Posts

Showing posts from March, 2026

NPP Projection Close 3/31

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled a private event show playlist for Dirty Dancing on 4/2 in theater 6 (this will need to be tech'd for a lights up cue at the start of the credits)  Trailer Updates: Special Events/ AV set up:  Stranger by the Lake  played without issue this evening in theater 2 (I lowered the volume slightly since it was very loud even at 4.2) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Dirty Dancing  DCP conversion finished this evening so I began transferring it to theater 6 Began converting Cecil B. Demented to DCP (and saved it to the George Ivan drive) before leaving for the night Outgoing/Shipping (content): Removed  Stranger by the Lake from the LMS and server 2 after its screening concluded Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/sched...

NPP Projection Admin 3/31

To do this evening/ was completed: LMS scheduled for the coming week except for Fantasy Life, feature hasn't come in yet. Dirty Dancing still going in T1. Woman Chaser and Mubi_April ingested to LMS. Gowanus Current downloading to Share drive. T5 and 3/7 booths vacuumed. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ripped the Blu-Ray of Cecil B. Demented for conversion, but it still needs to go through DCP-o-Matic.  Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Next week's cue sheets are set except for timing for Dead Lover and Fantasy Life .  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 3/30

To do this evening/ was completed: School Screening in T3 went very well this morning, started it up early, but just a friendly reminder - if you tech something the night before its show date (let alone first thing in morning), at the very least please log volume and/or build a playlist. I was in early so it wasn't much of an issue, but it helps to have this sorted beforehand. Also, special screener of The Drama for Jared and Lauren went just fine, too. Feature seems kind of low, volume wise, but once it opens up in other screening rooms this week, I'll take another look and adjust as needed. - LH Presentation Issues: Preshow Clips/Playlist: Built the playlist for Revelations of Divine Love . Tech'd Stranger by the Lake and noticed it wasn't scheduled on the LMS yet, so I scheduled it and transferred preshow content and the feature to T2. Feature has now been techd along with the Be Gay Do Crime preshow. Made a slight adjustment to the cue sheets - LH  We can't quit...

NPP Projection Close 3/29

To do this evening/ was completed: New brunch letters up, took down 35mm as well. Ingested 13 Going on 30 to LMS and T3. Put it on screen at end of the night, good to go. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 3/29

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Lowered the feature volume for all  They Will Kill You  show playlists from 6.0 to 5.0 Trailer Updates: Special Events/ AV set up: Double checked Stand By Me before the first round and raised its feature volume +  Pieces of April screening went very well this afternoon. No issues with bulb brightness or flicker with projector 2. Power sources are holding strong Ordering/Receiving (posters & trailers): Ordering/Receiving (content): DCP-o-matic was running much slower than  usual this morning. There are 2 hours remaining for 13 Going on 30 to finish copying to DCP (please check on this and ingest to theater 3 once it is finished later this afternoon) Outgoing/Shipping (content): Print/video Inspection: Put  Pieces of April  back on its shipping reels after the show and cleaned both projectors in booth 4 Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets upda...

Projection Close 3/28

To do this evening/ was completed: We had no issues in T3 for the rest of the evening. Periodically checked in on the screening room/projector.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: 13 Going on 30 is still transcoding in T1, but it is very close to finishing up. Please ingest in the morning. Thanks!  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Waiting on the NSF24 preshow content. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Took out the trash in 4/6, swept in T1.  Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 3/28 Open

To do this evening/ was completed: Presentation Issues: T3 server went down during preshow for the second round Hoppers . I refreshed the IMS page and got the 404 error pretty much simultaneously with the call from MOD that the volume hadn't changed for the trailers. I killed the lamp right away, power cycled, then just started the movie once everything was back on. This delayed the movie 6 minutes in total, causing a manual start for the next round. Preshow Clips/Playlist: Scheduled Super Mario and Drama shows. The Drama DCP is transferred to Theater 4 for the Monday viewing. Trailer Updates: Special Events/ AV set up: Pieces of April went well. No brightness issues with either projector. The print is rewound for tomorrow. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): The version of Dead Lover ingested last night was a VF with the closed captions only, the OV still needed to be ingested which I did this morning. All good now. Outgoing/Shipping (co...

NPP Projection Close 3/27

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Even more posters for The Drama  and new one sheets for The Forgotten Island  were delivered and stored behind 3/7 **I am leaving a Super Mario Galaxy poster in 4/6 for Larissa (bartender from NWB) who will be coming by 4/1 with her son to see the film** Ordering/Receiving (content): Began converting 13 Going on 30  to DCP for its private event screening and saved the files to the George Ivan drive in booth 1 Dead Lover DCP finished downloading to the shared drive. Unzipped and ingested to the LMS. Built a show playlist for this as well but according to the LMS the "CPL is corrupt"(?)...please double check this when possible Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Collected the blu-rays lying around the booths and organized them on the...

NPP Projection Admin 3/27

To do this evening/ was completed: Ingested new forecasts and preshow content. A1 playlists and some SE playlists have been made. Swordfish back on shipping reels, can get scheduled Sunday night. New Bent ingested. Marquee first-runs updated. Presentation Issues: Preshow Clips/Playlist: Tech'd Stand By Me for this weekend - playlist updated! - LH Trailer Updates: Special Events/ AV set up:  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Chenelle uber connected us a bunch of Blurays. There are 2 for Monday (one will be Wizard of Oz, another will be 13 Going on 30. Wizard is ripping in T1 - please DCP this as soon as it is done! Thank you!) the next BluRay is for a private event further out (all of these have the dates on them) which is Dirty Dancing. We need to prioritize the first two for Monday. I can start on the second one tomorrow. - LH  UPDATE - Chenelle just informed us it'll just be 13 Going on 30. Will is aware.  One more note! We also ...

NPP Projection Close 3/26

To do this evening/ was completed: Presentation Issues: At the start of the feature during the second round in theater 1 ( Project Hail Mary at 5:45PM) the masking began covering the screen instead of opening to its 2:1 setting. MODs called and I manually triggered the 2:1 cue, fortunately only a minute or so had passed, and the curtains moved to the correct position. I double checked the playlists and there were no missing or incorrect cues. It looked like the curtains had moved in over the image too, not even staying at 1.85 like during the pre show, but had changed to a narrower setting. This film plays in theater 2 next so I will keep an eye on it then to see if its masking is affected as well and update accordingly (update: no issue with the masking in theater 2) Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ran loops in 1 for the  Swordfish  screening this evening + brought a chair and mic stand down and checked the spots in 7 for the private event ...

Projection Admin 3/26

To do this evening/ was completed: Ingested all of the Snowy Bing Bong Shorts and transferred them to T1 since we'll tech them with Cristina tomorrow. I also downloaded and ingested the new version of the short  Bent  for NSF26 so we can take a look at that tomorrow as well.  Presentation Issues: Preshow Clips/Playlist: Built the playlists for The Drama Trailer Updates: Special Events/ AV set up: Setup a mic and ran through the playlist for the private event tonight in T7.  Ran loops for Swordfish this evening. All set!  Received the keys for Stand By Me , which open up tomorrow!  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested lots of new content today via both the Share folder and preshows/trailers drive since Kat was having a bit of a tough time with the folder. Following content has been ingested:  New welcome/features HN_20 Marriage preshow 25min, 15min, 5min The Christophers trailer Policy_SciFi_5.1 HowToOrder...

NPP Projection Close 3/25

To do this evening/ was completed: Finished converting Bing Bong shorts to DCP. Did not ingest. Revelations and Mr. Nobody ingested to LMS. Downloaded BeGay and SuperMarioBros preshow pieces but all of them took a long time so I couldn't make a playlist for Stranger by the Lake. ( Made new folders: BeGay5min instead of PS_SE...). Do The Right Thing went well, mic back in the booth. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 3/25 Admin

To do this evening/ was completed: Ingest Mr. Nobody Against Putin and Revelations of Divine Love . Convert Snowy Bing Bongs to DCP. Build and schedule the Stranger By The Lake  and Super Mario Galaxy playlists when their preshows are downloaded/ingested. For tomorrow/Friday: They Will Kill You has a 2.20:1 aspect ratio in the standard flat container. -Nothing we haven't dealt with before, but we're going to have to reset masking presets as we adjusted them for Undertone's 2.12:1 aspect ratio. -I think we should just set the 2.20 masking presets (and Variable Ratio in 3 and 7) back to the true 2.20 and present Undertone (which is probably close to leaving us anyway) in this masking, so there will be some black on the sides for the remaining  Undertone shows. -I already set the Variable Ratio preset to 2.20 in T3 since I put the They Will Kill You staff screening in there tomorrow. Presentation Issues: Cleaning lights didn't go off at the start of the first presho...

NPP Projection Close 3/24

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled show playlists for Stand By Me (will need to be techd for credits timing) and Pieces of April  on 3/28 and 3/29 in addition to an infants show for The AI Doc  on 3/31 Trailer Updates: Special Events/ AV set up: Brought down two chairs and checked spots for the event in 3 +  Dead Pigs  intro, screening, and Q&A this evening went smoothly Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/schedule for tomorrow and updated credits timing for Pieces of April this weekend Marquee updated?: Posters updated?: One sheets for a James Cameron directed Billie Eilish music doc titled Hit Me Hard and Soft: The Tour (Live in 3D) ...because of course it is...were delivered an...

NPP Projection Admin 3/24

We should be getting The Drama through Deluxe tonight, which the cinema team will we watching in Theater 3 tomorrow morning. Please prioritize ingesting this when it comes through. We've been asked to put "No Kings" up on the marquee for another march on Saturday. We'll coordinate, just putting this on your radar. To do this evening/ was completed: Two mics set in T3 for tonight. Went through all Matinee II shorts except for Bent, which we will be receiving a new DCP/file for. All looks and sounds good. Still waiting on They Will Kill You feature upload. Playlists/scheduling can happen after that. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Man Who Shot Liberty Valance return label attached and the print is on the cart. Pickup scheduled for tomorrow. Print/video Inspection: Teched End Gaged for the Thursday private even...

NPP Projection Close 3/23

To do this evening/ was completed: Quiet night. Built almost all A1 3/27 playlists. Scheduled LMS for coming week. Cue sheets checked. Matinee II shorts transferred to T1 for tech tomorrow. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 3/23

To do this evening/ was completed: This morning I changed the lamp in T6 since it was time. Cleaned the lamp house whilst it was vacant. New lamp is nice and bright, no issues. Swapped the power sources and ran many image tests in T4 for analog as per my discussion with Alec yesterday after going over the issues with Projector 2. I sent the rundown to Roger, Alec and Matthew. While everything is, at the moment, visually stable, there is still a bit of a mystery issue with Projector 2 that we need to weed out. We will keep you updated. - LH Ran house checks this morning in all theaters except 6 as Lillian was busy completing maintenance on its projector -WB Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Double checked the show playlist for  The Headless Woman in theater 4 for this evening's show and lowered the feature volume/added a house lights up cue -WB Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Just a fr...

NPP Projection Admin 3/22

To do this evening/ was completed: Presentation Issues: Ran into the same issue today that Alec experienced yesterday morning during The Man Who Shot Liberty Valance as the power source to projector 2 in theater four was acting up. Halfway through the first reel of the print the bulb began to flicker violently, raising and lowering the brightness of the picture on screen quite quickly, causing a stir in the crowd as it was more noticeable than usual. Fortunately Alec was watching the film and graciously came up to the booth to assess the problem as I switched to the second reel. He tried disconnecting  and reconnecting a few things from the machine but nothing alleviated the issue of the lack of consistent amperage/voltage powering the bulb. Ultimately we ran the print off the functional projector after asking Wyatt to make an announcement to the guests and the show ran smoothly albeit with minor interruptions between each reel.  Preshow Clips/Playlist: The Headless Woman ...

Projection Close 3/21

To do this evening/ was completed: The event in Trees went well! Video stalled twice, but got it to stable out.  Presentation Issues: No issues in the screening rooms. Made the rounds.  Preshow Clips/Playlist: Got volume complaints in T7 for preshow/trailers, (just for The Bride) but all playlists in there and in general are the correct volume and nothing seemed out of the ordinary when I went down there, but then again, my ears might be a little busted.  Trailer Updates: Special Events/ AV set up: Matthew brought in an Art House Cinema week poster, which I put up in the lobby. We'll keep it til the week is through.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the DCP for the private event on 3/26.  Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes.  Marquee updated?: Added birthday letters to the brunch marquee...

NPP Projection Report 3/21 Open

Bit of a long one but everything was pretty smooth today! To do this evening/ was completed: End credits time for Labyrinth was an entire hour off on the cue sheet. I fixed it for tomorrow, but come on, guys... isn't this why we check them the night before? FYI - I took the damper out of the exhaust duct for P2 in T4, so it can't be closed at the moment. There's a piece that's loose on it which makes it close partially when exposed to airflow from above, which is what I thought had been the cause of the occasional problem where the lamp brightness dips (more on that below). I put some glue on it which is drying on top of the lens cabinet in 4/6, please don't touch. Thanks! Presentation Issues: Cleaning lights didn't go down in T2 when preshow for Labyrinth started. The normal show start pack was in the playlist so they should've. I hit the lights up cue from the booth to make sure the lighting automations were working, and it worked. Lighting cues worked ...

NPP Projection Close 3/20

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled an infants show playlist for Reminders of Him  on 3/24 Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Swept booths 4/6 + oganized the poster cubby behind 3/7 and added new first run one sheets to the archive tube Cue sheets updated/checked (every shift): Double checked all cues against the schedule and initialed for confirmation Marquee updated?: Posters updated?: Replaced the character poster for The Drama in the lobby with one featuring both actors Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Updated the special events dry erase board in 4/6 with 35mm and digital titles through the end of next month

NPP Projection Admin 3/20

To do this evening/ was completed: Tech'd NoBudge NSF program. Shorts look good, aspect/volume listed on the tech sheet. Labyrinth good to go this weekend. Presentation Issues: Preshow Clips/Playlist: We will receive the new forecasts on Monday - I'll be on the lookout for them then. - LH Trailer Updates: Double checked to make sure all trailer volumes are correct in the playlists. - LH Special Events/ AV set up: We are still waiting on the content for the private event on 3/26, but Chenelle is bumping them to make sure it gets out soon. - LH Answered some q's about a DCP for a potential screening. - LH Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Waiting on Sony to pickup Riding in Cars With Boys. Alec emailed them. - LH Print/video Inspection: Ran Liberty Vance for Cristina, which looks great! Volume logged.- LH  Asset tracking doc updated/checked?: Maintenance/cleaning: Tried to revive the third TV (this is the o...

NPP Projection Close 3/19

To do this evening/ was completed: Presentation Issues: Guests complained trailers were too low ahead of Undertone  (final round in 3) and they were in fact not at the normal volume as no 4.0 cue was added/it had been removed. I added it back to the top of the trailers and saved and synced it for the rest of the week. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers):  Ordering/Receiving (content): Outgoing/Shipping (content): Riding in Cars with Boys was left on the cart Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked, cross referenced, and initialed Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes: Last round in theater 7 had no tickets sold and was ended early

Projection Admin 3/19

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: As per Kat's request today, I've updated all A1 (and some rep) playlists with the necessary content - Art House Cinema slide/trailer. Scheduled playlists on LMS. - LH Trailer Updates: Special Events/ AV set up: Ingested the last few shorts for the NoBudge program to T1 for tech. - LH Made a four hour long loop of the Goldie video for Trees this weekend. Added it to Plex. I'll check this out tomorrow morning. - LH ' Man Who Shot Liberty Valance is on house reels for this weekend. Ordering/Receiving (posters & trailers): Ordering/Receiving (content):  Received keys for Labyrinth, keys for Do the Right Thing come in on the 24th. Reached out for Good Luck keys since they'd expire by tomorrow. Keys have since been released. Ingested AI Doc trailer, Art House Cinema week slide and trailer. - LH Outgoing/Shipping (content): Scheduled another pickup for Creed (which has been picked up by Fe...

NPP Projection Close 3/18

To do this evening/ was completed: Jaws went smoothly, mic back in booth. Inspected reels 1 and 2 of Pieces of April. Built playlists for Liberty Valance, Headless Woman, Swordfish. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 3/18

To do this evening/ was completed: Staff screenings have been built, blocked and scheduled. Tomorrow morning, when the keys open up, we will double check the aspect ratio and masking for Project Hail Mary and make any adjustments necessary.  Presentation Issues: Needed to reset 3/7 today after, I believe, builders might've set tripped something. All theatres are good.  Preshow Clips/Playlist: Once the following content (below) is ingested, we can build the playlists for Liberty Valance, Headless Woman, Swordfish.  Trailer Updates: Special Events/ AV set up: Jaws playlist all set for this evening.  Touched base with Chenelle about the private event on 3/26. Host will be sending content either this evening or tomorrow!  Reached out to Kat once I noticed we only have the 5min Western preshow and not the 15min or 25min. These are now uploading to the Share folder.  Ordering/Receiving (posters & trailers): Received posters for Disclosure .  Ordering/R...

NPP Projection Close 3/17

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set up for trivia at Trees Lounge and later put everything back in its proper storage Riding in Cars with Boys intro and screening in theater 4 this evening went well Plex kept pausing and eventually lost connection at Trees about an hour before trivia began. I was able to connect to it via the 4/6 desktop but in order to play content it kept pushing pricing plans on me. Switched to the Williamsburg account and was able to play content there but opted to keep the NBA pre-game on at Trees for the time being instead Ordering/Receiving (posters & trailers): Normal one sheets were delivered and stored behind 3/7   Ordering/Receiving (content): The remaining reels for Pieces of April were delivered and brought up to the 4/6 booth + began converting Bent to DCP for NSF26 and saved its file to the shared drive Began unzipping one of the files downloaded to the Ge...

NPP Projection Admin 3/17

To do this evening/ was completed: Tech'd Swordfish, volume logged. Tech'd all of Opening Nite shorts, info updated on tech sheet (volumes, aspect). Two of the shorts are 1.50:1 ratio which we don't have masking for at the moment, so we'll have to update that before the show. Downloading Stranger By The Lake to George Ivan drive. Also looked at Jaws tech playlist. Feature keys haven't opened yet but rest of the playlist looks good. I scheduled the tech playlist for tomorrow because it has pieces that were missing from the original. Mic set in T4, print tech'd, volume logged. Presentation Issues: Preshow Clips/Playlist: Built and scheduled Dead Pigs after teching the feature. Also built Do the Right Thing . Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Ran Riding in Cars with Boys for Desmond, wrote the volume on the info sheet. Ran loop...

NPP Projection Close 3/16

To do this evening/ was completed: Upcoming week scheduled in LMS. Inspected reels 2 - 8 of Riding in Cars... print looks good, on house reels. Finished downloading/ingesting NoBudge NSF shorts. Also ingested Dead Pigs and Do The Right Thing  to LMS. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 3/16

To do this evening/ was completed: Transferring all the Opening Nite shorts to T1 so that y'all are ready for tech tomorrow. - L Presentation Issues: Not an issue, but no one showed up to the first round in T7 ( Scream ), so we shut it off. - L Preshow Clips/Playlist: Built Project Hail Mary show playlists for the week of 3/20 -WB  ^^^(just fyi we will have to update these once the keys open - feature will likley need masking adjustments - LH) Trailer Updates: Special Events/ AV set up: Video intro for Do the Right Thing ingested - this is for Soderbergh MUI6. - L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We received the file again for Dead Pigs , which is downloading to the Share folder via Aspera. In addition to this, we received the files for Headless Woman and Stranger by the Lake . Since there's downloads going in 4/6, I am currently downloading Headless Woman to the George Ivan drive in T1. Once that's done, please download Stranger ...

NPP Projection Close 3/15

To do this evening/ was completed: The Oscars went smoothly, thanks Will for the pre-setup. All equipment broken down and returned to respective corners at the end of the night. Presentation Issues: Theater 5 Round 4: MOD walkie'd to say that the wrong movie was playing. Send Help had been scheduled when it should've been Scream. Quickly brought up lights slightly, ejected the playlist and got the right film going. No negative flip for the round after. Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 3/15

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates:  Special Events/ AV set up: Mic set up for the St Patrick's Day brunch event at Trees  Checked cable connections for the Oscars events in theaters 1 and 2 this morning and everything is in working order. Set up the spots board and wireless mics via the mixer/PA speakers and checked volume with mics 1 and 2  over the cable audio (4.5 for now but everything can be raised once the crowd comes in). Mics are charging in the booth for the time being. Left the mixer and wireless transmitter on but the spotlight breaker and board are off to avoid any white noise coming those lights during the other rounds Parade crowd at Trees Lounge delayed the step & repeat and red carpet set up for the Oscars Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: C...

NPP Projection Close 3/13

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Ingested TLR_NPP_FORECAST_0313_A_V2 and updated this week's playlists accordingly Built and scheduled an infants playlist for Sirāt this Tuesday 3/17 (pre-show, trailer, and feature volumes lowered + house lights at mid level for the duration of the trailers and film) Built all first run show playlists for the week of 3/20 (with the exception of Project Hail Mary  since we are waiting on the rest of its pre-show files) and a show playlist for Labyrinth  on 3/21-22. A few special event pre-shows remain but can be built in the coming days as the majority of these do not screen for another week Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Additional Super Mario Galaxy  posters were delivered in addition to a single  Obsession one sheet Ordering/Receiving (content): Nuke was saved as an MPEG-4 file but cannot be opened, read, or played by any of our...

NPP Projection Report 3/13 Admin

To do this evening/ was completed: Forecasts came in later today so playlists can get made tonight, New marquee letters up. Presentation Issues: Preshow Clips/Playlist: Madonna playlist all set for this weekend - L Trailer Updates: Special Events/ AV set up: Tested cable in T1, T1 and Trees. We're all set for the Oscars! -A Masking is set for Undertone in all theaters. Cues have been updated in the playlists. -A/L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Went through the entire Closing Nite program with the Cristina, Kat and John. I've adjusted the info for some of these, but all aspect ratios/volumes are in the tech spreadsheet. - L Asset tracking doc updated/checked?: Updated with Riding in Cars info (monday delivery eta!) - L Maintenance/cleaning: Sent an email about the remotes in Trees, this is mostly for bartenders but just so you're all aware we have these. -A Cue sheets updated/c...

NPP Projection Close 3/12

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Raised the feature volume for  Dirty Difficult Dangerous +  the intro and screening went very smoothly (mics/mixer are back beneath the curtain in 4...mic stand is with the rest under the curtain in 1) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Kasey Cartoon short finished downloading to the shared drive and was ingested this evening.  Wholesome zip only had 5 of the 6 necessary elements (no picture file present) so I downloaded its mp4 to the shared drive and converted it to DCP **update: 4/6 computer crashed around 8:15PM, rebooted, and lost connection to the shared drive on the desktop...reconnected and converted the file again...will update if it is successful (update: success)** Began downloading Nuke and will ingest this content tomorrow afternoon Nuke downloaded Outgoing/Shipping (content): Print/video Inspectio...

Projection Admin 3/12

To do this evening/ was completed: Tomorrow Alec and I will go through and make the masking adjustments for Undertone as I noticed today that it's slightly off of 2.2 and 2.1. We'll be fine to use the 2.2 scope masking pack for this.  Presentation Issues: Preshow Clips/Playlist: Tech'd Undertone and Reminders of Him (brought the volume up for Reminders of Him, which is surprisingly on the soft side.  Built the playlists for Ready or Not 2 .  Trailer Updates: Ingested Mother Mary trailer added it to the 3/13 playlists for Ready or Not 2 (we will update the rest once it is that time).  Special Events/ AV set up: Setup the mic in T4 with a stand off to the left side for this evening's screening of Dirty, Difficult, Dangerous . Double checked the playlist. We're all set. Just make sure spots are ready and you're all good! Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the DCPs for Project Hail Mary .  Ingested 25min, 15min, ...

NPP Projection Close 3/11

To do this evening/ was completed: Continued with Shorts downloads/conversions. Tech sheet updated. Creed went smoothly, mic back in the booth. Reel 7 shipping reel is broken so that reel is still tails out beneath the bench.  Also: not sure if this was mentioned previously but two of the T1 wireless mics are not in the booth and I did not find them beneath the screen. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin 3/11

To do this evening/ was completed: Staff Screenings are out, scheduled and blocked - L Presentation Issues: Preshow Clips/Playlist: Please continue building any playlists you can this eve. Thanks!  Trailer Updates: Special Events/ AV set up: Ran loops for Creed tonight - A Ordering/Receiving (posters & trailers): Backrooms posters came - A Ordering/Receiving (content): Received and ingested the following - Labyrinth DCP, Ready or Not 2 DCP, Reconsider This V2 25min. - L Downloaded and/or DCP'd and ingested the following shorts - Hasta En Luiz, The Contestant, Alphabet Backwards, CrabDiane (Crab Diane is finishing in DCP-o-matic right now. Also, please note that the DCP for Going Dark is currently downloading to the Share folder too. Please ingest them once they're in there. Thanks!) - L  Keys for  Madonna  should have come in today. I notified John. He and Bogi are working this out with Paramount. Update - keys are being released. - L Outgoing/Shipping (content...

NPP Projection Close 3/10

To do this evening/ was completed: Presentation Issues: I accidentally hit the wrong button on the LMS while trying to take projector 1 off its scheduled mode, which in turn caused the server to appear "offline" on Screenwriter. I loaded the  Girls About Town pre-show and tech'd it to be sure it would run without any issue, and it did, but thought it would be best to reboot the projector to avoid risking any malfunctions during the show and get the system back "online" on the LMS. Following this reboot, a warning on the touch panel stating the PIB board had lost connection was visible so I tried rebooting the machine a second time. This failed and the warning was the same as before so I reached out to Alec to help with troubleshooting the problem. He walked me through reseating the PIB board and rebooting the projector, which ultimately failed, and offered to come back to attempt it himself. Again I tried reseating the board but whatever I was doing was ineffect...

NPP Projection Report 3/10 Admin

To do this evening/ was completed: A warning came up on the T2 projector this morning for the cooling pump, saying it is dead. I reached out to Jerry and he said that as long as the projector is operational (which it is, I checked) that it's just the sensor that is dead and not the pump itself. The only way to replace the sensor is to replace the whole pump, though. He'll quote us for a replacement. I also turned the AC in booth 2 back on with this warm weather we're having. The backup option for Cable in Trees is set and working. Rather than explain at length how it works here, see the projection manual section I added on it. Please read it through next chance you get. Presentation Issues: No issues today. Preshow Clips/Playlist: Built the Dope playlist (two versions, with and without the Mubi promo), Riding In Cars Wit Boys , and also Undertone . We need a special preshow for Jaws which Kat will have on our share folder by end of day tomorrow. Scheduled shows for next ...

NPP Projection Close 3/9

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Dark Room/Non Films event in theater 3 this evening went smoothly + mics and cables were placed neatly beneath the curtain Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Ass Magic  and Lotion  for NSF but will have to wait to convert Blue  since Dope is still running through DCP-o-matic (this will finish up overnight) Jaws feature content for Singani was made available via Deluxe and should be viewable on the LMS some time tomorrow + Undertone feature content was also made available via Deluxe Began downloading Alphabet Backwards  and Good Neighbors Care  MP4 files for NSF to the Preshow & Trailers drive and will convert these to DCP some time tomorrow Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shif...
To do this evening/ was completed: For tomorrow - please kindly note that seat 1524 in T1 will need to be removed for Girls About Town . Thanks!  Removed a seat in T1 Row 5 for first round - the seat and screws are at the MOD station. Screws are labeled with a sticky note with the T1 drill next to it.  Taking the liberty of downloading some of Jack's DCPs for NSF26 since he's been out. I've got Lotion downloading to the Share folder and the file for Blue, which we'll have to DCP.  Ran house checks.  Presentation Issues: Preshow Clips/Playlist: Built the playlist for Madonna , which will need to be tech'd. Note on the keys below.  Trailer Updates: Special Events/ AV set up: Setup the mics and stands in T3 for Dark Room and went through the entire playlist to double check all cues. The dowser got caught during a lens transition, and only once, but keep an eye on it. It happens sometimes.  Ordering/Receiving (posters & trailers): Ordering/Receiving (conten...

NPP Projection Report 3/8 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Downloaded and ingested the remaining available shorts for NSF Closing Nite. I managed to get the video file for "Holey" (Opening Nite) to download fully using Safari. DCP has been ingested. I noticed the blu-ray of Dope is scheduled to arrive on Saturday which is when we're screening it. I'll send a file to convert, probably tomorrow. Outgoing/Shipping (content): Printed a return label for Martial Arts and scheduled a pickup for tomorrow, it's on the cart. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: I found screws which fit the armrest that came off the seat in T3 and put it back on before the last round. Cue sheets updated/checked (every shift): Updated the formula for Oscar shorts and all shows on the current week of cue shee...

NPP Projection Admin 3/8

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Double checked Cameraperson for picture and sound this morning in addition to running house checks throughout the building (3 and now 7, for some reason, do not have the Dolby house check playlists on their servers) Trailer Updates: Special Events/ AV set up: Ran loops for Sundays on Fire +  Cameraperson and Martial Arts of Shaolin  screenings in theaters 4 and 1 this afternoon went smoothly (mic is back up in booth 1) Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Placed  Martial Arts of Shaolin  back on its shipping reels in booth 1 Asset tracking doc updated/checked?: Maintenance/cleaning: An arm rest came loose in the front row of theater 3 but I could not fix it since I was pressed for time between reels in 1 (I brought the arm rest up to 4/6 for now. James could not find the right bolt length to fit its...

NPP Projection Report 3/7 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Air Bud went well. Chenelle had me rewind the preshow 15 minutes since they arrived late. Spoons also went well. Everything was broken down and put away after it finished. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Continued downloading and ingesting NSF closing nite shorts. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 3/6

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built and scheduled the Girls About Town  pre-show (intro slide included) for its 3/10 screening Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting Swordfish Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/LMS schedule (one manual start during the second round in theater 7 tomorrow afternoon) Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: A closed captioning device was used by a guest during the last round in theater 5 and is back in the A/V closet charging The mic from theater 4 is back in its storage bin beneath the curtain

NPP Projection Admin 3/6

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 3/6

To do this evening/ was completed: Juan fixed the leak situation in T6 booth, but Im keeping the trash bag partly on it just as we continue to monitor it the next few days.  Presentation Issues: No issues, but just a friendly reminder that if any intros go over their allotted time, be sure to communicate that change in credits/end time to MOD so they can act accordingly. Thanks!  Preshow Clips/Playlist: Got the trailer list from Kat. Built all new A1 playlists.  We can build a few SE playlists.  Built the Dirty Difficult Dangerous playlist Trailer Updates: Special Events/ AV set up: Spoons setup is still covered in T1 for easy access tomorrow morning.  Ordering/Receiving (posters & trailers): Ingested We're Making a Movie, Michael, Devil Wears Prada 2, new Forecasts Ordering/Receiving (content): Ingested ReconsiderThis_V2_5min_March Outgoing/Shipping (content): Print/video Inspection: Ran Exit 8 for  John and Cristina in T3 this morning.  Tech'd...

NPP Projection Close 3/5

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Crazy, Stupid, Love private event in theater 6 went smoothly (mixer and mics were put back in their storage spaces after the show) Spoons Toons & Booze set up went very quickly and the hosts got underway shortly after I connected them to picture and sound (they will be back over the weekend so I have organized everything neatly and left it under/beside the screen) + mics are charging in booth 1 Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Removed the  Crazy, Stupid, Love feature content and host birthday video from the LMS and 6 after the event ended Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: The ceiling above the projector in theater 6 began leaking briefly during the private event. The leak was slow so I covered the projector with a garbage bag and sent an ...

Projection Admin 3/5

To do this evening/ was completed: Tech'd The Bride, Hoppers, Dirty Difficult Dangerous . - L Friendly reminder to keep the setup for Spoons as we have it again this weekend!  Presentation Issues: Preshow Clips/Playlist: Ingested Drama teaser trailer and updated all A1 R rated playlists for both today and this next week. Confirmed everything with Kat so that the playlists are accurate and time sensitive - L Trailer Updates: Special Events/ AV set up: Brought the gear in from T2 to T1 and got everything setup for Spoons and went through it with Will. Also setup for the private event in T6 tonight and added a mic just in case they'd like one. Everything is built into the playlist and ready to go. - L Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Madonna feature, Doctor Death grip short (Holey is still settling on Share fodler). - L Outgoing/Shipping (content):  Print/video Inspection: Started inspecting Swordfish , which is in excellent cond...

NPP Projection Close 3/4

To do this evening/ was completed: Inspected Girls About Town, good condition, on house reels. Both intros tonight went smoothly, mics broken down afterward. Started downloading/ingesting NSF26 shorts, tech spreadsheet updated. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 3/4 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Set 1.37 masking for Dr. T and set volume. Playlist is updated. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the short "Leaf Peeper" for NSF Opening Night to the LMS, downloaded "Long's Long Lost" for Closing Night which is currently unzipping. Ingested Exit 8 to the LMS and sent it to Theater 3. Cinema team is watching this one on Friday. Outgoing/Shipping (content): Packed up Pulp Fiction with the return labels provided by HFC and scheduled a FedEx pickup for tomorrow. It's on the cart. Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cable is stable again in Trees. Thanks to Vlad for running the cables this morning. We now have two options for screening cable in Trees, I tested the one we'd been using (Digital Link) with the new cable run by Vlad and it...

NPP Projection Close 3/3

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Double checked The 5000 Fingers of Dr. T and Hank's Saloon  show playlists for tomorrow night's events (for the latter, I removed the one trailer but left the welcome, feature, and Romcom tip clips in place before the NH slide which needed to be added for the intro. I also placed a "server skip to next clip" cue here so be mindful of that and/or remove it if skipping ahead manually is preferred. Take a look at this tomorrow morning and adjust accordingly if necessary) Trailer Updates: Special Events/ AV set up: Finished the rest of the set up for trivia at Trees Lounge this afternoon (thank you Alec for bringing out the table in advance) and placed everything away after the event ended Pulp Fiction encore screening in theater 1 this evening went super smoothly + projectors were cleaned/exhausts shut following the show Ordering/Receiving (posters & trailers): Over Your Dead Body one she...

NPP Projection Admin 3/3 + 3/2 Close

To do this evening/ was completed: Cutting Through Rocks went smoothly, mics back in booth. LMS scheduled for the coming week. Tech'd Dark Room shorts/playlist with Cristina, all good to go, added some volume cues and Digital 1 cues. Also looked at Soderbergh intro and 5000 Fingers feature, apparently the keys came through though I didn't see them in either inbox. The variable masking preset comes in just a little too much with 1.37 lens file so there's a little bleed at the moment, if someone wants to adjust that tomorrow before the show. Also also looked at SoF print, volume logged. Girls About Town print arrived this afternoon, resting in T1.  Dirty, Difficult... ingested to LMS. Trivia is set up. Did not look at Hank's.... if that needs to be looked at again. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspe...

Projection Admin 3/2

To do this evening/ was completed: Told Cristina we didn't have Girls About Town for tomorrow's tech, but everything else is good to go. I made a playlist the other day for the Dark Room shorts and additional content pieces, all of which have been tech'd, so Jack and Cristina can just tailor things tomorrow. Should be a breeze. Shaolin also ready. - L Presentation Issues: Preshow Clips/Playlist: Built the playlists for Air Bud and Creed - L Trailer Updates: Special Events/ AV set up: We are all setup for the Cutting Rocks show in T2 this evening. Three chairs and a mic stand are setup off to the side. Desmond left notes for Jack, which I've confirmed with him. Went through the playlist today and adjusted it to have the correct slide for both the intro and q&a. Mics will be brought down once things kick off but they're currently charging in the booth. - L Ordering/Receiving (posters & trailers): Updated  Mortal Kombat II posters were delivered and stored beh...