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received the live action Scooby-Doo print and brought it up to booth 1 Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: CC device was used during the final round in theater 3 and put back to charge

Projection Admin 10/03

To do this evening/ was completed: For tonight - Alec has the DCP of Scream uploading to the share folder, which should be fully copied over sometime tonight, so please keep an eye on it. This is for a private event on Monday! - L  Tech'd Anemone, Taylor Swift, Good Boy. Playlists are sorted! - Lillian  Inspected Scream, on house reels. Looked at Scream, Supernatural and Mr. Vampire, volumes logged. Presentation Issues: Preshow Clips/Playlist: Started building the playlists for 10/10 and finished up 10/03. We will not have a 10/10 playlist for Taylor Swift as we only have keys for the weekend. - Lillian  Trailer Updates: Special Events/ AV set up: To make Alec's life easier for Spoons tomorrow morning, I setup the yamaha and wireless mic mixer and the Aja/HDMI cable is on the table with the table cloth under the curtain, above the mixers. So really you'll just need the spots board brought down and the ethernet cable plugged in. Mic stands are still under the curtain. - Li...

NPP Projection Close 10/2

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Gotham Shorts program in theater 2 went smoothly -- as did the Spoons event in 1 save for a moment of worry about the mics which had lost some power and a minor overlap between the former ending and the latter beginning -- and all gear was returned to its storage following the shows Ordering/Receiving (posters & trailers): Received additional posters for Wicked: For Good  and new one sheets for A House of Dynamite , Good Boy , and The Mandalorian & Grogu  and stored them behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Took down letters for Him , The Roses , Spinal Tap 2 , and Weapons  to make room for Anemone ,  The Life of a Showgirl , and  The Smashing Machine...

Projection Admin 10/02

To do this evening/ was completed: I'll let Alec summarize the notes from Vlad/Gregg today, but we're all set in T2. Ran through a bunch of content (including the Gotham program for this evening). I updated Cristina throughout the day. - Lil Presentation Issues: Preshow Clips/Playlist: Updated all A1 and SE playlists for 10/03 with the new Forecast_A as per Kat's email today. - Lillian  Built the Bones playlist - Lil Tech'd  Trailer Updates: Special Events/ AV set up: Setup for Spoons in T1 - Yamaha, wireless mic mixer, spots board, Aja and mics with stands are all set and ready to go. Adapters in the bin if you need one, but you likely won't. Everything's been tested, including our laptop. Remember to make sure the breakers/power cables are on. - Lillian Whilst setting up the laptop in T3 for the menu change meeting, we discovered that the hdmi cable needed replacing (the one that goes directly in the projector/receiver). Alec will be ordering more heavy duty/...

NPP Projection Close 10/1

To do this evening/ was completed: Both Gotham programs went smoothly. Mics broken down afterward, three beneath the curtains. The two in 4/6 I sourced from T1 and T2. I brought the mic stands up to 4/6. Built Good Boy playlists and scheduled Anemone, Taylor Swift and Good Boy for the week. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 10/01 L

 To do this evening/ was completed: NO shows in T2 tonight.  Going to try to summarize the chaos of today, and we've all done a really great job of troubleshooting/communicating, so I'm super happy about that. We have DMS and Vlad coming in tomorrow morning (not sure what time yet, TBD, but definitely early). DMS will provide a new power cable for the projector in T2, which went down during first round for One Battle. We ran up to the booth only to discover that the unpleasant burning smell came from the fully burnt plug that damn near disintegrated in Alec's hands. Vlad will be scoping out the electrical outlet and system in there since this is obviously a more severe issue than just simply replacing the power cable. We moved both Gotham shorts into T3, rearranging other shows in T7/T1 to make sure we're still making a decent profit today and not disappointing our patrons. Everything is set up in theatre 3, all tested, Jack and I ran through the playlist for posterity ...