Posts

Showing posts from December, 2025

NPP Projection Report 12/20 Open

To do this evening/ was completed: 29th through Jan 1st still needs to be scheduled. Presentation Issues: Preshow Clips/Playlist: Built and scheduled Is This Thing On , Polar Express , When Harry Met Sally , and Back to the Future . There were 12/19 playlists, which have the  Marty  etc. trailers in them, scheduled on 12/24 and 25. I swapped those for the 12/26 versions. Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): I reached out to Deluxe about Is This Thing On?  since it wasn't showing up after scanning the FilmVault server. Deluxe was not showing a booking, but they checked with the studio who must've clarified that we do, indeed, have it booked. Content and keys came in shortly after. Feature ingested. Lego Batman  came in on a CRU drive, ingested to the LMS. Ingested Hell Up in Harlem to the LMS. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?...

NPP Projection Close 12/19

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Added shows to the LMS from 12/24-12/28 with the exception of Is This Thing On? and special events SPLs whose content we are still waiting on/need built Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Train Dreams and The Odyssey posters were delivered and stored behind 3/7 Ordering/Receiving (content): Checked the LMS and Deluxe FilmVault this evening but could not find any trace of feature content for Is This Thing On?  despite us receiving a release email from Deluxe two days ago. The pre-show content is ready for this SPL to be built. First shows are not until 12/24 so there is still time to get it ready. Pan's Labyrinth was delivered and brought up to booth 1 Outgoing/Shipping (content): Print/video Inspection: Finished inspecting Lost Highway Asset tracking doc updated/checked?: Maintenance/cleaning: The A/C unit in the 3/7 booth went down this afternoon. I...

Projection Admin 12/19

To do this evening/ was completed: A little last minute we swapped Sentimental Value into T1, made a few other changes. Luckily it finished ingesting in time. Presentation Issues: Preshow Clips/Playlist: Built weekend playlists and Angels Egg, transferred some preshow content.  Tech'd Arthur Christmas and It's a Wonderful Life Trailer Updates: Special Events/ AV set up: School screening went just fine this morning.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Brought the george ivan drive up to 4/6 and am copying Hell up in Harlem DCP to the Share drive We should be getting Flying Guillotine by Monday Outgoing/Shipping (content): Reached out to Malia and Michael at Block so we can circuit The Queen print to them.  Print/video Inspection: Started inspecting Lost Highway, which is in good condition.  Asset tracking doc updated/checked?: Maintenance/cleaning:  Cue sheets updated/checked (every shift): We did some swaps for the weekend...

NPP Projection Close 12/18

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Tech'd the light cues and music with Desmond and the performers prior to the pre-show. The actual performance went just fine save for a few moments where I had to toggle the wash lights and/or spots on and off for dramatic effect. This seemed to cause a malfunction specifically with the wash lights where a red wash got stuck on screen between transitions. I also did not realize no spaces between the performances were built into the show to allow for the host to intro the next performers so I paused/played and skipped ahead manually. Batman Returns  feature content played without any issue and all gear used was put back in storage after the show  Ordering/Receiving (posters & trailers): Disclosure Day teaser posters were delivered and stored behind 3/7 Ordering/Receiving (content): Lost Highway and The Face of Another prints were delivered this aftern...

Projection Admin 12/18

To do this evening/ was completed: The school screening for Avatar 3 has been confirmed for tomorrow morning. This has been scheduled on the LMS.  Presentation Issues: Preshow Clips/Playlist: I made the playlists for Arthur Christmas and It's a Wonderful Life.  Trailer Updates: Special Events/ AV set up: Setup the wireless mics (they mentioned needing 1 but I figured 2 might be better) for the Drag show tonight. Speakers are set, yamaha mixer, and I brought the wireless mic receiver into T2 and set the channels to the room. The mics are currently charging. Please remember to turn everything on before the show, including the front panels on the wireless mic mixer! Also, for the spots/washes needed, I wrote down the exact bank and scene combos on the event memo so you don't have to go looking for them on the sheet, though everything you need is there.  And, much to our relief, we got the keys for Batman Returns . I techd this  (a long with the new slides) and upda...

NPP Projection Close 12/17

To do this evening/ was completed: Built the rest of the 12/26 A1 playlists (excluding Is This Thing On?). Was not able to schedule 12/26 - 1/1. Cyberslime DCP ingested to LMS. Charlie and the Chocolate Factory went smoothly. Print packaged back up. Somehow the playlist seemingly unpaused itself during McKegg's intro and moved on to the trailer. I caught it immediately but it still caused a minor hiccup. Not sure how that happened. Right before this I did get the warning that the Shutdown playlist was about to start (as it automatically schedules itself five minutes after last playlist), but usually the current paused playlist doesn't move on to shutdown. Idk. T7 equipment broken down after event. Mics beneath screen. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: The private event in T7 went well. The Q&A ended up getting canceled, they did the intro and performance with no issues. New mic mixer arrived, I placed it in Theater 6 so...

Projection Admin 12/17 Lilian

To do this evening/ was completed: Staff Screenings have been posted to 7shifts, blocked on the Google calendar and scheduled on the LMS. - L Presentation Issues: Preshow Clips/Playlist: Updated all 12/19 PG playlists with the Hoppers trailer since we are no longer getting the Cat in the Hat. - L Trailer Updates: Special Events/ AV set up: Brought down the XLRs and mics for theatre 7 and setup for the event tonight. Three mics are ready to go, chairs are off to the side. You'll just need to take the spots remote down with ya. - L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The new set of keys for Sentimental Value were only for a few screening rooms, missing t6, which we need, so we have been issued new keys and they should show up by tonight. Update: they're in and ingesting!   It's a Wonderful Life will be delivered by tomorrow morning.  Ingested Arthur Christmas to the LMS.  Currently downloading the Cyberslime Shorts DCP to the des...

NPP Projection Close 12/16

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set up for trivia at Trees Lounge this evening and centered the projector so its image is flush with the screen Dark Angel screening went smoothly Ordering/Receiving (posters & trailers): Supergirl teaser posters were delivered and stored behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Put  Dark Angel back on its shipping reels after the show...this needs labels but can be scheduled to be returned tomorrow (note: last I checked there was still a can for King Kong on the cart) Asset tracking doc updated/checked?: Maintenance/cleaning:  Cue sheets updated/checked (every shift): Double checked the cues and schedule on the LMS Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: Amazon delivery addressed to Alec was delivered and brought...

NPP Projection Admin 12/16

To do this evening/ was completed: The January schedule is posted. Remember there are "mid" shifts scheduled regularly, every Monday-Thursday. Look over your schedule to see which you'll be responsible for. -Alec LMS scheduled for coming weeks except for Marty, Is This Thing On?, No Other Choice. Those DCPs aren't available yet. Loops ran for tonight, all set. Packed up Mercenaries from HK and Red Rocket. Both prints are scheduled for pick up this afternoon. King Kong can was picked up earlier today. When Harry Met Sally and Back to the Future ingested to LMS. 12/26 trailer packs made, started building 12/26 playlists. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Jared dropped off a DVD he wanted on the Plex for his Trees event tomorrow. I ripped it and added it to the Plex. It's in its own folder, "Jared Event 12/17." The title is Point and Shoot . School screening went well this morning. Ordering/Receiving (p...

NPP Projection Close 12/15

To do this evening/ was completed: Red Rocket print went smoothly. Packaged up afterward. Took the letters off the marquee afterward, put up Pan's Labyrinth. As far as I know, Jared did not come by tonight with the film he's supposed to bring us. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Open (Lillian/Will)

To do this evening/ was completed: Ran a reel of Red Rocket, including loops, to set the projectors up for tonight in T4. Volume at 7.0 (which is on the white card, though I told Jack he might want to raise it depending on the body count). Please remember to open the vents when running film. - L Presentation Issues: Preshow Clips/Playlist: Built the final playlist for Batman Returns. Desmond reached out with a change today, which is that there's no donations slide, only tips, which we now have two DCPs for (they just want the curtain call music and cool cat songs for the tips slide). Ingested new DCP and took a look at the Vigor Mortis V2. - L Built and scheduled school screenings for this week (but not Friday's as Chenelle has yet to confirm whether they're actually going through with it). - L FYI- Jared reached out about us putting a film up on Plex for him to play during his event in Trees on Wednesday. He will either drop this off tonight or tomorrow. - L Trailer Update...

NPP Projection Open 12/14

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Elf played in theater 2 to a large crowd this morning...volume needed a slight boost but overall the screening went well  Double checked  Christmas Vacation  for the private event and revised the pre-show since the same all ages 40min segment was looped...the feature played without any issues Ran loops ahead of Sundays on Fire in theater 1... Mercenaries from Hong Kong was very pink and purple throughout but otherwise the screening went super smoothly Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Placed  Mercenaries from Hong Kong back on its shipping reels Cristina asked that we tech a reel from Red Rocket tomorrow morning as she will be at Williamsburg and unable to make it over to look at the film Asset tracking doc updated/checked?: Maintenance/cleaning: C...

Projection Close 12/13

To do this evening/ was completed: No issues this evening. Kept an eye on T5 to check in on the lamp's performance.  Checked in on all houses. Caught up on some admin work.  Presentation Issues: Preshow Clips/Playlist: Double checked the playlists and trailer volumes.  Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Friendly reminder (if you're looking ahead on the LMS) that the keys for Meaning of Life come in tomorrow and won't open until the day of, early morning.  Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes. Initialed.  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 12/13 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Elf and Shop Around the Corner played nicely to full houses. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Duplicate Red Rocket can was picked up by FedEx. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Ordered some cleaning supplies we're almost out of. The lamp in T5 still looks perfectly fine. It's very close to reaching warranty hours. If I got the math right, we'll get the warning on Monday night. I'll change it on Tuesday. The new bulb changer arrived. It's in 3/7 with the marquee pole. Cue sheets updated/checked (every shift): Filled out timing for Meaning of Life and Red Rocket . Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: I uploaded the Christmas Vacation DCP to Go...

NPP Projection Close 12/12

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Spent the evening inspecting Red Rocket in 4/6...this is a mint condition print and with the exception of perforation scratches throughout it looks largely untouched Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Removed King Kong from the 35mm side and replaced it with letters for Charlie & the Chocolate Factory + adjusted Wake Up Dead Man on the front marquee Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 12/12

To do this evening/ was completed: Both King Kong prints packaged up, they came with Fedex Ground labels, so I scheduled a pickup for Monday and will the cans down Sunday night. Charlie on house reels. Looked at the first reel of Dark Angel with Cristina. No soundtrack type listed on inspection/leaders, so we switched back and forth with A and SR. It is Dolby A. Volume logged. 12/19 and 26 preshow content ingested. Built 12/19 playlists (excluding Marty and Is This Thing On?). ** Most PG-13 and R playlists need the NewYearNewMe trailer, which will not be available until 12/15, so we'll have to update these playlists then FYI.** Running Man letters/posters down. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Checked Elf and Shop Around the Corner and updated playlists. Set 1.37 masking in T3. Looked at the content for the T7 private event on the 17th. Also had to set masking for this to 1.37. I used the preset corresponding to the 1.66 cue...

NPP Projection Close 12/11

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: King Kong screening went perfectly...mint condition picture and loud and overwhelming sound...the print is back beneath the workbench, tails out, and can be put back on shipping reels tomorrow Ordering/Receiving (posters & trailers):  Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: Jeremy borrowed a power strip from 4/6 for the private event at Trees...I told him to leave this in the mezzanine closet for future use since the kitchen power strip was on the fritz

Projection Admin 12/11

To do this evening/ was completed: Alec and Matthew and I had a little 70mm meeting. Things are in motion...stay tuned.  Note: We lose Running Man tomorrow!  Presentation Issues: Preshow Clips/Playlist: Scheduled weekend SE shows on the LMS. Deleted old playlists/content from LMS/IMS. - L Ingested the DCPs (custom preshow and a feature) for the private event on 12/17 and built a rudimentary playlist. I'll be running this one so I'll look at it tomorrow and add cues. Trailer Updates: Went through all playlists for 12/12 to check trailer volumes after logging some new/holiday trailers. Trailer info is now also on the whiteboard above the computer in 4/6. - L Special Events/ AV set up: Cure feature all set for this evening - L Ran loops for King Kong tonight. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Reached out for a tracking number for the can of reels 1 - 3 of Red Rocket which should be here by Friday! - L  DCP'd and ingested the slide...

NPP Projection Close 12/10

To do this evening/ was completed: Dance Freak Q&A went smoothly, mics back in the booth. Trees mic back in storage closet. New 35mm letters up on the marquee. Built playlists for The Cure, Christmas Vacation  and Dark Angel, the last of which still needs intro slide FYI. Avatar feature ingested to LMS. **Chenelle notified me that someone from the media at the event left behind an XLR cable. It's resting on the side table in 4/6 booth right now. Chenelle said she'd mention it to the event reps in a follow up email.** Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 12/10

To do this evening/ was completed: Brad Lander formally announcing he's running for congress at our establishment was not on my 2025 bingo card, but what a fun last minute shindig! I set up a mic and a stand, which turned into the hub for all press mics and it held well. Gaffed everything down for safety. Earlier in the day they sent what we thought was a slideshow but is actually a folder of photos, so I turned it into a slideshow video and uploaded it to Plex, which worked out great. I stood right by the AV box so I could adjust levels for the speakers and all the speeches went super well. Bar managers, Raekwon and Chenelle and I communicated very well throughout the night. Guests are still partying in the bar, but our work is essentially done. Jack will clean up the mic since I have stayed past my out time and the main event is over.  Presentation Issues: Preshow Clips/Playlist: Built some SE playlists.  Trailer Updates: Leaving myself a note here to take a look at new/holi...

NPP Projection Close 12/9

To do this evening/ was completed: Presentation Issues: No further issues with content playback in theater 3 this evening Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Jess asked about testing a slideshow for tomorrow's private event...I was not tagged in these emails and can not find the content...she said she would tag Lillian to take a look tomorrow morning and to have the slideshow uploaded to Plex at Trees Million Dollar Legs  intro, short film, and feature screening in theater 1 went very smoothly...both projectors were cleaned following the show and the mics were returned to the booth to charge Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Red Rocket  print was delivered in two canisters this evening and brought up to 4/6 for Monday night's screening Outgoing/Shipping (content): Print/video Inspection: Put Million Dollar Legs back on its shipping reels and packaged it for a return shipment (the canister is at the foot o...

NPP Projection Admin 12/9

To do this evening/ was completed: LMS scheduled for the coming week (not including Avatar, Spongebob, Housemaid, The Cure).  Reached out to Deluxe for new keys for Pig. The ones we received were for Theater 2 only--look out for follow up to that. Ran a reel of Mercenaries from Hong Kong for Cristina, volume logged. The bottom of the screen looked like the scope plate needed to be filed a bit more--not sure if that was the print or indeed the plate. Double-checked today's cue sheets. Outgoing CRU drives dropped off at Ballard (UPS). Presentation Issues: Theater 3 crapped out on us right before Sentimental Value started. I guess it realized I haven't had a turn to go through that insanity, so hurray for me. I was able to reboot it and getting back up and running, though it cut into the preshow for the next round.  Preshow Clips/Playlist: Made two slides for Charlie and the Chocolate Factory during the intro and added them into the playlist.  Trailer Updates: Special Even...

Projection Close 12/8

To do this evening/ was completed: Back from visiting family. Thank you for the coverage! During the last round in T5, a woman fell and the poor thing hit her head pretty hard. Immediately brought the lights up upon hearing Shay's request and we cancelled the screening, of course. MOD called an ambulance and I assisted with cleanup.  Presentation Issues: Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: The private event was a little tricky tonight, but was fine overall. The director and PR folks gave us a bit of grief as they sprung an intro on us last minute and asked for there to be no house lights up cue in the playlist for credits (both of which were a wee bit annoying but also totally fine as we were only two minutes into preshow and I was able to eject and update the playlist before anyone came in) but then they had us hold for five minutes, which would have been okay but we already had a bit of a tight turnaround for the Q&A before the next round...

NPP Projection Report 12/8 Admin

To do this evening/ was completed: Heads up the Red Rocket print is scheduled for delivery tomorrow. Tracking is in the asset doc. Presentation Issues: Preshow Clips/Playlist: Got the Dance Freak slide for Wednesday, added it to the playlist. FYI - the slide is 1.50:1 like the feature, so I have the masking going to 1.50 ("Bugonia Masking") for the intro and staying that way for the feature and Q&A. Trailer Updates: Special Events/ AV set up: Checked volume/credits on Life of Brian , playlist all set for tonight. Set up director chairs and mics in T6 for the 2000 Meters Q&A tonight. This just got added today. Cue sheet also updated and their holding slide is in the playlist. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The WB holiday drive (actually) came today. Ingested Elf and Polar Express to the LMS. Outgoing/Shipping (content): There are some CRU drives which can get taken to the UPS dropoff tomorrow. Print/video Inspection: Ass...

NPP Projection Report 12/7 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Double Q&A duty went about as smoothly as it could have--meaning no issues just a lot of hustling. All equipment has been broken down/put away and all chairs are back in the hallway. Brazil played well in T2, just bumped the volume to 5.8 at the beginning. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the Christmas Vacation DCP to the LMS. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Letters are out for next week's brunch titles, please change them tonight. Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 12/6

To do this evening/ was completed: Inspected reels 4-6 of the second King Kong print. They're in similarly great condition. On house reels. Tomorrow's cue sheets checked. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 12/6 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons setup and breakdown was super smooth. Everything's been put away. During the show, Michael lost the Splashtop connection and was confused about which computer to reconnect to, so was unable to control house lights for a moment. I was radioed and this was quickly resolved. No other issues. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The replacement King Kong print arrived. Since there's no update from FedEx about delivery of the second can from the other print (they located the can but the tracking hasn't been updated), we should inspect reels 4-6 of this new print so we're ready to go for the show. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Was radioed about the Trees projector shutting off again, when I went down there I noticed the red ...

NPP Projection Report 12/5 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built  Red Rocket , Sundays on Fire,  Shop Around the Corner ,  Meaning of Life , and  Charlie and the Chocolate Factory  playlists Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We received an empty box which was supposed to have the WB Holiday Combo drive inside. This has Elf and The Polar Express which we're showing this month (former on the weekend of the 13th and the latter on the 26th). I reached out to Deluxe and they're sending it again. We got a blu-ray of Christmas Vacation for a private event on the 14th. Ripped it and started converting to DCP. Outgoing/Shipping (content): Cleaned up the share folder and theater servers/LMS. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning ...

NPP Projection Admin 12/5

To do this evening/ was completed: Ingested new preshow content and built A1 12/12 playlists. Inspected reels 1-3 and 7-9 of King Kong, print is in excellent condition. On house reels. "Now Showing" snipe up for Dead Man Wake Up. Looked at Brazil in T3 and updated volume to 6.0. Did not look at it in T2. Tech'd Million Dollar Legs, Christmas Story and Dance Freak with Cristina. Volumes logged. T6 IMS was down when I got in. Simple power-cycle brought back connectivity. Pig CRU drive arrived, ingested to LMS and T6.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 12/4

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Spoons set up was a breeze...organized all the gear after the show and left everything on the table covered for Saturday's brunch show (mics are back in the booth charging...wires beneath the table are a bit of a mess as usual but I've organized the mic mixer cables and tucked the AJA away as tidily as possible) The Wild Goose Lake played in theater 6 with no issues Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Pig feature DCP content was delivered but is not yet visible on the Deluxe FilmVault Outgoing/Shipping (content):  Print/video Inspection:  Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked tomorrow's cue sheets and schedule Marquee updated?: Added letters for Wake Up Dead Man to the front Posters updated?: Cleaning lights on for the night?: Yes Projec...

NPP Projection Report 12/4 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled the Alabama Solution and 2000 Meters playlists. Trailer Updates: Special Events/ AV set up: Set up everything for Spoons in T1 tonight. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The DCP tech error was with Relic , which shows at Williamsburg, not Pig . We haven't received any update on Pig . Outgoing/Shipping (content): Print/video Inspection: Looked at Wake Up Dead Man , lowered volume to 5.0 in the playlists. Also looked at a bunch of special event content: Familiar Touch , Dance Freak , 2000 Meters , and The Alabama Solution . Wild Goose Lake  was looked at on Monday according to the blog, but I'm not sure what happened because there was no lights up cue for credits in the playlist and also the credit start time in the cue sheet was pretty off. All this was updated. Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated...

NPP Projection Close 12/3

To do this evening/ was completed: FOFIF went smoothly, mics back in the booth. Trees mic back in storage. Ingested The Cure feature. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 12/3

To do this evening/ was completed: Staff Screening info was sent out via 7shifts as per new rules, though I did send a follow up email so that folks are aware of this change.  Presentation Issues: Preshow Clips/Playlist: Adjusted the Knives Out playlists with the correct preshow. Built and scheduled staff screening playlists.  Trailer Updates: Special Events/ AV set up: FOFIF show is all set for tonight. The Wifi in the booth tends to be extremely spotty up there, so I'd recommend using the laptop for preshow music. I tried both the PC and laptop today and both are fine. Leave the volume around 3.7. The Spotify playlist is pulled up on the laptop already (in the app). For spots, you can use either 301, 502, or both. The 301 setting has the double spots a little closer (good for an intro, I reckon) whereas the 502 have them a little further apart (good for q&a).  Note: I setup a mic in Trees for the announcements after the show. It has been tested, just remember to tu...

NPP Projection Close 12/2

To do this evening/ was completed: A busy night made easier by having Alec take care of the private event in Theater 7. It made things all the easier and I appreciate it.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Private event in T7 went well. There was a holding slide swap, we got a new one yesterday. The old one was in the playlist. I put the slide up before doors and Chenelle radioed me that it was the wrong slide. McKegg quickly converted the new one and I updated the playlist. Totally smooth sailing otherwise. Nightmare on Elm Street 4 flew by. We had a lovely little pre-screening Q+A with a smooth transition into the feature. All changeovers, framing, and focus were on point.  Trivia setup was also a breeze. Everything is broken down and put away.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Packed up Nightmare on Elm Street 4 .  Print/video Inspection: ...

NPP Projection Admin 12/2

To do this evening/ was completed: Birdcage screening went smoothly. Set up mics and Spotify sound for T7 event tonight. Wanted to look at the feature DCP but the keys don't go live until 5pm. We had another set of keys that were active yesterday but guess the tech was overlooked, so check it out in between rounds this evening. Wake Up Dead Man playlists built with Generic preshow as placeholder--emailed Kat. LMS scheduled for the coming week. Ingested the V2 DCP of Bloom and put it on screen. Looks and sounds good. Made a playlist for tomorrow's FOFIF. Also looked at the FOFIF preshow, looks fine.  We should be receiving a few DCPs from Deluxe in the next day or two for a private screening on 12/7, The Alabama Solution, heads up. Update: Deluxe has uploaded it, ingested. Swept booth 5. Playlists built for Million Dollar Legs and Dance Freak. Dance Freak does not have its slides yet FYI. Nightmare playlist updated with slide. Presentation Issues: Preshow Clips/Playlist: Trailer...

NPP Projection Close 12/1

To do this evening/ was completed: Built a playlist for Predators and transferred the feature to T7, will look at this tomorrow. NoBudge went smoothly, mics back in T1. Had to reconfigure T3 Blu-Ray Flat channel for tomorrow's Birdcage screening: the projector HDMI cable was not connected to the rack PC, the display settings weren't set to mirrored and the Color Space setting in the Channel Setup was set to "full range" instead of Color RBG, which caused a weird kind of thermal look. Fixed all of that and tested the film on screen, looks and sounds good. Five Nights Freddy ingested to LMS. FOFIF preshow ingested to LMS.   Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?...

Projection Admin 12/1

To do this evening/ was completed: Happy December, everyone!  For tomorrow morning - John and co would like to stream  The Birdcage (1996) tomorrow morning for a future film feast. We weren't looped into this until the afternoon today, but it should be a problem at all. It is available on Prime Video, which I am logged into in T3. I currently have the film downloading on the off chance our connection is spotty tomorrow morning. I'll make sure Jack is aware and I asked John if we could move the screening from 10am to 10:15 so he has a moment to make sure everything is ready. - L Presentation Issues: Preshow Clips/Playlist: Looked at Wild Goose Lake  I tech'd the FOFIF shorts and slide with Desmond, but since all of those slides are for preshow, I made a 30 minute slideshow of them, in the correct order, so that we don't have to keep looping the slides (which would be rather annoying). This is transcoding in 4/6 and should be done in less than 2 hours. Please do not remo...

NPP Projection Close 11/30

To do this evening/ was completed: Transferred all FOFIF shorts to T2. Downloaded and ingested all FOFIF slides and ingested to LMS/T2. The slides are labeled with the number attached to the png files that Desmond sent over. So Slide1.png is FOFIFSLIDE1 as a DCP. Double-checked the NoBudge playlist. Marquee rental letters still up--rain most of the evening. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: